Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1488 (OG) |
170576-Improvement / Widening / Rehabilitation of road from main Hangu thall road ( Mamoo Banda to Dallan Gurguri Road (22 Km), District Hangu |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.715 | 18.725 | 100 | 80.695 | 80.695 | 48.086 | 66.811 | 280.99 | 30% |
17% May - 2021 |
5 km- 3/5 km E. Work completed & structure Work In progress. |
No Image |
1. 05 KM Package-I
2. 07 KM Package-II
| |||||||||||||||||||
1489 (OG) |
170578-F/S, Design & Construction of / Improvement of Hangu Samana Main Road (7 K m) District Hangu (Phase-II) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 184.122 | 41.078 | 10 | 10 | 10 | 10 | 51.078 | 133.044 | 28% |
28% May - 2021 |
Length 7 km - Earth work, structure 85 % in progress.
Demand Rs. 150 M |
No Image |
Hangu | |||||||||||||||||||
1490 (OG) |
140628-Rehabilitation of Road from Chamkani to PAF Camp Badaber District Peshawar |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 195.07 | 108.877 | 50 | 50 | 50 | 43.729 | 152.606 | 36.193 | 81% |
78% May - 2021 |
Length 9 Km - 8.6 Km asphaltic base/wearing course in progress.
P-II : Balance funds.
Demand - Rs 35 M. |
No Image |
Peshawar | |||||||||||||||||||
1491 (OG) |
140949-F/S, Design and Construction/ Improvement of 15 Km Roads in, District Peshawar. |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 149.149 | 143.975 | 13.339 | 1.767 | 1.767 | 1.767 | 145.742 | 0 | 100% |
98% May - 2021 |
Length 15 Km - Physcially & Financially Completed. |
No Image |
1) Afghan Colony and Sardar Ahmad Jan Colony
2) Afrid Garhi
3) Chandni Chowk
4) Din Behar Colony
5) Ghani Colony
6) Kachkol Abad road with 5 Nos link road
7) Liaqat Abad and Larma BW road
8) Dur-e-Kamal Zaryab Colony with 3 Nos link road
9) Maulana Fazal-e-Rehman Madrass rod with 3 Nos link
10) Shinwari Town with 4 Nos link | |||||||||||||||||||
1492 (OG) |
140950-F/S, Design and Dualization of 16 KM Road from Jamil Chowk (Ring Road) towards Urmar Payan Peshawar. |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1199.009 | 0 | 50 | 50 | 50 | 50 | 0 | 0 |
May - 2021 |
Length 12 Km - 10-km asphlat completed.
Pack II - 1 km Court case.
Bridge dismenalting completed
Piles in progress
Demand Rs: 50 M ( Liability ) |
No Image | |
Package-1
Package-2
Bridge-1 at RD
Bridge-2 at RD | |||||||||||||||||||
1493 (OG) |
150779-Construction/ Improvement of Hasanghari Sheri Jahngi road, Khalsa 2 and surrounding areas road Peshawar. |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 70.252 | 20 | 20 | 20 | 18.466 | 88.718 | 59.748 | 60% |
59% May - 2021 |
Length 08 Km - 5.80 Km Asphalt completed.
P-II : Balance Funds.
Demand - Rs 40 M. |
No Image |
PK-04 Peshawar | |||||||||||||||||||
1494 (OG) |
170658-Const of internal roads in, Dstrictt. Peshawar. |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 128.229 | 20 | 20 | 20 | 20 | 148.229 | 51.771 | 74% |
74% May - 2021 |
10 Units
06 Units Completed
04 units in progress
P-II : Balance Funds.
Demand - Rs 40 M. |
No Image |
1. Construction of road from Jazz Tower Imdad Mir Koroona Talatan Ghalib Khel road and link road to BHU Ghali Khel 2.30 Km
? Rs: 23.377 M
2. Construction of road from Aza Khel to Naak Band 3 Km
3. Rehabilitation of road from Nawab Chowk Khanow UC Sherkara 2.90 Km? Rs: 27.086 M
4. Construction of Sam No.1 road taking off from Zangali Canal to GPS Garhi Ghulam Muhammad 2.80 Km? Rs: 22.760 M
5. Construction of Garhi Mumtaz road taking off from Hazar Khwani Canal 2 Km
6. Rehabilitation/construction of Kulu Daag Lara road at Badabera 2 Km
7. Improvement/rehabilitation of Ghaz Chowk to Rural Health Center Aza Khel Village 1 Km? Rs: 9.833 M
8. Construction of road from Banat Kalay to Major House Mair Surizai 1.20 Km
9. Improvement/Rehab: of road form warsak cannal to inizai Moshokhel PK-71
10. Imp:/Rehab: of sherkera road PK-71 | |||||||||||||||||||
1495 (OG) |
190131-Dualization of Dalazak Road (05 Km) from Ring Road chowk towards Grid Station, Peshawar |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 519.448 | 0 | 50 | 67 | 67 | 66.772 | 66.772 | 469.448 | 10% |
13% May - 2021 |
1.8 KM sub base in progress and WBM 800 M & S/work 1200 M completed
Demand Rs: 100 M to clear the contrctor laibility & tempo of work |
No Image |
Dalazak Road Peshawar | |||||||||||||||||||
1496 (OG) |
190247-Construction of a) Internal road (Jhagra) 7-Km, b) GM Bridge-512 (60 m span), District Peshawar |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 52.176 | 50 | 33 | 33 | 28.751 | 80.927 | 47.824 | 68% |
