Progressive Review for the month(s) of : May - 2021,

Showing Page Number : 55 of 69

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
1754
(OG)
160498-Provision for Rehabilitaiton of flood/torrential Affected Roads & Bridges. (SDG)
Karak
30-11--1 30-11--1 - 30-11--1 - 85 18.44 4.5 4.5 4.5 4.499 22.939 62.06 27% 27%
May - 2021
08- components Work in progress on all units. Demand RS. 20 M
No Image
1. Indus Highaway Jehangari Inzar Mor Link Road? Rs; 5.85 M
2. Karak Surdog Road 18-KM.?. Rs; 9.80 M
3. Serak Odin Shah Road 6-KM .?. Rs; 9.80 M
4. Ahmad Abad Khojaki Killa Link Road Mohabati Killa 8.5 KM.?. Rs; 8.24 M
5. Tangori Sar Saraj Bab I/C Wanki Siraji Khel Dabli Lawagher Link Road 11- KM.?.. Rs; 17.02 M
6. From indus Highway via Dabli Lawagher to Faqir Abad 10-KM ? Rs; 20.917 M
7. Ali Khel Chowk via Palosa Sar to Ghoundi Shamshaki Road i/c Link Road to Gororhi Char Khel 7-KM.?. Rs; 14.041 M
8. Ali Khel Chowk to Zabi Chani Khel Road 5-KM ? Rs; 5.041 M
1754
(OG)
160498-Provision for Rehabilitaiton of flood/torrential Affected Roads & Bridges. (SDG)
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 4.389 2.206 2.5 2.5 2.5 0 2.206 0 100% 50%
May - 2021
RCC work for pile protection completed. Wire crate constn in progress. Notice issued to the contractor for the delay work.
No Image
Restoration of damages and protection works o
1754
(OG)
160498-Provision for Rehabilitaiton of flood/torrential Affected Roads & Bridges. (SDG)
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 44.541 34.883 4 4 4 3.879 38.762 5.658 87% 87%
May - 2021
Scheme completed Rs. 4 M required to clear the contractor laiblity.
No Image
1. Rehabilitation of Causeway at Warsak Jamrud road on sufaid Khawar? Rs: 19.191 M
2. RehaBbilitation of takhatabad Road District Peshawar? Rs: 25.35 M
1754
(OG)
160498-Provision for Rehabilitaiton of flood/torrential Affected Roads & Bridges. (SDG)
Provincial
30-11--1 30-11--1 - 30-11--1 - 690.864 0 30 30 30 0 0 0 - -
May - 2021
No Image
1754
(OG)
160498-Provision for Rehabilitaiton of flood/torrential Affected Roads & Bridges. (SDG)
PS
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
No Image
1754
(OG)
160498-Provision for Rehabilitaiton of flood/torrential Affected Roads & Bridges. (SDG)
Swabi
HW
30-11--1 30-11--1 - 30-11--1 - 15.071 17.538 0 0 0 0 17.538 0 - 100%
May - 2021
Completed.
No Image
Jandah Pabani road PK-35
1754
(OG)
160498-Provision for Rehabilitaiton of flood/torrential Affected Roads & Bridges. (SDG)
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 36.854 27.204 0 0 0 0 27.204 9.65 - 74%
May - 2021
9/9units completed.
