Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1810 (OG) |
191737-070016-Construction of Shingled Road from Angori to Sarak (7 Kms) in Central Kurram (Revised). [MA] |
Kurram HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 168.881 | 173.197 | 14.774 | 0 | 0 | 0 | 173.197 | 0 | 100% |
100% May - 2021 |
Physically and financially complted
Delete from Draft ADP |
No Image |
1811 (OG) |
191758-170111-Widening, Imprt and B/T of 11 Kms Road in Central Kurram. 1) Chinerak Toraywray Road (Ph-V, 4 Kms), 2) Sultani Bridge to Msod Nika Ziarat (Ph-I, 3 Kms) [MA] |
Kurram HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.8 | 131.663 | 68.137 | 45.992 | 45.992 | 45.975 | 177.638 | 0 | 100% |
89% May - 2021 |
Earth work completed. S/Work & Road work in progress.
Can be completed if balance funds are released |
No Image |
| |||||||||||||||||||
1812 (OG) |
191798-180363 - Construction, & Rehabilitation of existing Blacktop roads in Upper District Kurram. [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 204.243 | 30 | 45 | 32.562 | 32.562 | 32.42 | 62.42 | 129.243 | 37% |
31% May - 2021 |
03 Packages
1 In progres
2 Site not yet identifed
3 Site not yet identifed |
No Image |
Package I
1. Const: of BTR of remaining portion Sayed Abass Jan Main Road 0.6 KM
2. Const: of BTR of Road Korizgai to Malana 2 KM
Package II
1. Const: of BTR of Ghulam Jan Check post to Inter Link Faqeer Baba and Khawar Colony Parachinar 2 KM
2. Const: of BTR road of Main Kirman road to College Colony 1 KM
Package III
1. Const: of BTR of road form Zahir Mila to Tajak Qabristan 2 KM
2. Const: of BTR of road Imam Bagh to Zore Kali Linking to Barota Mir Kalam Road | |||||||||||||||||||
1813 (OG) |
191799-180364 - Widening & Rehabilitation of existing Blacktop road from Inzera Check Post to Shaheedano Dand (Ph-III) (3 Kms). [MA] |
Kurram HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 66.204 | 32.75 | 33.454 | 30.852 | 30.852 | 24.431 | 57.181 | 0 | 100% |
86% May - 2021 |
Length 03-Km
Earth work & Structre work in progress.
Completion : June-2021. |
No Image |
1814 (OG) |
191823-190258 - Construction of Black Topped Roads in Tribal District Kurram. [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 149 | 25.557 | 35 | 25.215 | 25.215 | 21.87 | 47.427 | 88.443 | 41% |
32% May - 2021 |
02- Units
Work in progress. |
No Image |
| |||||||||||||||||||
1815 (OG) |
191709-170140-Construction & Black Topping of Roads in Orakzai Agency. [MA] |
Orakzai HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 133.027 | 87.251 | 45.776 | 12.774 | 12.774 | 9.817 | 97.068 | 0 | 100% |
73% May - 2021 |
03- Units
Length 10.5 Km
S/B, B/C, S/W & Asphalt premix in progress.
Cannot be completed |
No Image |
1) Totani to Darak road (4-Km)
2) Nikot to Akheria Kalay (5-Km)
3) Ghiljo to Dabbori via Sampog (1.3Kms) | |||||||||||||||||||
1816 (OG) |
191710-170141-Construction & Black Topping of Ghuzgharh Road Phase-II in Orakzai Agency. [MA] |
Orakzai HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 61.5 | 42.75 | 18.75 | 1.55 | 1.55 | 1.55 | 44.3 | 0 | 100% |
72% May - 2021 |
S/B, B/C, S/W & Asphalt premix in progress.
