Progressive Review for the month(s) of : May - 2021,

Showing Page Number : 47 of 69

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
1445
(OG)
200180-Establishment of Emergency Rescue Services (Rescue 1122) in FR,s of Khyber Pakhtunkhwa.(AIP)
FR Peshawar
30-11--1 30-11--1 - 30-11--1 - 45 0 40 40 0 0 0 0
May - 2021
Layoutn Given
No Image
Rescue (1122) Sataon at Tribal District Hassan Khel
1445
(OG)
200180-Establishment of Emergency Rescue Services (Rescue 1122) in FR,s of Khyber Pakhtunkhwa.(AIP)
FR Tank
30-11--1 30-11--1 - 30-11--1 - 45 9.776 45 45 45 32.711 42.487 0 100% 94%
May - 2021
MB= F/Floor in progress. C/Wall = 80%Completed. OHT,Tubewell & Water tank in progress.
No Image
Rescue Station at Jandola Tribal Sub Division Tank
1445
(OG)
200180-Establishment of Emergency Rescue Services (Rescue 1122) in FR,s of Khyber Pakhtunkhwa.(AIP)
Lakki Marwat
30-11--1 30-11--1 - 30-11--1 - 45 0 40 40 40 11.012 11.012 5 89% 24%
May - 2021
01- Unit Work completed upto roof level, T/Well Completed Above DPC level in progress B/Wall in progress
No Image
1 FR Lakki
1445
(OG)
200180-Establishment of Emergency Rescue Services (Rescue 1122) in FR,s of Khyber Pakhtunkhwa.(AIP)
Provincial
30-11--1 30-11--1 - 30-11--1 - 1220 543.54 676.46 676.46 0 0 543.54 0 - -
May - 2021
No Image
1446
(New)
200181-Economic Revitalization of District North Waziristan ? Compensation for Businesses Lost (Phase-II) (AIP)
Provincial
30-11--1 30-11--1 - 30-11--1 Line Deptt 5766.914 0 100 100 0 0 0 0 - -
May - 2021
No Image
1447
(New)
200276-Establishment of Khyber Pakhtunkhwa Emergency Services Academy at Shahkas, Khyber (Rescue-1122) (AIP)
Khyber
30-11--1 30-11--1 - 30-11--1 Line Deptt 2450 0 0 0 0 0 0 0 - -
May - 2021
Land acquisation under process PC-II ? Rough cost estimate submitted to DG Rescue 1122
No Image
1448
(OG)
180590-Construction of Bachelor Hostel for C&W Staff at Tank
Tank
30-11--1 30-11--1 - 30-11--1 - 66.604 0 10 10 10 10 0 0
May - 2021
MB- finishing stage. Ist Floor finishing stage. T/Well structure completed. Overhead Tank in progress. Demand Rs: 22 M (Liability)
No Image
Tank
1449
(OG)
170167-Reconstruction of C&W Office, Kohat
Kohat
30-11--1 30-11--1 - 30-11--1 - 93.809 0 10.464 39.046 39.046 29.679 0 0
May - 2021
01-Unit M. Building Completed. Boundary Wall completed. Dev: work 95% Completed Int: Elec: Completed Bore Hole Completed Fire Fighting Completed Sewerage System Completed TS Submitted to SE. P-II: Balance Funds. Demand: 28.582 M.
No Image
1. Reconstruction of C&W Office, Kohat
1450
(OG)
120779-Strengthening and Capacity Building of Material Testing Labs for C&W Department, Peshawar
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 200.251 154.435 10 3 3 0 154.435 35.816 82% 77%
May - 2021
8 Nos vehicles, 7 lab equipments procured. Revised DCE submitted to P&D Deptt: for Rs.283.203 (M).
No Image
08 Nos Vehicles
Single Cabin Pickup 08 Nos
Double Cabin 01 No
Peshawar (Lab Equipments 7 Nos / Main Lab civil work)
1451
(OG)
200004-Provision of Buildings and Department for NH&MP on Swat Expressway.
Swat
30-11--1 30-11--1 - 30-11--1 - 398 11.25 15 15 15 11.25 22.5 371.75 7% 6%
May - 2021
Design supervisiory has been hired. TS under preparation upto 15th March 2021 Tendering in progress
No Image
Swat
1452
(OG)
90444-Creation of CSR/MRS Cell in C&W Department
Provincial
CSR
30-11--1 30-11--1 - 30-11--1 - 67.44 57.164 10.276 10.276 10.276 0 57.164 0 100% 85%
May - 2021
MRS-2020 submitted to CA. Will be completed by June-2021.