No Image
1) Construction of RW on Taran road UC Taran road (TS 3.454)
2 Qambar to Fizagat Bypass road (TS 0.974)
3 Lalkoo Steel Bridge (Protection work) (TS 3.077)
4 Kuz Lalkoo road (Protection work) (TS 3.127)
5 Chail Shinkoo Bashigram Road (TS 7.440
6 Bandai to Sigram Road (Protection work)
7 Meramai Madyat RCC Culvert  (TS 0.821)
8 Spardada Steel Brdige (Protcion work)
9 Proection work of Landikass Janu Bridge (TS 0.910)
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Abbottabad
HW
30-11--1 30-11--1 - 30-11--1 - 47.76 26.615 4.5 4.5 4.5 4.5 31.115 16.645 65% 65%
May - 2021
3/3 units -work in progress. 2. EW 70 % Structure work complted Demand Rs. 10 M
No Image
1) Pandu Thana road District Abbottabad
2 Widening/Carpetting of Bio - pull Mohri Road Abbottabad
3 Jhangi Khoja Banda Qazi UC Jhangi Banda Qazi  .?.?.?. TS 2.225
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 70.99 27.431 15 15 15 15 42.431 28.559 60% 60%
May - 2021
Length 1 Km - earth work 40% completed. Demand Rs. 20 M
No Image
  1. Kotka Sherdad (Matiullah), Bannu 1 KM
  2. Village Biland Baist Khel 1 KM
  3. RCC Bridge over Kachkot River at Miranshah 30 M 13 0 M approch
  4. Kotka Imam Shah Mulagan to Kafshi Khel Babojan Kala 1 KM
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 16.8 5.5 5.5 5.5 5.499 22.299 0 100% 100%
May - 2021
Length 2 Km - 95% work completed. Demand Rs. 2 M
No Image
Thakot Banna road (29 Km), Battagram
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Charsadda
HW
30-11--1 30-11--1 - 30-11--1 - 57.674 126.982 9.5 9.5 9.5 9.5 136.482 0 100% 100%
May - 2021
Completed (Package-1 (length - 5 Km (12 ft). Package-II, III & IV in progress. Demand Rs: 35 M
No Image
1. Package-I: 06 No. Different roads (4.95 Km)? Rs: 57.674 M
2. Package-2: 07 Nos Different roads ? Rs: 59.376 M
3. Package-3: 07 Nos Different roads ? Rs: 59.591M
4. Package-4: 05 Nos Different roads ? Rs: 49.400 M
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 15 3 2 2 2 2 5 10 33% 33%
May - 2021
Work started. Demand Rs. 3.7 M,,, Road way cutting in progress.
No Image
Rehabilitation/repair of Arkari Valley road Chitral
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 40 9.996 1 1 1 1 10.996 29.004 27% 27%
May - 2021
B/Course & Asphalt completed. Structure work & E/Work in progress
No Image
Improvement/rehabilitation of various roads i
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 20 0 5 5 5 5 5 15 25% 25%
May - 2021
Earth and structure work completed. Demand Rs. 20 M
No Image
i) Constn:/Widening of Adhokey Bala road PK-9
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Haripur
HW
30-11--1 30-11--1 - 30-11--1 - 642.572 0 32.75 32.75 32.75 32.75 32.75 609.822 5% 5%
May - 2021
Work in progress on all 62 units.
No Image
1) Constn:/reh: of link road Chappra to Kalal
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Karak
30-11--1 30-11--1 - 30-11--1 - 29.241 6.701 4 4 4 4 10.701 18.54 37% 37%
May - 2021
02-components i) Earth work 80% completed. S/B, WBM & Masonry work 80% completed. Demand RS. 15 M
No Image
1.
i. GPS Wadan Khel to GHSS Dabli Lawagher i/c Link road of Naiz Wali Koroona? Rs; 19.250 M
ii. Nawab Khan Koroona to Yousaf Khan Koroona (out of saving) 0.4-KKM
2. Const: of BTR from GHSS to Sam Koroona Dabli Lawagher PK-41 Karak? Rs; 9.991 M
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 25 16.593 1 1 1 0 16.593 7.407 70% 66%
May - 2021
Completed.
No Image
  1. Construction and Rehabilitation of Diyar Abad to Master Ashraf Khan Killi 2.20 KM
  2. Sattar Khan Killi road Umer abad Mardan
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 677.291 275.378 21 21 21 21 296.378 380.913 44% 44%
May - 2021
14- Units Work in progress on all units.
No Image
  1. Internal raod U/C Kheshgi Bala
  2. Internal raod U/C Taru Akbarpura
  3. Internal raod U/C  Chowki Mumrez
  4. Internal raod U/C Badrash
  5. Dran/Pavement of Street & Internal Road at Misalabad UC Nawa Kili
  6. Dran/Pavement of Street & Internal Road at Meraji Kersari & Lakari
  7. Internal raod U/C Spin Knai Khwar at Kaka Sabib Road
  8. Internal raod U/C Noserhea Kallan
  9. Balance portion Pashtoon Ghari
  10. Pavement of Street  in UC Manki Sharif & Pahari Kati Khel
  11. Pavement of Street in Shaheed UC Nawa
  12. Pavement of Streeet in Luqmanabad Qamar khel
  13. Payement of Street in Village Azakkhel Balal Azakhel
  14. Internal Street pavet: of Dag Besud Balu & Shahkot
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 292.329 67.178 59.75 59.75 59.75 36.893 104.071 165.401 43% 36%
May - 2021
05 Packages- 02 Packages Completed 03 Packages work In progress. Deamnd Rs. 50 M
No Image
1. Various roads in PK-66.?. Rs: 30.00 M
2. Various roads in PK-69 & 70.?. Rs: 45.503 M (TS 14.603)
3. Various roads in PK-68.?. Rs: 30.00 M (TS 4.667)
4. Various roads in PK-68 & 69.?. Rs: 48.10 M (TS 12.164)
5. Various roads in PK-79.?. Rs: 40.00 M
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Provincial
30-11--1 30-11--1 - 30-11--1 - 2131.395 0 75 75 75 0 0 0 - -
May - 2021
2nd Rev approved.