Completion : June-2021. |
No Image |
Ghiljo Orakzai | |||||||||||||||||||
1817 (OG) |
191711-170142- Rehabilitation of Road in Lower Sub Division of District Orakzai. (5 kms) [MA] |
Orakzai HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.679 | 0 | 46.679 | 12.956 | 12.956 | 11.82 | 11.82 | 2 | 96% |
24% May - 2021 |
Work in progress
Demand Rs: 5 M
Completion : June-2021. |
No Image |
Hassan Zai Dara Road 5 KM | |||||||||||||||||||
1818 (OG) |
191735-050169-Improvement / BT of Road from Pacho Pana to Dapar (15 Kms), Orakzai Agency (Revised). [MA] |
Orakzai HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.15 | 73.434 | 25 | 5 | 5 | 5 | 78.434 | 99.716 | 50% |
40% May - 2021 |
Work in progess. |
No Image |
1819 (OG) |
191773-170370-Construction of Road from Kasha to Darran Via Bego Tangi Phase-I in Orakzai Agency. [MA] |
Orakzai HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 157.233 | 142.715 | 10.792 | 12.533 | 12.533 | 7.533 | 150.248 | 3.726 | 98% |
96% May - 2021 |
S/B, B/C completed S/W & Asphalt premix in progress.
Reappropiration Demand Rs; 5 M
Completion : June-2021. |
No Image |
Hassanzai Dara Road (5-KM) | |||||||||||||||||||
1820 (OG) |
191784-180162- Construction & black topping of roads in District Orakzai. [MA] |
Orakzai HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 186.66 | 0 | 25 | 42.587 | 42.587 | 34.704 | 34.704 | 161.66 | 13% |
19% May - 2021 |
Work in progress.
Demand 5.8 M |
No Image |
1 Palosi Road 7.2 KM ? Rs: 67.565 M
2 Samana Sarmalo Road ? Rs: 64.985 M
3 Remaining portion of Balkot Road 3.5 KM ? Rs: 53.910 M | |||||||||||||||||||
1821 (OG) |
191824-190259 - Construction of Black Topped Roads in Tribal District Orakzai. [MA] |
Orakzai HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 116 | 0 | 10 | 10 | 10 | 5.347 | 5.347 | 106 | 9% |
5% May - 2021 |
1) Pak Army
2) E/Work cutting in progress.
3) E/work cutting in progress.
Demand 10 M |
No Image |
Lei Seri To Khatango (Sheikhan) 4 KM | |||||||||||||||||||
1822 (OG) |
191706-140045-03 No. RCC Bridge in Tirah Maidan, Khyber Agency, Bagh Maindan, Bor Baght Toor Toot. [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 80.234 | 67.234 | 3.311 | 3.311 | 3.311 | 0 | 67.234 | 9.689 | 88% |
84% May - 2021 |
3- Units
2- Work in progress.
1- Lar Bagh =24 M
Boring completed Sub structure & S/S are complted. Approaches in progress.
ii) Pile completed.
iii ) Abutment
iv) Girdar + launching complted.
v) Approahes in progress.
2- Bar Bagh 18 M
Boring completed Sub structure & S/S are complted. Approaches in progress.
ii) Pile completed.
iii ) Abutment
iv) Girdar + launching completed.
v) Approahes in progress.
3) Work not yet started on RCC Bridge Toor Tooth.
Notice issued to contractor for commencement of work.
Completion : June-2021. |
No Image |
1-New Bagh connecting Lar Bagh to Bar Bagh.
2- BOK Bagh connecting Haider Kandow to BOK Bagh.
3) RCC Bridge at Toor Tooth connecting Haider Kandow.
| |||||||||||||||||||
1823 (OG) |
191707-160487-Construction of Road Connecting from Bagh Adam Khel Tribe (Tirah Maidan, Khyber Agency [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 246.08 | 159.973 | 30 | 30 | 30 | 3.542 | 163.515 | 56.107 | 77% |
66% May - 2021 |
Work in progress. |
No Image |
| |||||||||||||||||||
1824 (OG) |
191755-170079-Constn of B/T road in Tehsil Jamrud and landikotal khyber agency. [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.64 | 160.18 | 38.493 | 38.493 | 38.493 | 18.525 | 178.705 | 0.967 | 100% |
90% May - 2021 |
4 Units
Work in progress
90% work completed.