No Image
CSR/MRS Cell
1453
(OG)
120362-Emergent nature and Additional Construction of Office/Residential Buildings.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 7.847 0 0 0 0 0 0 7.847 - -
May - 2021
Work order issued. Work Executed By PBC
No Image
1) Construction of Mosque in Khyber Pakhtunkh
1453
(OG)
120362-Emergent nature and Additional Construction of Office/Residential Buildings.
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 334.737 246.478 10 10 10 7.5 253.978 78.259 77% 76%
May - 2021
Bore, OHT completed. CM Sectt Annexi work completed. Commissioner House completed. Constn: of office SE PBC-1 completed. P&D block completed. Covered Walkway in progress. OHT Gunner lane is in progress. Demand Rs. 20 m TS Submitted
No Image
1) Boring of Tube Well and construction of over head tank
1453
(OG)
120362-Emergent nature and Additional Construction of Office/Residential Buildings.
Provincial
30-11--1 30-11--1 - 30-11--1 - 352.584 251.718 10 10 10 0 251.718 0 - -
May - 2021
Work in progress.
No Image
1453
(OG)
120362-Emergent nature and Additional Construction of Office/Residential Buildings.
Swat
30-11--1 30-11--1 - 30-11--1 - 10 0 0 0 0 0 0 10 - -
May - 2021
Work order issued. Occupied by Pak Army.
No Image
Construction of C&W SDO office / residence at Kalam PK-02
1454
(OG)
120842-Establishment of Project Unit for PaRRSA / PDMA for USAID Projects in C&W Department.
Provincial
PDMA
30-11--1 30-11--1 - 30-11--1 - 269.068 170.807 20 20 20 4.047 174.854 78.261 71% 65%
May - 2021
Salary + Car Purcahse In progress. Demand Rs. 32 m
No Image
1455
(OG)
120870-Continuing Professional Development of Engineers
Provincial
CS
30-11--1 30-11--1 - 30-11--1 - 2.23 2.73 1 1 1 0.35 3.08 0 100% 100%
May - 2021
Work in progress.
No Image
1456
(OG)
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK
Peshawar
BD-1
30-11--1 30-11--1 - 30-11--1 - 19.977 8.5 4.306 4.306 4.306 4.306 12.806 7.171 64% 64%
May - 2021
01- Unit Final Structural Drawing of 1 & 2 Kanal Primary School, 4&8 kanal secondary school plain area Zone 2 -B , 3&4(0.5 TSF 0.75,1.00 Tsf 1.25 TST & 1.5 TSF bearing capacity has been received . Over Head Tank designs for 0.5 TSF & above (5000,10000,15000,20000 gallon) received. Design forRRM wall(6,12,16 ft) plum concrete retaining wall (8,14,20 ft) and RCC retaining wall (10,20,25 ft) for 5 No bearing capicity submitted Architural drawing of Degree collegs, RHC's andBHU yet to be updated by CDO. Primary 1 &2 kanal plain/Hilly and Secondary 4&8 kanal plain/Hilly DCE submitted tCDO (0.75 TSF). DCE of primary 1&2 kanal plain & 2 kanal 2B, 3&4( All bearing capicity). Preparation under progress. Completion June -2021.
No Image
Peshawar
 
Scope of work:
  • Structural Design for 0.5, 0.75, 1.0 & 1.25 TSF Bering capicity & 3 Seismic Zones of following schemes
  • Primary School 1 & 2 Kanal
  • Secondary School 4 & 8 Kanal
  • Degree Colleges (B&G) 40 Kanal
  • BHU 4 Kanal
  • RHC 10.75 Kanal
  • OTH for 4 capacitiies
  • R/Wall
  • Plumbing
 
1456
(OG)
160530-Provision for Design of Structural / Plumbing / Elect/ Air Conditioning various Buildings in KPK
Provincial
30-11--1 30-11--1 - 30-11--1 - 19.977 8.499001 11.478 11.478 6 0 8.499001 0 100% 43%
May - 2021
Final Structural Drawing of 1 & 2 Kanal Primary School, 4&8 kanal secondary school plain area Zone 2 -B , 3&4(0.5 TSF 0.75,1.00 Tsf 1.25 TST & 1.5 TSF bearing capacity has been received . Over Head Tank designs for 0.5 TSF & above (5000,10000,15000,20000 gallon) received. Design forRRM wall(6,12,16 ft) plum concrete retaining wall (8,14,20 ft) and RCC retaining wall (10,20,25 ft) for 5 No bearing capicity submitted Architural drawing of Degree collegs, RHC's andBHU yet to be updated by CDO. Primary 1 &2 kanal plain/Hilly and Secondary 4&8 kanal plain/Hilly DCE submitted tCDO (0.75 TSF). DCE of primary 1&2 kanal plain & 2 kanal 2B, 3&4( All bearing capicity). Preparation under progress.