54% May - 2021 |
04 Packages
03 Packages Road work Completed
04 Package Bridge |
No Image |
Package-1? Rs: 41.063 M
1. Constn:/Rehab: of Road Haroon Enterprieses to CanalPeshawar.
2. Constn:/Rehab: of Road Rethra to Dawa Khulay Peshawar
3. Constn:/Rehab: of Road from Malago School to Jogo School Peshawar.
Package-II ? Rs: 33.614 M ? (TS 27.261)
4. Constn:/Rehab: of Road from Resheda Chowk Jhagra to Canal Peshawar.
5. Constn:/Rehab: of Road from Gahreeb Abad toMalago Road via Secretary Ghari.
Package-III? Rs: 31.377 M
6. Constn:/Rehab: of Road Masoom Abad road & Kandi Hayat road Jhagra.
7. Constn:/Rehab: of Road Kandi Hayat to Nasirpur Peshawar.
8. Constn:/Rehab: of Road Ghufran Abad Peshawar.
Bridge Structure ? Rs: 44.10 M
9. Bridge (30 meter Span @ 1.1 Milion per /M
10. Development work, retaining wall, approaches including Asphalt andother related works wing wall required for structure
stability. | |||||||||||||||||||
1497 (OG) |
190340-Construction of roads in, District Peshawar |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 5 | 20 | 84.311 | 84.311 | 84.311 | 89.311 | 175 | 13% |
45% May - 2021 |
6 packages - Work in progress on all packages
6 Units Packages submitted to SE.
Liability Rs. 100 M
Demand Rs. 150 M |
No Image |
Package-I? Rs: 35.23 M
1. Shagai Bazar to Khawar
2. Sawar House to Khawar
3. Gul Abad Gujar Dand Road i/c Amrud Bagh Road
4. Gulzali Stop to Baghacha Koroona
Package-II? Rs: 30.77 M
1. Faqir Baba to Sufaid Sung
2. Sher Makhy Road u/c Shahi Bala
Package-III? Rs: 31.81 M
1. Ghamm Khadi Road U/C Shahi Bala & Mathra
2. Kamali Ghari Road U/C Mathra
Package-IV? Rs: 33.51 M
1. Shagi Noor Janazga u/c Bakhmal Ghari
2. Masjid Malakan to Qasim House
3. Ghari Fazal Haq Road U/C Mathra
Package-V? Rs: 33.66 M
1. Ghalji Kander Khel to Yari Koroona
2. Muslim Abad Near Swat Scuot U/C Panam Dheri
3. Hujra Zafar Khan to Sher Dil Qilla
4. Hameed Ullah House to Khawja House
Package-VI? Rs: 34.92 M
1. Wazir Kalla Bridge to Shahgi Bala Road
2. Michni Camp road U/C Bela Momandan
3. Warsak Main road to Main kel u/c Ghari Sher Dad
4. Khat Kally road boundary U/c Charghar Matti
5. Angoor Koroona U/C Jugani | |||||||||||||||||||
1498 (OG) |
190592-Rehabilitation/Const. of Roads/Internal roads at UCs Haryana, Gulbela, Takhtabad, khazana, kankola, Pakha Ghulam, nahaqi, & adjoining areas including bridge, and Const of street Malik Saad Colony, Duranpur, Ring road, Peshawar. |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 220 | 5 | 50 | 79 | 79 | 74.662 | 79.662 | 165 | 25% |
36% May - 2021 |
Work on 5 packages in Progress.