Will be complted if Rs. 27.46 m given ( 19 M balance allocation ) |
No Image |
| |||||||||||||||||||
1825 (OG) |
191756-170080-Constn of B/T road in Bara sub division khyber agency. [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.184 | 113.899 | 68.663 | 68.663 | 68.663 | 3.567 | 117.466 | 16.622 | 92% |
59% May - 2021 |
Total 5- Uinits
4- Units work in progress.
Work on unit at Sr. No. iii was stoppped due to local dispute.
Cannot be completed in CFY as local dispute. |
No Image |
| |||||||||||||||||||
1826 (OG) |
191757-170081-M&R / Rehabilitation, Construction & Improvement of Road Network in Khyber Agency. [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 256 | 242.518 | 16.482 | 9.868 | 9.868 | 7.924 | 250.442 | 0 | 100% |
98% May - 2021 |
Total 8 Units
Work in progress on all units.
Cannot be complted in CFY as one uint disputed |
No Image |
| |||||||||||||||||||
1827 (OG) |
191785-180121 - Construction & blacktopping of road in Tehsil Jamrud and landikotal District Khyber. [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 136.814 | 3.307 | 35 | 15.215 | 15.215 | 15.215 | 18.522 | 98.507 | 28% |
14% May - 2021 |
2 - Packages
package-1, Court Case.
Land dispute reported to Adminstration Deptt: |
No Image |
1. Shahalam Killi Mullagori 2.6 KM raod
2. Marble chowk to Nawa Killi & Raees Khan Killi Mulagori 4.10 KM | |||||||||||||||||||
1828 (OG) |
191786-180122 - Construction & blacktopping road in Tirah Maidan and Bara District Khyber. [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.03 | 86.004 | 40 | 16.388 | 16.388 | 16.388 | 102.392 | 73.026 | 63% |
51% May - 2021 |
6- Units
S/B, B/C, S/Work in progrss on all units. |
No Image |
| |||||||||||||||||||
1829 (OG) |
191787-180123 - Rehabilitation, Construction and Improvement of Road Network in District Khyber. [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 98.17 | 39.4 | 63.18 | 29.828 | 29.828 | 12.67 | 52.07 | 0 | 100% |
53% May - 2021 |
2 Units
work in progress.
Upto 90% work completed.
Cannot be completed |
No Image |
| |||||||||||||||||||
1830 (OG) |
191805-170435 - Const. of B/T Road from Toortoot Khyber Agency to Dogar Kurram Agency, (4-KMs) Balance Portion. (GD) [MA] |
Kurram HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120.063 | 22.359 | 25 | 10.868 | 10.868 | 0 | 22.359 | 72.704 | 39% |
19% May - 2021 |
Shifted to Kurram agency
Work order issued. |
No Image |
1831 (OG) |
191809-170445 - Construction of Black Topping of Road from Sher Khel to Serai Kandow upto Dars Masjid (10.5 KMs) & Sarzai to Sangara Balance Portion (2.5 KMs) in Tirah, Khyber District (GD). [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 210.494 | 109.609 | 24 | 24 | 24 | 10.563 | 120.172 | 76.885 | 63% |
57% May - 2021 |
Length 13 Km - 2.5 km asphlat laid |
No Image |
1832 (OG) |
191821-190256 - Construction of Black Topped Roads in Tribal District Khyber. [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 152.65 | 96.593 | 66.705 | 34.256 | 34.256 | 34.256 | 130.849 | 0 | 100% |
86% May - 2021 |
(Length- 4.283 Km)
E/W , S/B ,B/C &
S/Work in progess.
Cannot be complted |
No Image |
| |||||||||||||||||||
1833 (OG) |
191830-190351 - Construction of 6-Km B/T Road in District Khyber(CMD) [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 125.93 | 0 | 71.087 | 31.684 | 31.684 | 31.684 | 31.684 | 54.843 | 56% |
25% May - 2021 |
Procurement under process.