No Image
1457
(OG)
180346-Extension of Existing Facility of MIS/ GIS for Paperless Environment in C&W Department
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 46.968 25.968 25.968 12.984 12.984 0.418 26.386 0 100% 56%
May - 2021
Computers, printers, Softwares, Procured. Machinery & equipment H/O to Director IT Completion June-2021.
No Image
Peshawar
1458
(OG)
140987-F/S, Design and Construction of main Daraband Road from Sagu to Madi via Gara Unra Attal Sharif Road (16 Km) Kulachi D.I. Khan i) Kirri Shamozai to Jhoke Rind (1Km), ii) Bridge on Lora Jullah Daraban City.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 220.219 178.586 31.057 31.057 31.0565 22.193 200.779 10.576 95% 91%
May - 2021
Length 16 Km -Completed. (original Scope) . Revised Scope (Lora Bridge (length 120 ft, 4 span) - Bridge sub structure work order issued. In Progress Cannot be completed in CFY as the revised Scope Started. TF : Rs. 10 M
No Image
1) Construction of Bridge on Lura Nullah at Daraban PK-67 (additionnal works)
2) Improvement and BTR from Kirri Shamozai to Jhoke Rind PK-67 1 Km (additionnal works)
1459
(OG)
150780-Const/Reh: of road A)Tank Ada-Zafarabad Clny& Daraban Chungi B)Crclr rd-Muryali Mor, Shahalam Abad,Eye Hsptl rd,Chashma rd-Vill Singar,S/Yusafabad, D.I.Khan a)Crclr rd-Multan rd b)Diyal c)Banu rd-Kotli d)TB Hsptl Chk-Circ/Hous e)Drain(Kotli-Shobra
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 198.123 159.593 38.53 38.53 38.53 22.3 181.893 0 100% 92%
May - 2021
Length 10.24 Km - completed. Compleetd - delet from Draft ADP.
No Image
1) Tank Adda to Zafar Abad Colony 1.70 Km
2) Tank Adda to Daraban Chungi (Din Pur) 1.60 Km
3) Circular road to Muryali Mor (Multan road) 2.25 Km
4) Shah Alam Abad/Eye Hospital road 1.09 Km
5) Chashma road to village Singar 0.60 Km
6) Sheikh Yousaf (Grid Road) 3 Km
7) Road from Circular road to Multan road (old Sabzi Mandi front) - additional works
8) Rehabilitation of Diyal road balance length - additional works
9) Construction of Bannu raod to Kotli road - additional works
10) TB Hospital Chowk to Circuit House road - additional works
11) Repair/construction of Drain from Kotli to Shobra Hotel - additional works
1460
(OG)
150782-Construction / rehabilitation of roads from UC Dhap, UC Mandran,UC Ketch, UC Hissam, UC Yarik, UC Korai, UC Zandani, UC Band Kurai UC Chehkan, UC Laar in District D.I Khan
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 199.919 129.537 20 29.3 29.3 21.564 151.101 50.382 75% 76%
May - 2021
Length 26.7 Km- 19 units (avg width 12) -completed. Completed . Delete from Draft ADP
No Image
1) Construction of various roads in UC Dhap (a) Qazi Kohkar 1.5 Km (b) Thathan Balochan1 Km (c) Long Khair Shah 1.21 Km (d) Kala Gorh 1.48 Km
2) Construction of various roads in UC Mandhran (a) Manduwala 1 Km (b) Kotla Saidan 0.91 Km
3) Construction of various roads in UC Ketch (a) Shah Kot Minor to village Ghabbi 1.33 Km (b) Muqeem Shah 1.18 Km (c) Village Jabbar Wala 1 Km
4) Construction of various roads in UC Hissam (a) Garah Rehman 0.61 Km (b) Hissam road 1.46 Km
5) Construction of various roads in UC Yarik (a) Budh to Saddra Sharif 5 Km
6) Construction of various roads in UC Kural (a) Gomal Kalan road 1.15 Km (b) Garah Hayat village road 2.07 Km
7) Construction of various roads in UC Zindani (a) Zindani village road 0.76 Km (b) Daraban road to Disty-7, Tiken village road 1.23 Km
8) Construciton of various roads in UC Bund Kural (a) Mardan Bridge to Sakhi Darbar 0.64 Km (b) Village Bund Kurai road 2.79 Km
9) Construction of various roads in UC Chehkan (a) Shero Kohna village road 1.25 Km
1461
(OG)