4 Units - TS Submitted to SE |
No Image |
Package-I.?.. Rs: 46.215 M
1. Haryana road to Riaz Ghari
2. Nasapa to Bypass Road
3. Saiwan Road at Harayana
4. Ghari Karim Dad Road
Package-II.?.. Rs: 42.443 M
1. Mewra Road
2. Muhammadzai Road
3. Ghari Hamza Road
Package-III.?.. Rs: 43.185 M
1. Kareri Road
2. Dagi Mualhan & Shah Alam
3. Kochain Road
4. Jatti Payan Road
5. Jumma Gul Koroona Road
6. Babuzai Road
Package-IV.?.. Rs: 41.709 M
1. Link road touching Budhai to Khandi Kalo Khel
2. Rano Ghari to Darual Iman ROad
3. Chaghal pura road
4. Service road to Samar Bagh Road
5. Touda to Daman Hindki Road
Package-V.?.. Rs: 46.195 M
1. Malik Saad Colony Road
2. Daman Aghan Road form Janazgah to Graveyard along R/Wall
3. Gulbela Road
4. Muslim Abad Sheikhano Kalay | |||||||||||||||||||
1499 (OG) |
140889-F/S, Construction & BT of Rroad i/c Bridge from Pir Qala to Major Qala and Shabqadar Bazar to Kangra, Charsadda (14 Km) |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 401.195 | 348.045 | 10 | 10 | 10 | 10 | 358.045 | 43.15 | 89% |
89% May - 2021 |
10 Km - 9 Km completed. Remaining in progress.
P-II : Rs. 43.149 M |
No Image |
1. Kangra Road (6 Km) width 12 ft
2. Byapss road from Pir Kally to Major Kally (Length - 6 Km width 18 ft ) | |||||||||||||||||||
1500 (OG) |
140890-F/S, Design, Reconst: & Reh: of Roads a) Alladad Khel-Village Kani b) Ziam Rest House-Salgaray via Gud Killi Chowk c) Village Cheena-Dildar Ghari (12 Km), 2) Main Tangi Rd Rehmat Killi-Sarfaraz Killi Shakh No. 03, 3) Charai rd-Gujar Killi....Chars |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 250 | 162.265 | 87.735 | 70.906 | 70.906 | 64.046 | 226.311 | 0 | 100% |
91% May - 2021 |
12 Km length - Finishing in progress
Completion June-2021. |
No Image |
1) Allah Dad Khel to village Kani Tehil Shabqadar (Length- 2.5 width 12ft )
2) Ziam Rest House to Salgaray via Gud Killi Chowk Shams Abad (length 2.5 km Width 12 ft )
3) Village Cheena to Dildar Garhi Charsadda (length 7 km Width 18 ft )
New Scope :
(2) Construction & rehabilitation of road from Main Shakoor Madhand road to Lalma Islamabad and link road to Muslim Abad Shakoor? Rs: 28.893 M
(3) construction and rehabilitation of Main road from Yar Jan Killi Sewan Chowk to Khanjari? Rs: 19.612 M
(4) Reconstruction and rehabilitation of road from Main Shodag Shakoor road to Mulagori and link road in UC Shodag? Rs: 40.682 M
(5) construction and rehabilitation of road in Harichand? Rs: 13.554 M
(6) construction and rehabilitation of road from Sherpao Chowk to Jindi via Durrankheil i/c link roads 1.40 Km.? Rs: 14.673 M | |||||||||||||||||||
1501 (OG) |
150820-Construction of road from Harichand to Hayat Khan Banda and Bashir Khan Banda to Said Imran Kalay and Shakoor to Pumbaoosha via Kirmu, Charsadda |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 230.917 | 227.445 | 20 | 2.9 | 2.9 | 1.884 | 229.329 | 0 | 100% |
99% May - 2021 |
Completed |
No Image |
A i. Hari Chand to Hayat Khan Banda ( length 3 km ) (width 12 ft )
ii. Bashir Khan Banda to Said Imran Kallay (length 2 km ) 9 !2 ft wide )
iii. Shahkur to Bumboo Shaha ( Length 2km ) ( width 12 ft )
B.
1. Const: & B/T of road Amir Abad Tordher i/c Yar Gul Killy? Rs: 45.171 M
2. Const: & B/T of road from Pumboo Shah to Shakoor and Pumbo Shah to Karimu ? Rs: 10.081 M
3. Const: & B/T of road from Zyam Tkht Bai road to Khalil Killy 700m ? Rs: 6.292 M
4. Const: & B/T of road from from Chail to Taj Muhammd Killy U/C Shodag ? Rs: 10.001 M
5. Const: & B/T of road from Zyam to Firdous Abad ? Rs: 4.244 M
6. Const: & B/T of road from Bacha Pul to Shewa Adda via Police Station Tangi? Rs: 12.867 M
7. Const: & B/T of road from Mandani to Hisra Faqir Gul Killy? Rs: 38.704 M
8. Const: & B/T of road from Dado Killy Road to Qadeem Killy Akhtar Rehman Killy? Rs: 2.807 M
9. Const: & B/T of road from Sokana Road to Tangi To Qadar Khan Killy ? Rs: 3.348 M
10. Const: & B/T of road from at U/C Kuz Behra Dheri ? Rs: 14.175 M
11. Const: & B/T of road from Gandheri Chowk to Kas Koroona ? Rs: 7.779 M | |||||||||||||||||||
1502 (OG) |
150825-Construction and BT of roads a) Shabqadar Chowk to Matta road i/c bridge, b) Hajizai to Yaghi Band via Tarkha & Masal Qila to road via Mian Essa and Various Roads in UC Mirzai and Panjpao, District Charsadda. |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 350 | 261.347 | 20 | 20 | 20 | 20 | 281.347 | 68.653 | 80% |
80% May - 2021 |
Length 7.125 Km - 6.8 Km asphalt completed.