(Cannot be completed in CFY as the PFY of Rs. 28.13 M incorrect)
Court Stay vacated |
No Image |
Const: of 6KM road from Dars Masjid to Shaddlly in Tirah Khyber | |||||||||||||||||||
1834 (OG) |
191833-190356 - Design & Construction of Road Toormor Lodhi Post (4.283 km) & Spina Soka Post(1.125 km) in District Khyber. [MA] |
Khyber HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 84.101 | 28.75 | 70.351 | 0 | 0 | 0 | 28.75 | 0 | 100% |
34% May - 2021 |
80% Earth work completed
Cannot be complted due to revision. Pre- PDWP held on 21-05-21 |
No Image |
1835 (OG) |
191753-150048-Construction of Black Topped/Link Roads in various Areas of Mohmand Agency (Revised). [MA] |
Mohmand HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 280.361 | 190.054 | 20 | 20 | 20 | 3.409 | 193.463 | 70.307 | 75% |
69% May - 2021 |
(Length=14 Km)
6-Units
10-Km completed & 4 work in progress. |
No Image |
1 2.5 KM B/T road form Kamali Halimzai to Tamanzai
2 2-Km B/T road from Main Pandiali road to Village Gardai Pandiali
3 2-KM B/T road from Main Ghallanai road to Mullayan Kamali Halimzai
4 -KM B/T road from Main Ambar road soor dagi to Kharai Darra Banaras Killi Ambar
5 2-KM Ghallani by pass road
6 4-KM B/T from Ghaiba Khwar to Sangar via Remi Khel Halizai. | |||||||||||||||||||
1836 (OG) |
191754-170045-Construction of 13.5 Kms Black Topped Link Roads in Different Areas in Mohmand Agency. [MA] |
Mohmand HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.724 | 149.721 | 49.003 | 22.651 | 22.651 | 21.821 | 171.542 | 0 | 100% |
86% May - 2021 |
(Length=13.5 Km)
Delete . Drop from ADP |
No Image |
| |||||||||||||||||||
1837 (OG) |
191770-170390-Construction of Black Top Roads in Mohmand Agency. [MA] |
Mohmand HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.464 | 62.183 | 9.002 | 6.002 | 6.002 | 3.824 | 66.007 | 5.279 | 93% |
86% May - 2021 |
Delete . Drop from ADP |
No Image |
1 3 KMS road in Sangar Ambar Area
2 2 KMS road from Mateen to Babi Khel Halimzai
| |||||||||||||||||||
1838 (OG) |
191794-180246 - Construction/ Improvement and Rehabilitation of Black Topped Roads in Upper, Lower and Baizai Sub-Division in District Mohmand. [MA] |
Mohmand HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 159.997 | 0 | 20 | 0 | 0 | 0 | 0 | 139.997 | 13% |
- May - 2021 |
04 - Units
Work stopped due to Court case. |
No Image |
1 2-Kms road Mumad Gul Zairat Killi
2 2-Kmsroad Kotagari to Shahgai
3 2-Kms road Mian Akrab Dag
4 2-Kms road Danish Kool to Pardas Kore | |||||||||||||||||||
1839 (OG) |
191796-180250 - Rehabilitation of Black Topped Roads in District Mohmand. [MA] |
Mohmand HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 41.695 | 0 | 41.69 | 0 | 0 | 0 | 0 | 0.005 | 100% |
- May - 2021 |
02- Compoenents.
Work stopped due to Court Stay.
Completion : June-2021. |
No Image |
1 Reh: of 03 Kms Mian Road to Bhai Kore at Ekkaghund
2 Reh: of 04-Kms from Ghallani Mamund Road to Ato Khel | |||||||||||||||||||
1840 (OG) |
191820-190255 - Construction of Black Topped Roads in Tribal District Mohmand. [MA] |
Mohmand HW |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 102 | 0 | 15 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
Site identification of 5 km received from District Administration. Court stay |
No Image |
1841 (OG) |
191727-140383-Improvement & Widening of Pashat Raghagan road Phase-II Bajaur (05 Kms). (GD) [MA] |
Bajaur HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140.916 | 128.64 | 12.276 | 5.835 | 5.835 | 5.835 | 134.475 | 0 | 100% |
95% May - 2021 |
Scheme complete. Delet from darft ADP |
No Image |
1) Pashat Raghan road
2) Constn of RCC Bridge in Km-5 | |||||||||||||||||||
1842 (OG) |
191748-170012-Construction and Black Topping of 17.8-Kms Roads in District Bajaur. [MA] |
Bajaur HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 388.005 | 81.784 | 25 | 50 | 50 | 50 | 131.784 | 281.221 | 28% |
34% May - 2021 |
4 - Units
1- Completed
2- In progress.