150785-Construction of Road from Chodhwaan to Gataar to Jandi babar to Maro Main Road (UC Chodhwaan) and Musazai Sharif to Kot Shanawaz to Gara Mir Alam to Gara Essa Khan (UC Musazai sharif) District D.I.Khan i) Bridge on Valeri Nullah Chodwan Kot Tagga R
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 199.526 88.45599 20 20 20 20 108.45599 91.07 54% 54%
May - 2021
Length 26 Km (width 12 ft) - 03 -Units 1. E/W,S/B,B/C & S/Work in progress. 2- Bridge on Aaleri Nullah (Test pile completed). 3- Bridge - Piles completed
No Image
1) Choudwanto Gataar to Jhandi Babar to Maro Main road UC Choudwan 13 Km
2) Musa Zai Sharif to Kot Shah Nawaz to Garah Mir Alam to Gara Issa Khan UC Musa Zai Sharif 13 Km
3) Construction of Bridge on Waleri Nullah Choudwan Kot Tagga raod 265 rft) - additional work
1462
(OG)
150786-Construction / Improvement & widening of Paniala Paharpur road, Paniala Chunda road, Pharpur Bypass road and Construction of one number Bridge on Paniala bypass road District D.I.Khan.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 199.822 165.756 34.193 22.997 22.997 16.973 182.729 0 100% 91%
May - 2021
Completed . Delete From Draft ADP
No Image
1) Panyala Paharpur road 4 Km
2) Panyala Chunda road 3 Km
3) Paharpur Bypass road 2.3 Km
4) Construction of 1 No bridge on Panyala Bypass road
5) Paharpur Bypass road (balance portion) 3.30 Km
1463
(OG)
190500-Construction of roads at Ucs 1, 2, 3, 4, 5, DD-1, DD-2, Shorkot, Ratta Kulachi, Dewali District D.I Khan.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 300 18 20 20 20 20 38 262 13% 13%
May - 2021
29- Units Earth work completed. Demand Rs. 70 M (Liability ).
No Image
1464
(OG)
200005-Rehabilitation of Gandi Ashiq to Gandi Umer Khan Road (11-Km) District D.I.Khan.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 137.052 0 20 20 20 20 20 117.052 15% 15%
May - 2021
Length 11 Km - E/work is in progress.
No Image
1465
(OG)
150795-Construction of road from a) Ghazi Khel to Phar Khel Pacca (5.156 Km), b) Zangi Khel to Mela Mandra Khel (3-Km), c) Gambilla Phar Khel to Wanda Pashan (2.5-Km), d) Ghani Khel to Tajori road & Barham Khel to Pahar Khel Paca (29-Km), Lakki Marwat
Lakki Marwat
HW
30-11--1 30-11--1 - 30-11--1 - 560 115.366 80 80 80 80 195.366 364.634 35% 35%
May - 2021
Length 5.15 Km (width 18 ft) - earth work, sub base in progress. Demand Rs. 100 M
No Image
  1. Ghazi Khel to Pahar khel Pacca (4.00 KM)
  2. Zangi Khel to Mela Mandra Khel (03 KM)
  3. Gambilla Phar khel to Wanda Pashan (2.50 KM)
  4. Ghazni Khel to Tajori via Kheru khel Pacca & baram khel (29 KM) ORG:  333.920  Million              
5. Cost of Land
1466
(OG)
150797-Construction/ Black topping of road from Chashma road to Wanda Nizami via Wanda Dalwati, Wanda Baru District Lakki Marwat.
Lakki Marwat
HW
30-11--1 30-11--1 - 30-11--1 - 150 51.049 20 20 20 20 71.049 78.951 47% 47%
May - 2021
Length 6 Km - 3 km completed. Demand Rs: 15 M
No Image
PK-76, Lakki Marwat
1467
(OG)
190499-Improvement & Rehabilitation of road from Sakhi/Malang Adda to Tajori via link road to Khan Killa and village Landi Mir Salam Sukeman Khel, District Lakki Marwat
Lakki Marwat
HW
30-11--1 30-11--1 - 30-11--1 - 550 0 80 129 129 128.499 128.499 470 15% 23%
May - 2021
Work in progress. Survey in progress Earth work in progress in KM 01 to 10. demand Rs. 100 M
No Image
?Improvement & Rehabilitation of Road from Sakhi Malang Adda to Tajori via Link Road to Khan Killa and village Landi Mir Salam Saleman Khel? within an enhanced cost of Rs. 550.000 Million.
1468
(OG)
140885-Reconstruction / Rehabilitation of road from Narmi Khel to Miryan,District Bannu.
