Progressive Review for the month(s) of : May - 2021,

Showing Page Number : 38 of 69

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Swat
30-11--1 30-11--1 - 30-11--1 - 5.596 0 0 0 0 0 0 5.596 - -
May - 2021
Payment made to DC Swat for land acquisition.
No Image
1) Acquisition of land for extension of Car Park o
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Buner
30-11--1 30-11--1 - 30-11--1 - 27.199 13.429 9.75 9.75 9.75 7.75 21.179 4.02 85% 78%
May - 2021
01-Unit Revised Estiamted submitted for approval G/F finishing in progress 1st floor plaster in progress
No Image
Bachelor Hostel for Judicial Officers in Distt: Bunner PK-20
 
Scope of work:
  • 08-Nos Suits
  • Dev: work
  • OHW Tank
  • Compound wall
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 36.743 18.297 17.5 17.5 17.5 10.62 28.917 0.946 97% 79%
May - 2021
Finishing in progress
No Image
Dir Lower
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Hangu
30-11--1 30-11--1 - 30-11--1 - 26.647 0 2 2 2 0 0 24.647 8% -
May - 2021
Revised DCE sent XEN PBC-1 Peshawar.
No Image
Construction of Bachelor Hostel for Judicial Office
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Karak
30-11--1 30-11--1 - 30-11--1 - 28.433 7.25 19.5 19.5 19.5 16.764 24.014 1.683 94% 84%
May - 2021
Main building - column completed. MB F/Floor plastering in progress.
No Image
Karak
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Kohat
30-11--1 30-11--1 - 30-11--1 - 27.828 0 0 0 0 0 0 27.828 - -
May - 2021
01-Unit Site plan submitted to DSJ for 2 Kanal area on 20-09-20 for approval work not started due to land problem
No Image
Kohat
 
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Malakand
30-11--1 30-11--1 - 30-11--1 - 26.37 4 11.5 11.5 11.5 4.5 8.5 10.87 59% 32%
May - 2021
G/F roof laid Funds amounting to Rs; 15.00 M required.
No Image
Judicial Hostel Malakand
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 25.993 18.881 0 0 0 0 18.881 7.112 - 73%
May - 2021
Gray structure of the building completed. Fixing of washroom tiles is completed. Revised PC-I is submitted for approval to P&D TS Submitted
No Image
Bachelor Hostel for Peshawar
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Provincial
30-11--1 30-11--1 - 30-11--1 - 228.957 87.605 40 40 0 0 87.605 0 - -
May - 2021
No Image
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Swat
30-11--1 30-11--1 - 30-11--1 - 28.946 23.543 6.5 6.5 6.5 0.84 24.383 0 100% 84%
May - 2021
Completed & H/O.
No Image
Swat Pk-05
1167
(OG)
160589-Construction of Bachelor Hostel for Judicial Officers in 08 districts of Khyber Pakhtunkhwa
Tank
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
Not in Umbrella PC-I. PC-I/DCE for Rs.28.468 m sub
No Image
Tank
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Bannu
30-11--1 30-11--1 - 30-11--1 - 20 0 0 0 0 0 0 20 - -
May - 2021
Revenue
No Image
Purchase of furniture and equipment for Judicial C
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Battagram
30-11--1 30-11--1 - 30-11--1 - 4 2.468 3 3 3 0.602 3.07 0 100% 77%
May - 2021
01- Unit Bar room - Finishing Litigant shed - Finishing
No Image
Construction of Bar Room and Litigant Sheds at Judicial
 
Scope of work:
  • civil work
  • Int: Elec:
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Charsadda
30-11--1 30-11--1 - 30-11--1 - 28.903 30.556 0 0 0 0 30.556 0 - 100%
May - 2021
01- Unit Completed & H/O.
No Image
Construction of Lawyer Shed in newly construc
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 21.068 0 10 10 10 0 0 11.068 47% -
May - 2021
01- Unit Works started
No Image
Construction of Single Storey residential apartmen
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 10.219 4.373 12 12 12 2.5 6.873 0 100% 67%
May - 2021
Finishing in progress.
No Image
Construction of Court Rooms in Judiciary Complex a
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Karak
30-11--1 30-11--1 - 30-11--1 - 11.64 5 8.9 8.9 8.9 5.543 10.543 0 100% 91%
May - 2021
02- Nos security Picket 90% completed. Raising of B/Wall 80% completed. Deamnd Rs. 6.6 m for completion.
No Image
1. Raising of B/Wall, Installation of CCTV Cameras & Const: of Security/Sentry Posts in Judical Complex T/Nasaratti Kara? Rs; 7.640 M
2. Const: of Lawyera Shed/Offices & Bathroom at Court Building at Court Building at Tehsil B.D Shah Karak? Rs; 4.00 M
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Kohistan
30-11--1 30-11--1 - 30-11--1 - 18.808 1 14.808 14.808 14.808 4.933 5.933 3 84% 32%
May - 2021
1- Developmntal workb completed? 2- site issues.
No Image
1) Construction of Category-III Residence for Civil Judge Dassu
2 Cosnt: of Bar Room I Litigent Shed of Judical Complex Pattan Lower Kohistan
 