P-II : Rs: 30 M |
No Image |
1. Shabqadar Chowk to Mtta ( L 7m ) (W-24 ft )? Rs. 174.735 M
2. Mirzai to Nusarat Zai ( L- 3 km ) ( w- 12 ft )? Rs. 38.453 M
3. Haji Zai to Tarkha (2.5 km ) (12 ft ) ? Rs. 35.152 M
4. Haji Zai to Gundha ( 6.5 km ) ( 12 ft )? Rs. 75.270 M
5. Shab qaadr Matt aroad to Khair aabd ( 1.5 km ) ( 12 ft ) ? Rs. 17.690 M
| |||||||||||||||||||
1503 (OG) |
150948-Reconstruction & Rehabilitation of roads from Haryana to Hajizai, Nazimabad to Gujar Kali, and roads in Ucs Sherpao, Ziam, Abazai, Mirzadher of District Charsadda. |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 163 | 80.25101 | 40 | 50 | 50 | 50 | 130.25101 | 42.749 | 74% |
80% May - 2021 |
13.45 km
Asphalt completed- 4km
In progress = 4.7 Km
NYS 4.75 Km
Demand Rs. 6 m for BT only |
No Image |
A. i. Haryana to Hajizai.?.?.?.??Rs: 45.164 M
ii. Nazimabad to Gujar Kali
B.
1. Tangi Mirza Dher Road to Sangar Killy U/C Mirza Dher? Rs: 17.463 M
2. Tangi Road to Mamano Pull via Masal Koroona? Rs: 25.376 M
3. Janokai Road at Gharib Abad to Barlan? Rs: 15.604 M
4. Haya Gul Mian Killy to Lora Sha? Rs: 19.283 M
5. Lowe Swat Kanal to Farid Khan Killy via Marguz? Rs: 10.381 M
6. Tangi Charsadda Rod to Sharo Main Saib? Rs: 16.529 M | |||||||||||||||||||
1504 (OG) |
150954-Construction and BT of road a) Peshawar road to Kodai UC Agra b) Koachaki to Ajon Kallay via Hassanabad Kandaro Kally UC Shodag, Charsadda |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 325 | 153.751 | 50 | 50 | 50 | 50 | 203.751 | 121.249 | 63% |
63% May - 2021 |
8.5 Km (original scope) - 8.5 Km asphalt completed.
Demand Rs; 100 M |
No Image |
A. i. Peshwar Road to Kodai U/C Agra? Rs: 28.250 M
ii. Kochaki to Ajon Kallay via Hassanabad Kandaro Killi & Other Roads
B.
1. Rehab:/Const: & B/T of Road at U/C Agra? Rs: 13.637 M
2. Rehab:/Const: of Road at U/C Hisara Yaseenzai ? Rs: 45.006 M
3. Rehab:/Const: of Road at U/C Tarnab? Rs: 35.00 M
4. Rehab:/Const: of Road from Shah Dand Chowk to Thikadar Killy ? Rs: 12.785 M
5. Rehab:/Const: of Baika to Hameed Main Dheri at U/C Turangzai Charsadda ? Rs: 4.277 M
6. Rehab:/Const: of Nishan Abad Road at U/C Umarzai Charsdda ? Rs: 10.897 M
7. Rehab:/Const: of Road from Charasdda Tangi Road to Marchaki i/C Link Road ? Rs: 35.503 M
8. Rehab:/Const: of Road from Shah Dhand to Qilla Koroona ? Rs: 8.477 M
9. Rehab:/Const: of Road from Dargai Bye Pass Road alongwith the Drain to Dargari village? Rs: 9.101 M
10. Rehab:/Const: of Road from Charsadda Tangi road to Sonehri Masjid Rajjar Bazaar to Sheikh Abad? Rs: 8.216 M
| |||||||||||||||||||
1505 (OG) |
150980-Construction of Sarwar Abad Umarzai Road and Road from Shakh No.4 to Shakh No. 5 via Zarbab Ghari Maira Umarzai and roads in Ucs Tarnab, Hisara Yasinzai, Turnagzai, Serki Tetara, Agra Doulat Pura Kangra Mera Umerzai and Chendro Dag, District Charsa |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 188.669 | 109.357 | 40 | 40 | 40 | 40 | 149.357 | 39.312 | 79% |
79% May - 2021 |
Total road 14.6 Km
Completed 7.7 km.