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 533.606 269.186 25 64 64 64 333.186 239.42 55% 62%
May - 2021
work in progress cout stary in KM 1 due to encorachment 04 KM Adverstisment in process Revised TS Submitted Demand Rs. 60 M ( Liability )
No Image
Bannu
1469
(OG)
140886-F/S, Design & Construction of 05 Km road from Bannu City to Kakki via Mundan, Bannu.
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 220 53.213 10 49 49 49 102.213 156.787 29% 46%
May - 2021
work in progress Demand Rs: 50 ( t5empo )
No Image
5 Km Bannu
1470
(OG)
141018-F/S,design and Construction of Road from Kashu Khel Chowk via Sarki Khel Barmi Khel to Highway Bannu (8 Km)
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 90.612 59.697 15 12 12 12 71.697 15.915 82% 79%
May - 2021
work in progress 3.5/4 KM completed Liability 11 M
No Image
Bannu
1471
(OG)
150790-Construction /BT of 10 KM Roads in District Bannu.
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 100.1 56.075 39.025 14.025 14.025 14.025 70.1 5 95% 70%
May - 2021
work started
No Image
1) Fatima Khel to Piran road Bazar Ahmad Khan
2) Hassani Kala to Talab Shah
3) Amandi Kala to Kot Barara road
4) Danday Kala to Mandati Ketkai
5) Lalozai to Mir Aslam Surrani
6) Bangi Khel Sabir Khan Surrani
7) Master Abad and Shahji Abad Bazar Ahmad Khan
8) Shahbaz Azmat Khel road to Kotka Pakistan Gandali
9) Anwar Kamal Daud Shah
10) Sher Ali Baz Daud Shah
11) Power House No.2 to Umerdin Koroona
12) Police Canttto Army Gate
13) Khan Koroona Surrani
14) Ali Koroona Surrani
15) Kotka Feroz Oabaz Koroona
1472
(OG)
150793-Rehabilitation/ BTR road from Baran Dam to Jani Khel and Police station Miryan to Hawaid road District Bannu.
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 436.034 124.395 15 58 58 43.555 167.95 296.639 32% 39%
May - 2021
Length 9.5 2 km complted KM 4, 5, 6 in progress.
No Image
Existing road
- Baran Dam to Jani Khel 0+0 to 2-825 and 4+400 to 10+600 (length 9 Km)
New road
- Baran Dam to Jani Khel (from 16+600 length 6 Km)
- Baran Dam to jani Khel (from 0+000 to 2+00 length 2 Km)
- Police Station Miryan to Haved road (0+000 to 2+00 length 2 Km)
1473
(OG)
151077-Construction/ Reconstruction / Rehabilitation of road, UC Nar Jaffar, UC Kakki-I, UC Baharat, UC Kosar Fateh Khel, UC Mandan, UC Shamshi Khel & UC Mira Khel, District Bannu.
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 350 72.349 50 33 33 20.339 92.688 227.651 35% 26%
May - 2021
6/15 KM GSB completed. 7/21 work in progress.
No Image
  1. Hati Khel to Gulan Killa Cachkot via nar Haqdad ayaz gharfar qabar
  2.  Haji Gul Kila to Gulsan Killa
  3. Dar Pub Police Chowky  to Nar Sher Khan Chowk
  4. Shuhada Qabristan to Mir Afzal Killa
  5. Nar Shukarullah road to Mir Alam Killa
  6. Narang road to Nar Dip Chand Kobal Khan
  7. Naurang Kakki road to Sharif Kila
  8. Lakki road to Nar Hafiz abad
  9. Bannu Kakki road to Sabo Khel mandan
  10. Kakki road to Nuwa Kila Bharat road
  11. Tughal Khel road to Deewanan Tughal Khel
  12. Akra Bharat road to Mughal Khel
  13. Mir Ahmad to Kausar Fateh Khel road
  14. Nar Shukaur Ullah G/Yard to Nar Faizullah
  15. Nar Mir Akbar road to Mukabali Khan Korona
  16. Zalam Mandan to Haiam Ground via kHujaram
  17. Pukhtunkhwa Chowk M/road to dairy Qabristan
  18. Dangr Kila Kakki to GHS Nar Shukurullah  & Lakki road
  19. Pia Kila road to Sherin Zaman Korona
  20. Anwar Ata Muhsin Near Nearay Chowk to Daur Kakki
  21. Landidak road to Sher Dil Killa Chowk Kakki
1474
(OG)
151078-Construction/ Rehabilitation of road, UC Mira Khel, UC Kakki-II, UC Ismail Khel, UC Qalander, UC Khujare, UC Khujamad Mandan, UC Kala Khel, District Bannu.