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Mardan
30-11--1 30-11--1 - 30-11--1 - 3.443 2.939 0 0 0 0 2.939 0.504 - 85%
May - 2021
01- Unit Completed & H/O
No Image
Construction of Mosque in Judicial Colony Nowshera
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 250 28.721 9 9 9 4.878 33.599 212.279 15% 13%
May - 2021
Partially completed and occupied. Finishing in progress. Change of scope involved TS Submitted
No Image
Construction of Lawyers Shed at Judicial Complex P
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Provincial
30-11--1 30-11--1 - 30-11--1 - 235.277 139.767 50 50 0 0 139.767 45.51 81% 59%
May - 2021
No Image
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Swabi
30-11--1 30-11--1 - 30-11--1 - 25 2 0 0 0 0 2 23 - 8%
May - 2021
01- Unit Boundary wall in progress. Demarcation in Progress Revenue Deptt: working pending Discussed in Review meeting held on 24-02-2021. Site issue recommended for surrender
No Image
Construction of Boundary Wall and Security Piquet' for Judical Complex Shah Mansoor
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Swat
30-11--1 30-11--1 - 30-11--1 - 42.071 33.939 11 11 11 0.952 34.891 0 100% 83%
May - 2021
6 units - 01 unit - H/O 04 units - Finishing stage. 01 Unit - work in progres 1. Finishing 2. Finishing 3. Finishing 4. Finishing 5. Completed, PC-IV submitted. 6. Main building completed, Security Picquet in progress
No Image
1) Judicial Complex Khwaza Khela Swat. .?. Rs: 2.013 M (TS 1.874)
2) Judicial Complex Matta Swat  .?. Rs: 2.013 M
3) Judicial Complex Kabal Swat  .?. Rs: 2.013 M
4) Judicial Complex Behrain Swat  .?. Rs: 2.013 M
5) Court in Gulkada Swat .?. Rs: 15.12 M (TS 8.55)
6) Mingora Bench Da rul Qaza Swat .?. Rs: 18.899 M (TS 17.646)
 
1168
(OG)
170188-Missing facilities and improvement of infrastructure of existing judicial complexes in Khyber Pakhtunkhwa
Tor Ghar
30-11--1 30-11--1 - 30-11--1 - 9.126 6.517 0 0 0 0 6.517 2.609 - 71%
May - 2021
GF - Completed & H/O.
No Image
Reconstruction of old building and allied offices
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 2.471 3.458 4.89 4.89 4.89 4.677 8.135 0 100% 100%
May - 2021
02- Units 1. Completed 2. AA. Not issued
No Image
1) Land for judicial Complex Langra (Pk37)
2) Additional Itmes in the Allied Buildings at PHC Bench Abbottabad.
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Bannu
30-11--1 30-11--1 - 30-11--1 - 9.8999 1.25 10 10 10 6.46 7.71 0 100% 78%
May - 2021
01-Unit Verandha_I Shuttering for roof completed Verandha_II upto roof level
No Image
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Battagram
30-11--1 30-11--1 - 30-11--1 - 3.56 3.458 11.827 11.827 11.827 1.869 5.327 0 100% 100%
May - 2021
02- Units 1. Completed. 2. 40% work completed
No Image
1 Water supply Tube Well in Session Court
2 Over Head Tank
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Buner
30-11--1 30-11--1 - 30-11--1 - 10.6 1.497 8.31 8.31 8.31 5.349 6.846 0.793 93% 65%
May - 2021
02- Units 1. Completed & H/O 2. Basement RCC wall in progress
No Image
1 Court Rooms and Addl Faciltiies in Buner  Rs: 3.40 M
2 Const: of Library in Buner Rs: 7.200
 