In progress 6.9 Km
TS sanctioned
P-II ; 39.312 M |
No Image |
District Charsadda | |||||||||||||||||||
1506 (OG) |
160629-F/S, Design and Construction of Link road from Shabqadar Naguman (PKHA) to Shabqadar Battagram road (PKHA) via Attakai, District Charsadda |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 511.583 | 110.916 | 50 | 50 | 50 | 37.795 | 148.711 | 350.667 | 31% |
29% May - 2021 |
Length 2.4 Km (width 24 ft) - work in progress. |
No Image |
Charsadda | |||||||||||||||||||
1507 (OG) |
170580-Construction of roads in a) 205 Km road from Mill Pump Nowshera to Sattibad UC Mera Pang,b) 2 Km road from Nowshera to Karoona UC Dheri Zardad, c) 2.5 Km road from Prang Majokay to faqir abad Majokay MC-II, District Charsadda |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 105.593 | 46.847 | 50 | 50 | 50 | 17.914 | 64.761 | 8.746 | 92% |
61% May - 2021 |
3 units -
Total road Length 7.5 Km - width 24 ft.
Complete = 2 Km
In progress- 05 Km. |
No Image |
1. 20.5 Km road from Mill Pump Nowshera to Sattibad UC Mera Pang? Rs: 39.647 M
2. 2 Km road from Nowshera to Karoona UC Dheri Zardad, ? Rs: 31.943 M
3. 2.5 Km road from Prang Majokay to faqir abad Majokay MC-II,? Rs: 33.901 M | |||||||||||||||||||
1508 (OG) |
170659-Consruction, Rehabilitation, Black Topping of Roads / PCC Roads Drain Culverts Retaining wall, Ucs Sherpao, Ziam, Abazai, Katozai, Battagram, Kangra, Daulat Pura, Hassanzai, Mirza Dher, Tangi, Mandani, Nisatta, District Charsadda. |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 300 | 64.5 | 20 | 20 | 20 | 20 | 84.5 | 215.5 | 28% |
28% May - 2021 |
19 units- 10 km ready for Asphalt. Work in progress.
Demand RS; 50 M |
No Image |
1) UC Abazai? Rs:15.488 M
2) UC Battagram? Rs; 39.210
3) UC Kangra and UC Daulat Pura? Rs: 77.250 M
4) UC Hassanzai and UC Katozai.?. Rs: 27.550 M
5) UC Mandani.?. Rs: 19.696 M
6) UC Nisatta.?. Rs: 34.393 M
7) UC Sherpao.?. Rs: 11.304 M
8) UC Tangi.?. Rs: 19.696 M
9) UC Ziam.?. Rs: 12.00 M | |||||||||||||||||||
1509 (OG) |
190486-Imrovement and widening and BT of road from Tangi Bucha bridge to Serai via Ghandheri and Zegai to Bucha Khan Kili, from Cheena to Sherpao via Ghazo dheri i/c link road to Tootakai Tehsil Tangi Distt Charsadda. |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 499.62 | 8.62 | 50 | 95.829 | 95.829 | 95.829 | 104.449 | 441 | 12% |
21% May - 2021 |
Work in progress
Demand Rs: 50 M |
No Image |
A. 1. Road from Tangi Bucha Bridge to Serai via Ghandheri? Rs: 170.123 M
B.
1. Zagari to Bucha Khan Killi road.?. Rs: 19.954 M
2. From Cheena to Sherparo via Ghazo Dheri i/C link road to tootakai.?. Rs: 59.806 M | |||||||||||||||||||
1510 (OG) |
190488-Construction of roads in Ucs MC1,2,3,4, Mera prang, Doolat pura, Agra, Hisara yaseenzai, Tarnao, Kangra and Battagram District Charsadda. |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 14.999 | 59.222 | 59.222 | 59.222 | 59.222 | 74.221 | 125.779 | 37% |
37% May - 2021 |
07- Units (Length 17Kms)
Structure work in progress.