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 600 68.906 20 23 23 11.284 80.19 511.094 15% 13%
May - 2021
26-units. Revised AA approved. Work in progress on all units.
No Image
  1. Taji Kalal ada via Chowk Karaim
  2. D.I Khan road to Danday Killah
  3. Ghoriwala to Kotka Azad Mughal Khel
  4. Manja Khel to Gidaray
  5. Main D.I Kha roa to Sar Mast Mira Khel
  6. Main D.I Khan road to Barara Mira Khel
  7. Naray Pul Ada Lakki road to Atta Abad
  8. Seru Bada Khel to Marwat Nani House
  9. Main D.I Khan road to Muhammad Khan
  10. Kala Khel to Kotka Jirabaz
  11. Main Kala Khel to Kotka Ghuam Jan road
  12. Kala Khel road to Malik Rafiullah Khan korona
  13. Maye Kila Mandan to Beri Khel
  14. Sarmat Mira Khel to Ismail Khel road
  15. Shahji Machine to Naqas band road
  16. Ismail road to Dandi Ismail Khel
  17. Main Khujari road to Badshah Khan Korona
  18. Main Khujari road Chandi Chowk
  19. Ihsna Masud Kila road to Kakki
  20. Degan to Taji Kila Ada D.I Khan road
  21. D.I Khan road toQamar Kila Mria Khel
  22. Fazal shah Mira Khel to Ramzan Mira Khel
  23. Main Lakki road to Nek Chariman Korona
  24. Sher Gul Khujari Road to Arhi Killa
  25. Qabristan Mir Alam Khujari Road to Khwaja Kila
  26. Main D.I Khan road to Kotka Najam Shah Chowk
1475
(OG)
170639-F/S & Construction of Hindi Khel Haved Road and Construction of roads at UC Momand Khel UC Mitha Khel, District Bannu.
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 600.066 23.544 15 15 15 15 38.544 561.522 6% 6%
May - 2021
Length 13 Km (width 20 ft) - work started.
No Image
  1. Bannu Haved road to Sheikh Farid Baba 2 KM
  2. Miranshah road to Mamand Khel 2 KM
  3. Miryan road to Nawaz abad 1 KM
  4. Miryan road to Qamar Killa Server Fateh Khel 1 KM
  5. Miryan road to Barkzai (Hunny Killah) 4 KM
  6. Canal to Sunny Khel (Remali Koroona) 2 KM
  7. Lali Zaman Koroona to Baran Koroona 1 KM
  8. Miranshah road to Murib Khel Malik Ismail Koroona 1.88 KM
  9. Miran Shah road to Yaqoob Advocate House 0.25 KM

1476
(OG)
170666-Const. & BT of Road from Chak Dadan Togalkhel via Ismail Khel Bannu (3 KM).
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 48.804 46.567 2.237 2.237 2.237 2.23 48.797 0 100% 100%
May - 2021
1.5 KM main road chakdadan to Ismail Khel E/W,S/W in progress. Can be complted provided balance funds as per AA Rs. 30.664 M provided.
No Image
Bannu
1477
(OG)
170667-Construction / BT and Reconstruction of Road at Kalan Mera Khel via Barara Mera Khel to Hamedi road Hassan Khel via Khujari to Barat Ada Kakki Road, District Bannu (8.50 Km)
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 120.75 10 10 19 19 10 20 100.75 17% 17%
May - 2021
01- Units Work started.
No Image
Bannu
1478
(OG)
190496-Construction /Rehabilitation/Widening/BT to Chakar Mandan road from DI.Khan road to Kakki Road including Narjaffar Nar Shukrullah road Bannu.
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 285.029 5 10 5 5 5 10 270.029 5% 4%
May - 2021
Tender to be cancelled. Rs. 5 m paymnet to WAPDA
No Image
  1. Nar Jaffar Shukar Ullah 11 KMS
  2. Chakar Manda
1479
(OG)
190497-Construction of Shaktoo bridge on Janikhel road and Construction/Rehabilitation of roads in Tehsil Bakha Khel and adjoining areas District Bannu.
Bannu
HW
30-11--1 30-11--1 - 30-11--1 - 349.976 0 10 13 13 13 13 339.976 3% 4%
May - 2021
Work started.