No Image
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
PS
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 37.5 0 0 0 - -
May - 2021
No Image
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Swabi
HW
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
DCE for Rs.50.125(M) submitted for approval.
No Image
1755
(OG)
160622-F/S, Design and Rehabilitation of C&W roads in Khyber Pakhtunkhwa
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 63.673 49 0.27 0.27 0.27 0.269 49.269 14.403 77% 77%
May - 2021
02- Units 1- Completed 1- Work in progress.
No Image
1) Construction of road from Awarwi to Spero 2 KM (TS 24.532)
2 Const: of Road form B/T of Balasoor Danderai 02 KM  (TS 26.442)
1756
(OG)
170173-Provision for Liabilities of Land Compensation
Abbottabad
HW
30-11--1 30-11--1 - 30-11--1 - 0.413 0 0 0 0 0 0 0.413 - -
May - 2021
Approved.
No Image
i) Government versus Arshad Mehmood & Oth
1756
(OG)
170173-Provision for Liabilities of Land Compensation
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 148.138 0 74.579 74.579 74.579 74.579 74.579 73.559 50% 50%
May - 2021
Approved. Demand balance allocation.
No Image
Land Compensation of "Approach road from NCC road
1756
(OG)
170173-Provision for Liabilities of Land Compensation
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 42.419 0 1.571 1.571 1.571 1.262 1.262 40.848 4% 3%
May - 2021
Payment to made to the owner as per Court Order
No Image
1756
(OG)
170173-Provision for Liabilities of Land Compensation
Provincial
30-11--1 30-11--1 - 30-11--1 - 496.839 422.26 74.579 74.579 74.579 0 422.26 0 - -
May - 2021
Completion : June-2021.
No Image
1756
(OG)
170173-Provision for Liabilities of Land Compensation
PS
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
Contractor liabilities
No Image
1757
(OG)
170521-F/S & Dualization of Mardan-Swabi Road (ADB Assisted)
Provincial
PRIP
30-11--1 30-11--1 - 30-11--1 - 1337 12.5 220 220 220 65.287 77.787 1104.5 17% 6%
May - 2021
Work in progress.
No Image
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Abbottabad
HW
30-11--1 30-11--1 - 30-11--1 - 47.75 16.807 7 7 7 7 23.807 23.943 50% 50%
May - 2021
Work started (2 units).
No Image
1) Construcation of Bridgw Tandian U/C Beerangali
2 PCC link tora at kharaki, daana darban, totan to mundrian, danna noral primary school to onward tehari danna langril...
3 Bakot Khan Kalan to Langa Loot 1.50 KM
4 Rehab: of Riyal road
 
 
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 50.95 0 0.5 0.5 0.5 0.5 0.5 50.45 1% 1%
May - 2021
Bridge- Piles completed. Demand Rs. 20 M
No Image
Main Kacha road to village Bazida Kokal Khel Bharat Bannu
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 50 0 2 2 2 2 2 48 4% 4%
May - 2021
Demand Rs. 30 M?.. 5 units , Earth work completed.. Demand Rs. 20 M
No Image
1 Gnatar Road (1 KM)
2 Gangwal Road (1 KM)
3 Bateela Road (1 KM)
4 Pashto Road (1 KM)
5 Jambera Road (1 KM)
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Charsadda
HW
30-11--1 30-11--1 - 30-11--1 - 56.54 0 3 3 3 3 3 53.54 5% 5%
May - 2021
Work in Progress Deamnd Rs. 20 M
No Image
A. i. Rehab:/Imp: of road Pir Qilla Michani Road to Main Killi.?. Rs: 6.548 M
B.