Demand Rs: 50 M |
No Image |
1. Const:/Rehab: of road from Kot to Tarnao via Shah Kulali Tarnao? Rs: 57.568 M
2. Const:/Rehab: of road doem Main Road to Musazai U/C Batagram? Rs: 12.988 M
3. Const:/Rehab: of road from Qazi Khel Bridge to Hisara Yasinzai U/C Hisara Yasinzai? Rs: 22.489 M
4. Const:/Rehab: of road from Peshawar road to Mira Khel U/C Agra? Rs: 30.310 M
5. Const:/Rehab: of road from Kheskhi koroona to Tarkha Faqirabad U/C Hisara Yasinzai? Rs: 23.245 M
6. Const:/Rehab: of road from Daulat Pura Kandi Sheikhan to Twani Muqbarar? Rs: 18.377 M
7. Const:/Rehab: of road from Peshawar road Sardayab to Agra u/C Agra? Rs: 34.929 M
| |||||||||||||||||||
1511 (OG) |
190536-Construction and BT of road from Mardan road to Gujarano kalay via road to mir Ahmad Kallay, sheikh Abad to sher khan kallay, karwan road, soor mill Raheema road to Landay shah, Dosehra road to Nazoo kallay Pakistan kallay Dehri zardad District Cha |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 7.5 | 15 | 15 | 15 | 15 | 22.5 | 127.5 | 15% |
15% May - 2021 |
04- Units
Work in progress
Demand Rs: 30 M |
No Image |
1. Const: & B/T of road form Mardan road to Gujarano Kallay via road to Mir Ahmad Kallay? Rs: 55.912 M
2. Const: & B/T of road form Sheikh Abad to Sher Khan Kallay Karwan Road ? Rs: 7.954 M
3. Const: & B/T of road form Soor Mill Raheema road to Londary Shah? Rs: 5.792 M
4. Const: & B/T of road form Dosehra road to Nazoo Kallay Pakistan Kally Dheri Zardad? Rs: 80.240 M | |||||||||||||||||||
1512 (OG) |
190537-Const: & BT of road from Koladher ghani khan rd-Sarfaraz klay, Palosa chk-via malang abad-dosera chk, Dosera Chk-Spin Kane via Sheikhano Klay, Sardheri station-palosa chk via abas klay shekho, Shah pasand kalay-Londa kalay Nisata, Charsadda |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 9.2 | 15 | 15 | 15 | 15 | 24.2 | 125.8 | 16% |
16% May - 2021 |
05- Units
S/B, WBM, E/W & S/Work in progress |
No Image |
1. Const: & B/T of road form Kuladher Ghani Khan road sarfaraz Kalay ? Rs: 7.880 M
2. Const: & B/T of road form Palosai Chowk via Malang Abad Dosehra Chowk ? Rs: 75.800 M
3. Const: & B/T of road from Spin Kanre Via Shiekhano Kalay ? Rs: 23.430 M
4. Const: & B/T of road from Sardheri Station Palosa Chowk via Abbas Kallay Sheikhano ? Rs: 22.130 M
5. Const: & B/T of road from Shah Pasand Kallay Londa Kalay Nisatta Charsadda ? Rs: 20.660 M | |||||||||||||||||||
1513 (OG) |
190553-Improvement and Rehabilitation of Road from Ghani Khan road to Serki Bazar via Marwandi (4.5 KM), Charsadda. |
Charsadda HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 54.156 | 0 | 40 | 40 | 40 | 32.677 | 0 | 0 |
May - 2021 |
Work in progress. Dsipute resolved |
No Image | |
1514 (OG) |
140672-F/S, Design and Contruction of Bridge at Kabul River connecting Mohib Banda/Pashtun Garhi on Right Bank and Kheshgi on Left Bank, District Nowshera. i/c Constn of bypass road from main GT road to Pashtun Garhi Bridge (03-Km). |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 680.592 | 539.674 | 25 | 25 | 25 | 21.771 | 561.445 | 115.918 | 83% |
82% May - 2021 |
Package- I Bridge completed,(15-Nos Spain. Each spain 30-meter.
Pac-II : road 2.40 Km in progress |
No Image |
Nowshera
Pac-I Bridge
Pac-II Road 2.40 KM | |||||||||||||||||||
1515 (OG) |
140935-F/S, Design, Impr&Wid of Roads a)Akora Ktk-Guldheri,Manai,Duran,Tarkhel,b)ShahabKhel-Guldheri,c)Pitao-Dam,d)KakaSahib-KhwarMiangan,e)K.S-BaghGali,f)Khwar-Pitao,g)Pitao-Sawarkhel,h)K.S-Abkhel Wali,i)Walai MR-S.K via Khwar,j)K.S-KiliKandao, Nowshera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1009.995 | 896.606 | 50 | 50 | 50 | 50 | 946.606 | 63.389 | 94% |
94% May - 2021 |
Original scope - 27 Km completed.
04- Packages
Pac-1 completed.
Remaining scope in progress
Demand Rs: 25 M |
No Image |
Nowshera | |||||||||||||||||||
1516 (OG) |
140936-F/S, Design and BT of Internal roads Pirpiai - Azakhel Bala - Payan - Dagai - Banda Nabi, Badrashi, Nowshera. SH: Const of internal road in UCs Dagai-Banda Nabi, Pirpiai, Badrashi, Azakhel Bala & Payan, District Nowshera (Phase-II) |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1050 | 738.221 | 30 | 48.33 | 48.33 | 48.33 | 786.551 | 281.779 | 73% |
75% May - 2021 |
Original scope + Package-I & II completed.