No Image
  1. Road form Marwat Cannal road to Gul Baz Khan Korona 2.5 KM
  2. Road from Khaisora road to Umer Din Korona 0.35 KM
  3. Road form Khaisor road to GHS Janoor Narmi Khel 0.75 KM
  4. Wali Noor Jani Khel towards Narmi Khel via GGSS Jani Khel 1.8 KM
  5. Remaining road of Main Jani Khel to FC Fort 2 KM
  6. Main Allah Khel toad to Mirali Islamic Madrassa 1  KM
  7. Main Miryan Road to Garira Shahjahan 1 KM
  8. Box Culverts at Main Jani Khel road Near (Shakti Khure)
  9. Pepal Bazar to Khurram Ghari 1 KM
  10. Lewot Landidak vai Tari Khel 3 KM
  11. Haved road to Haved village 1 KM
  12. Main Haved Aadda road 1 KM
  13. Allah Khel village road 2 KM
  14. Marwat Canal to Laka Showiya via Noor Zali House 2 KM
  15. Marwat Canal road to Village Malik Gul Behram 1 KM
  16. Marwat Canal road to Maizullah Khan Korona 0.4 KM
  17. Ghora road to Ghulam Din Korona 0.14 KM
1480
(OG)
140700-F/S, Design and Construction of Roads, Odin Shah Kalay to Jarasi Banda, Takhte Nasrati to Sarki Lawaghar Road via Poya, Latamber to Kamali Banda Road, Latamber to Indus Highway Road via Warana (11 Kms), District Karak.
Karak
30-11--1 30-11--1 - 30-11--1 - 194.916 157.358 20 20 20 19.9 177.258 17.558 91% 91%
May - 2021
Length 11 Km - WBM 9 Km completed. Balance work tender at S.No 4 under process. Liability : 20 M P-II : Demand Rs 30 M for completion
No Image
1) BTR from Odin Shah Killa to Jarasi (2 Km)
2) BTR from Takhti Nasratti to Sarki Lawaghar via Poya (2 Km)
3) BTR from Latambar to Kamali Banda road (3 Km)
4) BTR from Latamber to Indus Highway road via Warana (4 Km)
1481
(OG)
141017-Dualization of Road from Indus Highway Chowk to Karak City, Karak (4.225 Km)
Karak
30-11--1 30-11--1 - 30-11--1 - 390.218 372.748 52.582 52.582 52.582 36.516 409.264 0 100% 100%
May - 2021
(Length 4.225 Km) E/W,S/B,WBM completed Asphalt in progress. Demand Rs: 26 M
No Image
Karak
1482
(OG)
150858-Construction/ rehabilitation of road from a) Nari panoos to Teri chowk Banda Daud shah b) BT from Kando Khel to Faqir Abad and Construciton of Bridge at Kandawo AlGada UC Sabir abad District Karak. (10 Km)
Karak
30-11--1 30-11--1 - 30-11--1 - 150 106.471 20 20 20 19.999 126.47 23.529 84% 84%
May - 2021
02- Components. Length 10 Km (width 20 ft) - WBM completed, & Asphalt completed on Reach-A. Reach-B in progress. P-II : Rs. 40 M
No Image
1. Nari Panoos to Teri Chowk Banda Daud Shah? Rs; 77.346 M
2. B/T from Kandu Khel to Faqir Abad and Const: of Bridge at Kandow Algada U/C Sabir Abad Karak? Rs;72.654 M
1483
(OG)
150859-Construction and Blacktopping of road from Sarki Lawagher to Alamsheri District Karak.(12Km)
Karak
30-11--1 30-11--1 - 30-11--1 - 315.636 204.887 30 30 30 30 234.887 80.749 74% 74%
May - 2021
03- components Reach -A Completed. Reach- B Asphlat Completed. Reach-C ; WBM in Progres. P-II : Rs. 20 M
No Image
1. BTR Sarki Lawagher to Madaki Siraj Baba Portion 6-KM ? Rs; 81.526 M
2. BTR Takhti Nasratti to Bogara Dagar Killa 6-KM ? Rs; 68.474 M
3. .?? Rs; 140.577 M
i. Const: of C/Way at Bogara Mohabat Khel Algada
ii. Reamining Portion of Reach A (1-KM) Sarki Lawagher to Maddaki Road
iii. Remaining Positon of Reach B (5-KM)  7 & 11 Dagar Killa Chowk to Alam Sheri
1484
(OG)
170567-Construction of Black Topped road from Terri to Kot Banda at Tehsil Banda Daud Shah, District Karak
Karak
30-11--1 30-11--1 - 30-11--1 - 117.419 12.466 20 20 20 15.563 28.029 84.953 28% 24%