1. Const: of PCC road at U/C Hasanzai? Rs: 10.010 M
2. Const: of PCC road at U/C Matta ? Rs: 9.897 M
3. Const: of PCC road at U/C MC-I Shabqadar ? Rs: 5.003  M
4. Const: of PCC road at U/C Rahakai ? Rs: 5.050 M
5. Const: of PCC road at U/C Katozai ? Rs: 10.00 M
6. Const: of PCC road at U/C Panjpao? Rs: 10.002 M
 
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 85.673 0 4.896 4.896 4.896 4.896 4.896 80.777 6% 6%
May - 2021
(14 Units) 08- Units completed 06- units in progress TS Pending
No Image
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 50 0 8 8 8 8 8 42 16% 16%
May - 2021
Procurement completed 09 Units 04 Units in progress Earth work, structure work completed. Demand Rs. 20 M
No Image
1 Kargha ROad
2 Chenargay Road
3 Bandgari Road
4 Wahdat Road
5 Srogal Road
6 Balo Khan Road
7 Lawanda Road
8 Bokrai Road
9 Manai Sukai Road
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 50 0 0.5 0.5 0.5 0.5 0.5 49.5 1% 1%
May - 2021
Work order issue. Demand Rs. 20 M
No Image
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Hangu
30-11--1 30-11--1 - 30-11--1 - 50 0 21.805 21.805 21.805 10.44 10.44 28.195 44% 21%
May - 2021
Work order issued. Layout given.
No Image
1. Const: of road and rain Petao Khel Remaining Porotion Kahi 1.21 KM
2. Const: of B/T Road Shahowam to Khano Talab 0.731 KM UC Raisan
3. Const: of PCC Road Hangu Lal Muhammad Khawaja 0.975 KM U/C M. Khawaja
4. Rehab: of Sukari Road form Samana Road to FC Check Post (Balance portion) 0.640 KM U/C Gunjana Killi
5. Rehab; & Const: of Bakaro Banda Road Kahi 0.304 KM U/C Kahi
6. Const: of Link B/T road to GGHS Warsta from  Samana Road to Warasta Road 0.121 KM U/C Gunjana Killi
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Haripur
HW
30-11--1 30-11--1 - 30-11--1 - 421 0 79 79 79 73 73 342 19% 17%
May - 2021
Work in progress.
No Image
Roads in PK-42 Ghazi District Haripur
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Karak
30-11--1 30-11--1 - 30-11--1 - 12.74 0 2 2 2 1.4 1.4 10.74 16% 11%
May - 2021
Work in progress. Demand Rs. 2.5 M for completion
No Image
Construction of Ghundi Killi Ahmad Abad road (rema
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Kohistan
30-11--1 30-11--1 - 30-11--1 - 90 0 20.969 20.969 20.969 16.86 0 0
May - 2021
Completed. 1.5 Km shingle road in progress. And work order issued for remaing unit work started. Deamnd Rs. 25 M
No Image
1 Zaid Kher Road form Daingozia to Ashanabair 2 KM
2 Zaid Kher Road form Daingozia to Ashanabair (Balance work)
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Malakand
30-11--1 30-11--1 - 30-11--1 - 30 0 13.5 13.5 13.5 6 6 16.5 45% 20%
May - 2021
03- Units - Work in progress.
No Image
1 Cont: Widening & Rehab: of road at Ghareeb Abad U/C Upper Batkhela (1 KM)
2 Cont: Widening & Rehab: of road at Sangeena U/C Upper Batkhela (1 KM)
3 Cont: Widening & Rehab: of road at Fazal Abad U/C Allahdhand (0.6 KM)
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Mansehra
HW
30-11--1 30-11--1 - 30-11--1 - 51.25 0 3.5 3.5 3.5 3.5 3.5 47.75 7% 7%
May - 2021
11 - Units 1- Unit completed. 5- Units Earth work in progress. 1 Structure Work in Progress, Road Work in Progress. 2 "E/Work Completed. Structure Work in Progess." 3 E/Work Completed & Structrue Work in Progress. 4 Work Not Yet Started. Road & Structure work in Progress. 5 Road & Structure work in Progress. 6 "Earth Work Completed. Road Work in Progress." 7 Completed. 8 Work in Progress. 9 Work Order Issued 10 Work Order Issued 11 Work Order Issued 11 Tender floated on 18/03/2021 Liability : 20 M
No Image
1) Shoukat Abad to Tatar raod (1.5 Km).?.?..   TS 4.755
2 PCC road Nullah Chinarkot.?.?... TS 2.791
3 Shahkot Bala
4 Karmatee
5 Boz Bela.?.?. TS 2.432
6 Bawar Khan
7 Belian to Trawara
8 Qazi Abad (Battai).?? TS 4.950
9 PCC Link road Buttle
10 PCC link Mahandri
11 PCC link road Garhi Habibullah
 
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 83.78 25.208 36.5 36.5 36.5 36.5 61.708 22.072 74% 74%
May - 2021
5 units - Structure work in progress.