3- Work resumed
4- Work in progress on Km-1.4. The scheme has been subjudice. Court has been approached for early vacation of status quo.
Demand Rs. 50 M |
No Image |
| |||||||||||||||||||
1843 (OG) |
191749-170013-Maintenance & Rehabilitation of 22-kms Existing Black Topped roads in Bajaur Agency. [MA] |
Bajaur HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 288.191 | 216.979 | 71.212 | 71.212 | 71.212 | 31.713 | 248.692 | 0 | 100% |
86% May - 2021 |
7- Units
5- completed.
1 - In progress.
1- unit -executed by Pak Army
Can be complted provided balance allocation funds of Rs. 39.499 m provided. |
No Image |
| |||||||||||||||||||
1844 (OG) |
191791-180203 - Construction and Black Topping of Roads in District Bajaur. [MA] |
Bajaur HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 290.545 | 72.478 | 30 | 34 | 34 | 14.041 | 86.519 | 188.067 | 35% |
30% May - 2021 |
03- Units
2 unit - in progress.
1 unit-(dara to Lar mulasaid) - work stopped due to Law and Order situation .
Demand Rs. 25 M |
No Image |
1) Mandal to Takht road 3-km
2) More Dara road (03-Km)
3) Darra to lar Mulasaid (03-Km) | |||||||||||||||||||
1845 (OG) |
191792-180204 - Rehabilitation of Existing Black Topped roads in District Bajaur. [MA] |
Bajaur HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 140.113 | 99.025 | 41.088 | 41.088 | 41.088 | 41.088 | 140.113 | 0 | 100% |
100% May - 2021 |
03- Units
Road Work completed. S/Work & Premix in Progress.
T.S submitted to SE North Tribal Circle Peshawar.
Can be complted provided balance funds of Rs. 10.99 m provided as per TS. |
No Image |
1) Ghar Shamozai road 5-Km
2) Badan Mamund road 3 Km
3) Shahgo to Kharkai road (5-km)
| |||||||||||||||||||
1846 (OG) |
191844-170402-Construction of Bara ByPasses Road from Nogazi Baba to Sheikhan Sports Stadium TD Khyber 7 KMs [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 517.729 | 65 | 30 | 30 | 0 | 0 | 65 | 0 | - |
- May - 2021 |
No Image | |
1847 (OG) |
191722-170248-Construction of BT Roads in Sub-Division Tank. [MA] |
Tank |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 169.379 | 165.226 | 9.653 | 9.653 | 9.653 | 9.653 | 174.879 | 0 | 100% |
100% May - 2021 |
06- Units - Completed
Delete from Draft ADP |
No Image |
| |||||||||||||||||||
1848 (OG) |
191723-170249-Maintenance & Rehabilitation of Existing BT Roads in FR Tank. [MA] |
Tank |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.856 | 15.06 | 74.796 | 74.796 | 74.796 | 42.033 | 57.093 | 0 | 100% |
64% May - 2021 |
Work in progress.