May - 2021
5 km road - 1 km Asphlat in progress 4 km - Started Demand Rs. 20 M
No Image
Karak
1485
(OG)
190581-Construction / Rehabilitation of BT road in Tehsil Karak, Takht-e-Nasrati and Banda Daud shah, Karak
Karak
30-11--1 30-11--1 - 30-11--1 - 250 0 10 10 10 10 10 240 4% 4%
May - 2021
2 Units - 1 Work in progress 1 Unit - Work in progress. Demand RS. 30 M
No Image
1. Imp:/Rehab: of BTR from Niazi Well to Palosa Sar 16.5 KM
2. BTR Nusrat Abad to Jehangiri Banda via Lashti Koroona i/c Lik road of Mir Dil Banda
 
1486
(OG)
150973-Construction and Blacktopping of Banda Fateh Khan Road Darmalak road, Darmalak to Ghorzandi road, Darsha khel road Rehman abad Pakka road, Krappa Shakardara road including bridge & PCC Roads in UCs, Sodhal, Lachi rural, Mandori District Kohat
Kohat
HW
30-11--1 30-11--1 - 30-11--1 - 306.226 247.637 30 30 30 30 277.637 28.589 91% 91%
May - 2021
Bridge at Tarali - piles 64/80 completed, Package-II completed. Package -I approaches in progress. Demand : 20 M Liability
No Image
1) Banda Fateh Khel, Darmalak Road (2 Km)
2) Darmalak to Ghorzandi Road (0.5 Km)
3) Darsha Khel to Rehman Abad Paka (1 Km)
4) Karapa to Shakardar Road and Bridge Tralay (1 Km and 2600 rft)
5) UC Sudal, Lachi and Mandori (2 Km)
1487
(OG)
190550-Construction of C&W roads in Tehsil Kohat, Gumbat and Lachi District Kohat
Kohat
HW
30-11--1 30-11--1 - 30-11--1 - 350 0 45 45 45 45 45 305 13% 13%
May - 2021
4/26 Units - Work started. Demand : 50 M Liability
No Image
1. Repair & Rehab: of Bilitang to Kot .?. Rs; 436.184 M
2. Repair & Rehab: of kHARmatoo to Bhura Ghari Road.?. Rs; 15.213 M
3. Repair & Rehab: of Kot to Marchongi Road .?. Rs; 447.143  M
4. Repair & Rehab: of Sabir Abad Chowk to Kala Bagh .?. Rs; 27.553  M
5. Repair & Rehab: of Lachi Dartapi to Nadar Banda.?. Rs; 24.215  M
6. Repair & Rehab: of KDA Gate No. 3 to DHQ Hospital Road .?. Rs; 16.923 M
7. Repair & Rehab: of Charbagh Road  .?. Rs; 2.905 M
8. Repair & Rehab: of Malang Abad Road  .?. Rs; 1.823 M
9. Repair & Rehab: of Bypass to Malang Abad Chowk Road .?. Rs; 9.157 M
10. Repair & Rehab: of Gamkol Road .?. Rs; 3.245 M
11. Repair & Rehab: of Near Eid Gah Road via Sheri Villa Road  .?. Rs; 3.801  M
12. Repair & Rehab: of Navay Kally Road to Gulraiz   Banda to Jungle Khel Byass Road  .?. Rs; 20.961 M
13. Repair & Rehab: of Eid Gah to Bypass Navay Kallay Chowk  .?. Rs; 4.841 M
14. Repair & Rehab: of OTS to Sheri Villa Road  .?. Rs; 13.895  M
15.  Repair & Rehab: of Bypass to Momidhan Road  .?. Rs; 1.792 M
16. Repair & Rehab: of Hafiz Abd Road .?. Rs; 3.564 M
17. Repair & Rehab: of Pehlawan Banda Road  .?. Rs; 8.518 M
18. Repair & Rehab: of Branch Road Kachi .?. Rs; 5.180  M
19. Repair & Rehab: of Main Abdul Ali Check Post .?. Rs; 11.700 M
20. Repair & Rehab: of RCH Roa, Alizai Road, Khadizai Road, Bositang Road, Tora Wari Road, Speena Khawar Orad, Chishma Mitha Khan, & Dargah Road .?. Rs; 43.775 M
21. Repair & Rehab: of National Bank Road at Kachai .?. Rs; 2.503 M
22. Repair & Rehab: of Marai Branch Road  .?. Rs; 4.223  M
23. Repair & Rehab: of Hassan Khel Kachi Road .?. Rs; 8.003 M
24. Repair & Rehab: of New Road PK-82  .?. Rs; 15.502  M
25. Repair & Rehab: of Dargah Road/Graveyar Road  .?. Rs; 5.068 M
26. Repair & Rehab: of Khwaja Abad Road  .?. Rs; 12.236 M
Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69