No Image
  1.  Construction/rehabilitation of Umbar Abad to Diyar abad 0.500 KM
  2. Rehab: & ImpL of Sangi Marmar toBakhshali road1.5 KM
  3. Const: & BT of road Baram Laar to GPS UC Bala Garhi 0.400 KM
  4. Imp; of Road form Kagan road remaining portion 0.65 KM
  5. Const: & BT of Chamrang to Dhero Baba Janazgah 0.600 KM
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 321.11 40.78389 29 29 29 29 69.78389 251.326 22% 22%
May - 2021
12 units - SST Road- Earth work in progress.
No Image
  1. Kandao Killi road & form Cherat Cement Factory to Spin Kani
  2. Road in UC Jalozai 3 KM
  3.  road in UC Mughalkai
  4. Road & Pave: of stret in UC Misri Banda
  5. Road & Pave: of stret in UC Zara Maina
  6. Road & Pave: of street in UC Risalpur & Village Kandar & Sees Mandi
  7. SST Road (Misri Banda)
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 50 0 0.5 0.5 0.5 0.5 0.5 49.5 1% 1%
May - 2021
5 units- Work In progress. Demand Rs. 20 M Liability Rs: 10 M
No Image
Const: of road at Ucs Mahal Teria-2, Khalisa-2, Hassan Ghari-1 & 2, & Shahi Bagh Peshawar...
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Provincial
30-11--1 30-11--1 - 30-11--1 - 2581.105 598.58 60 80 60 0 598.58 0 - -
May - 2021
Work started.
No Image
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Swabi
HW
30-11--1 30-11--1 - 30-11--1 - 165.39 0 5 5 5 5 5 160.39 3% 3%
May - 2021
09- Units Work in progress. Demand RS. 35 M
No Image
1) Sogandai road (1 Km)
2) Gul abad .?.. TS (8.079)
3 Ismail Abad Kut Kani Road
4 Kalabat Road .?.. TS (15.845)
5 Kotha BHU Janzgha  .?.. TS (10.779)
 
 B.  (Pk-47)
 i. Tarakai Dojangai Road U/C Tarakai (01 Km)
 ii- Qadamay Shaheeda Tarakai Road U/C Tarakai (01-km)   .?.?.?. TS (11.981)
iii. Permoli Road U/C Permoli (02 km)
 iv. Constn: and B/T of  Kalu Khan Road U/C Kalu Khan (02 Km)
1758
(OG)
170585-Construction/ Widening / Rehabilitation / Dualization of C&W Roads in Khyber Pakhtunkhwa
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 715.12 0 314 314 314 195.505 195.505 401.12 44% 27%
May - 2021
38 - Units Earth work, Sub Base & Structure work in progress on all units. Demand Rs: 50.00 M
No Image
1) Qalagay Guldheri road (1 Km) and Surey Julaitot
1759
(OG)
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa
Abbottabad
HW
30-11--1 30-11--1 - 30-11--1 - 89.81 11.41 3.279 3.279 3.279 3.279 14.689 75.121 16% 16%
May - 2021
Work in progress Demand Rs. 5 M
No Image
1 Kaseel Batoini via Sareela 3 KM
2 Makool Danan to Kagian Danna road, Tatreela road, Kholianroad and BT of Chanmari Tajwal road
3 Barbeen (Boi) AJK (Gotha Suspension Bridge) link road 0.5 KM
1759
(OG)
170587-Upgradation & Strengthening of C&W Roads in Khyber Pakhtunkhwa
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 18.609 38.2 12 12 12 12 50.2 0 100% 100%
May - 2021
Work started. Demand Rs. 30 M
No Image
  1. Marwat Canal to Ghazi House PK-72 Bannu 0.5 KM
  2. Nizam Bazar to Kotki Saadat Intikhab Ali Shah Korona 1.5 KM
  3. Goraka Nar Dilasa Shah Bannu 1 KM
  4. Marwat Cananl to Ghazi Kalal Bakak Khel 1.5 KM
  5.  
i.   Kotka Ibrahim Khel via Samanda Kala 1.4 KM
ii.  Kotka Purana Shikhan via Sarwarngi Aada 1.4 KM
iii. Samdri road
iv. Kotka Musa Khan Yark Khel Mandan road 0.33 KM
Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69