3rd-4th revised Scope in Progress.
Demand Rs: 30 M |
No Image |
Nowshera | |||||||||||||||||||
1517 (OG) |
140938-F/S, Design & Improvement/BT of Internal 16 Km Road at Kheshgi Bala and Payan, Nowshera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 849.997 | 656.2 | 50 | 54.854 | 54.854 | 54.854 | 711.054 | 143.797 | 83% |
84% May - 2021 |
Original scope completed (16 Km).
1st Revised scope in progress.
Demand Rs: 30 M |
No Image |
Nowshera | |||||||||||||||||||
1518 (OG) |
140939-F/S & Construction of a) Bakhtai-Kottli Khurd-Kottli Kalan road i/c Bridges b) road from Cherat road to Spinkhak Village, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 400 | 292.001 | 30 | 18 | 18 | 18 | 310.001 | 77.999 | 81% |
78% May - 2021 |
Length 6.7 Km - completed (original scope).
Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
1519 (OG) |
140940-F/S, Design & Construction of RCC Bridge on Kabul River at Kashti Pul, Nowshera Cantt|: |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 369.986 | 350.098 | 30 | 130 | 130 | 94.604 | 444.702 | 0 | 100% |
100% May - 2021 |
80% Completed |
No Image |
Nowshera | |||||||||||||||||||
1520 (OG) |
140992-F/S, Design and Rehabilitation / Widening of Road from GT Road to Khushal Khan Khattak Mazar Akora Khattak, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 124.99 | 184.694 | 28.556 | 28.556 | 28.556 | 13.346 | 198.04 | 0 | 100% |
100% May - 2021 |
Complted . Deleet from Draft adp |
No Image |
Package I 8.3 KM
Package II 4 KM | |||||||||||||||||||
1521 (OG) |
141019-F/S, Design & Construction / Rehabilitation of Roads a) G.T Road to Said Akbar Koroona b) Ayub Abad to Essori Bala c) Jehangira Kati Maina d) Pitao Payan to Dargai village e) G. T Road Khwar Mohallah Shen Bagh Koroona, District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 194.551 | 245.087 | 10 | 10 | 10 | 10 | 255.087 | 0 | 100% |
100% May - 2021 |
Original scope - completed (12 Km). Revised scope in progress. |
No Image |
| |||||||||||||||||||
1522 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads a) Khair Abad to Mandoo Khel Village b) Camp Koroona Yousaf Abad Akora c) Adamzai to Momond Garhi d) Jehangira Chowk to Railway Station, District Nowshera. (10 Kms) |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 284 | 264.963 | 10 | 12.17 | 12.17 | 12.17 | 277.133 | 9.037 | 97% |
98% May - 2021 |
Complted . Delete from Draft ADP |
No Image |
| |||||||||||||||||||
1523 (OG) |
150807-Construction of drain, pavement of streets and internal roads of UCs Pabbi, Khan Sher Garhi, Chowki Mumraz, Akbar Pura & Taru Distt Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 749.744 | 435.128 | 10 | 44 | 44 | 43.997 | 479.125 | 304.616 | 59% |
64% May - 2021 |
Length 23 Km - completed (original scope).
Revised in progress |
No Image |
Nowshera | |||||||||||||||||||
1524 (OG) |
150809-Const./ Pavement of roads /streets alongwith allied works in UCs Aman Kot, Mohib Banda, Pahari Katti Khel, ZKKS & Manki Sharif, Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 599.984 | 504.333 | 10 | 12.5 | 12.5 | 12.5 | 516.833 | 85.651 | 86% |
86% May - 2021 |
Length 17.5 Km - 13 Km completed.