Cannot be completed due to miscreant attack on Contractor camp. |
No Image |
Rehab: of Main Umar Adda Pirtangi from KM 15 to 19 Damaged Portion | |||||||||||||||||||
1849 (OG) |
191814-180452 - Construction of Blacktop road (3 km) in Sub-Division Tank. [MA] |
Tank |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 74 | 52.087 | 29.913 | 28.5 | 28.5 | 25.954 | 78.041 | 0 | 100% |
100% May - 2021 |
03- Units Completed
Delete from Draft ADP |
No Image |
| |||||||||||||||||||
1850 (OG) |
191715-160015-Construction of New Black Topped Roads & Rehab: of existing roads in FR D.I.Khan. [MA] |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.301 | 204.503 | 4.299 | 4.299 | 4.299 | 1.325 | 205.828 | 0 | 100% |
100% May - 2021 |
08 -Units
Completed =4
In progress=4
Compleetd . Delete from draft ADP. |
No Image |
| |||||||||||||||||||
1851 (OG) |
191761-170277-Construction of BT Roads in Sub-Division DI Khan. [MA] |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 190.941 | 91.794 | 35 | 37.402 | 37.402 | 37.402 | 129.196 | 64.147 | 66% |
68% May - 2021 |
06-Components
Work in progress all units. |
No Image |
| |||||||||||||||||||
1852 (OG) |
191762-170278- Rehabilitation of Communication Infrastructure in Sub-Division D.I Khan. [MA] |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 61.254 | 34.295 | 28.459 | 28.459 | 28.459 | 20.872 | 55.167 | 0 | 100% |
90% May - 2021 |
07-Units
E/W , DST, TST & WR
in progess.
Cannot be Completed due to Local Dispute. Work Stopped by Locals. |
No Image |
| |||||||||||||||||||
1853 (OG) |
191811-180516 - Construction of Black Topped Roads in Sub-Division DI Khan. [MA] |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 72.157 | 37.397 | 32.16 | 10.856 | 10.856 | 7.143 | 44.54 | 2.6 | 96% |
62% May - 2021 |
(Length- 5.8 Km)
E/W , S/B ,B/C &
S/Work & TST in progess.
Cannot be Completed due to Local Dispute. Work Stopped by Locals. Pak army involved for the solution of the dispute . |
No Image |
| |||||||||||||||||||
1854 (OG) |
191812-180517 - Reconstruction and Rehabilitation of Existing Roads in Sub-Division DI Khan. [MA] |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.29 | 52.995 | 4.29 | 8.58 | 8.58 | 8.532 | 61.527 | 0.005 | 100% |
100% May - 2021 |
02- Units
(Length- 5 Km)
Completed.
Completed. Delete from Draft ADP |
No Image |
| |||||||||||||||||||
1855 (OG) |
191828-190283 - Construction of Black Topped Roads in Tribal Sub-Divisions Jandola & Darazinda. [MA] |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.546 | 16.16 | 30.151 | 30.151 | 30.151 | 28.887 | 45.047 | 11.235 | 80% |
78% May - 2021 |
02- Units
Work in progress.
Cannot be complted due to local dispute. |
No Image |
| |||||||||||||||||||
1855 (OG) |
191828-190283 - Construction of Black Topped Roads in Tribal Sub-Divisions Jandola & Darazinda. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 98.714 | 0 | 64.554 | 64.554 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
Completion : June-2021. |
No Image |
1855 (OG) |
191828-190283 - Construction of Black Topped Roads in Tribal Sub-Divisions Jandola & Darazinda. [MA] |
Tank |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.968 | 5.08 | 0 | 0 | 0 | 0 | 5.08 | 35.888 | - |
12% May - 2021 |
03- Units
1.
2.
3.
Asman Kali Gulistant Kot to Pirtangi Road Cannot be completed due to site dispute |
No Image |
| |||||||||||||||||||
1856 (OG) |
200126-Construction of 4Kms BTR Shakir Kalay Area Darazanda Sub Division |
D.I.Khan HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.694 | 0 | 20 | 20 | 20 | 20 | 20 | 79.694 | 20% |
20% May - 2021 |
Earth work in progress. |
No Image |
1857 (OG) |
191726-170263-Imprt / Constn of Main Tajori Shadi Khel Road from Chiga Lar to Shadi Khel (02 Kms), and Constn of Causeway Main Tajori Shadi Khel Rd at RamiKhel, Yargul Khel Algad, FR Lakki. [MA] |
Lakki Marwat HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 48.423 | 36.389 | 13.852 | 13.852 | 13.852 | 9.346 | 45.735 | 0 | 100% |
94% May - 2021 |
A- Road work completed.
B- Causway in progress.
Demand Rs: 2.3 M
Cannot be completed due to revision involment. |
No Image |
| |||||||||||||||||||