Revised scope - in progresss |
No Image |
Nowshera | |||||||||||||||||||
1525 (OG) |
150810-Construction/ pavement of roads/streets in UC?s Kheshgi Bala,Kheshgi Payan, Aman Garh and Gandheri, Nowshera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 549.577 | 349.097 | 10 | 14 | 14 | 14 | 363.097 | 190.48 | 65% |
66% May - 2021 |
Length 15 Km - Ist approved scope completed. Revised scope in progress. |
No Image |
1) Kheshgi Payan
2) Kheshgi Bala
3) Aman Garh
4) Gandheri
5) UC Aman Garh and Gandheri
6) UC Kheshgi Payan & Bala
7) UC Kheshgi Payan
8) Kheshgi Bala UC Aman Garh UC Gandheri | |||||||||||||||||||
1526 (OG) |
150813-Const./Rehab. of roads from Inzari to Hisartang and Shaidu Khwar to Shinwari Koroona via Eidgah, District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 63.44 | 10 | 10 | 10 | 10 | 73.44 | 126.56 | 37% |
37% May - 2021 |
Length 6.2 Km -
2- Packages
Earth work, structure work in progress. |
No Image |
Nowshera | |||||||||||||||||||
1527 (OG) |
150816-Const./Rehab. of Roads in Village Kotar Pam Village Bara Banda UC Bara Banda, G.T Road to Fazal Gange and Hassan Abad Risalpur G.T Road to Mohallah Hassan Abad Rashakai, Kandar, Risalpur to Ghala Dher, UC Zara Miana, UC Pir Sabak, UC Mughalky, Nows |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700 | 379.79 | 40.219 | 31.366 | 31.366 | 31.365 | 411.155 | 279.991 | 60% |
59% May - 2021 |
Delete . Drop from ADP |
No Image |
Nowshera | |||||||||||||||||||
1528 (OG) |
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowhsera |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 700.09 | 449.89 | 30 | 45 | 45 | 45 | 494.89 | 220.2 | 69% |
71% May - 2021 |
Length 18.5 Km completed. Revised scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
1529 (OG) |
150958-Construction / Rehabilitation of Jehangira Bypass and Nizampur road to Charpani village, District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200 | 128.812 | 20 | 20 | 20 | 20 | 148.812 | 51.188 | 74% |
74% May - 2021 |
3/11 Km asphalt completed.
Jehangira bypass 1.5 Km
Charpani village road 2Km WBM, AWC in progress.
Pack-II Jehangira bypass 1.3 Km. Mali Khel bala 0.8 Km WBM, AWC in progress. |
No Image |
Nowshera | |||||||||||||||||||
1530 (OG) |
151074-Construction/ Pavement of roads /streets alongwith allied works in UCs Kurvi and Dheri Kati Khel, District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 449.904 | 366.178 | 30 | 22.5 | 22.5 | 20.07 | 386.248 | 53.726 | 88% |
86% May - 2021 |
18 Km (original scope) - completed. Revised scope - in progress. |
No Image |
Package-1 - UC Dheri Katti Khel
Package-2 - UC (Dheri Katti Khel) Armour Colony, Hakeemabad
Package-3 - UC Kurvi
Package-4 - UC (Kurvi) Zakhijat, Banda Mulahan, Bajurabad | |||||||||||||||||||
1531 (OG) |
170581-Construction of Army Camp Koroona Sartaj Abad Akora Khattak road (1 KM) and village Khawrai Jehangira Abad, District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 125 | 25 | 25 | 25 | 25 | 150 | 0 | 100% |
100% May - 2021 |
7 Km - 7 km asphalt completed. |
No Image |
Nowshera | |||||||||||||||||||
1532 (OG) |
190582-Construction of roads in District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 50 | 50 | 50 | 50 | 50 | 100 | 50 | 67% |
67% May - 2021 |
(Length = 7.367 Km) Procuremnet under process. Total street pavement 126-mtr
(PK -61) |
No Image |
1533 (OG) |
190586-Construction of roads in District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 337.951 | 10 | 10 | 10 | 10 | 10 | 20 | 317.951 | 6% |
6% May - 2021 |
Work in progress.
(Pl-62) |
No Image |
1534 (OG) |
190587-Construction of roads in District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 152.378 | 50 | 50 | 50 | 50 | 50 | 100 | 52.378 | 66% |
66% May - 2021 |
(Length = 18.135Km)
work order issued work started |
No Image |
1535 (OG) |
190588-Construction of roads in District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 10 | 10 | 10 | 10 | 10 | 20 | 130 | 13% |
13% May - 2021 |
Work order issued
(PK-64) |
No Image |
1536 (OG) |
190589-Construction of roads in District Nowshera. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 10 | 10 | 10 | 10 | 10 | 20 | 130 | 13% |
13% May - 2021 |
Work strated. |
No Image |
1- Taru Oil depu (Road 1.310 Km, PCC 1.23Km)
2- Mazoob Baba stop to Qazyan Qabristan Road 1.50 Km, Street 0.90 Km)
3- Cherat road polic chowki to Saleh khana (Road 1.60 Km) | |||||||||||||||||||
1537 (OG) |
140695-F/S, Design and Rehabilitation of (1) Tor Dher-Alla Dher Road (2) Nawa Nehar Kund Park- Alla Dher Road, District Swabi. |
Swabi HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 180 | 157.866 | 12.134 | 12.134 | 12.134 | 12.134 | 170 | 10 | 94% |
94% May - 2021 |
11- Km completed.
3.25 Km 70% completed.
Can be complted provided balance Rs. 12.5 m given |
No Image |
1) Tordher Alladher road (width 18 ft)
2) Nawan Nehar Kund Park Alladher Road (width 18 ft) | |||||||||||||||||||