Scope of work:
  • Female Court room
  • Basement Hall
 
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 40.733 4.39 6.803 6.803 6.803 6.53 10.92 29.54 27% 27%
May - 2021
04- Units 1- Completed 2- Completed 3- Work not Started 4- Work not Started
No Image
1) Construction of Motorcycle Shed. .?.. Rs: 2.00 (TS 1.701)
2) Provision of Additoinal & Missing facilities in PHC D.I Khan .?.. Rs: 9.003 (TS 3.390)
3) Constn: of Record Room at PHC D.I Khan Bench. .?.. Rs: 9.730
4) Extension of Bar Roomat PHC D.I Khan Bench .?.. Rs: 20.00
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 5.668 1.25 10.318 10.318 10.318 7.36 8.61 0 100% 100%
May - 2021
Layout given BW in progress.
No Image
Dir Lower
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 11.338 1.25 11.148 11.148 11.148 2.111 3.361 0 100% 30%
May - 2021
02 Units 1 B/wall in progress 70% completed 2 work started work stopped due to snow bond area
No Image
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Haripur
30-11--1 30-11--1 - 30-11--1 - 0 1.25 0 0 0 0 1.25 0 - -
May - 2021
No Image
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Kohistan
30-11--1 30-11--1 - 30-11--1 - 1.5 1.21 0 0 0 0 1.21 0.29 - 81%
May - 2021
Completed & H/O
No Image
Judical Complex in KPK (Dassu)
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Malakand
30-11--1 30-11--1 - 30-11--1 - 14.222 0 14.222 14.222 14.222 6.404 6.404 0 100% 45%
May - 2021
Work on super structure in progress.
No Image
02 Court rooms in Malakand
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Mansehra
30-11--1 30-11--1 - 30-11--1 - 10 0 50 10 10 2.511 0 0
May - 2021
01-Unit Work Started Over Existing Structure.
No Image
Const: of Record Room at Mansehra
 
Scope of work:
  • Record room Single story
  • Record room Double story
 
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Mardan
30-11--1 30-11--1 - 30-11--1 - 0 1.25 0 0 0 0 1.25 0 - -
May - 2021
No Image
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Nowshera
30-11--1 30-11--1 - 30-11--1 - 4.436 0 4.436 4.436 4.436 4.436 4.436 0 100% 100%
May - 2021
01-Unit Completed & H/O
No Image
Library Building in District Courts Nowshera
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 11.168 3 5.548 5.548 5.548 5.548 8.548 2.62 77% 77%
May - 2021
Completed & PC-IV Sub: TS Submitted
No Image
1 Const: of Parking Shed PHC Staff at Peshawar
2 Cnst: of Annexes at Residences of PHC RGC
3 Face Lifting of PHC Building Peshawar
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Provincial
30-11--1 30-11--1 - 30-11--1 - 250 24.144 50 50 0 0 24.144 0 - -
May - 2021
No Image
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Shangla
30-11--1 30-11--1 - 30-11--1 - 3.56 0.912 0.249 0.249 0.249 0.249 1.161 2.399 33% 33%
May - 2021
Completed & H/O Demand Rs: 0.3 M
No Image
Sump Well at Tehsile Court Besham
1169
(OG)
180076-Additional facilities and improvement of infrastructure of existing judicial complexes
Swat
30-11--1 30-11--1 - 30-11--1 - 12.243 0 14.373 14.373 14.373 12.243 0 0
May - 2021
Super Strcture in progress
No Image
Const: of Rooms for High Court Bar/ District Bar Swat
1170
(OG)
190342-Construction of Additional Court Rooms & Missing Facilities on need Basis in District & Tehsil Complexes.
Battagram
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
May - 2021
DCE submitted
No Image
1170
(OG)
190342-Construction of Additional Court Rooms & Missing Facilities on need Basis in District & Tehsil Complexes.
Buner
30-11--1 30-11--1 - 30-11--1 - 30 0 9.342 9.3242 9.342 0 0 20.658 31% -
May - 2021
01- Unit Foundation in progress
No Image
Buner
1170
(OG)
190342-Construction of Additional Court Rooms & Missing Facilities on need Basis in District & Tehsil Complexes.
Chitral Lower
30-11--1 30-11--1 - 30-11--1 Line Deptt 32.497 0 5 5 5 5 5 27.497 15% 15%
May - 2021
03- Units 1. Sub Structure completed 2. Sub Structure completed 3. Sub Structure completed
No Image
  1. Const: Additional Court Room at Chitral
  2. Guard Room at Chitral
  3. Const: of Court Room at Drosh
 
Scope of work:
  • Int: Elec: & Water Supply
  • Main Building G/1st Floor
1170
(OG)
190342-Construction of Additional Court Rooms & Missing Facilities on need Basis in District & Tehsil Complexes.
Chitral Upper
30-11--1 30-11--1 - 30-11--1 Line Deptt 19.45 0 3 3 3 3 3 16.45 15% 15%
May - 2021
03- Units Super Structure in progress
No Image
1 Court Room at Booni
2 Female Litigation Shed at Booni
3 Group Latrine at Booni
1170
(OG)
190342-Construction of Additional Court Rooms & Missing Facilities on need Basis in District & Tehsil Complexes.
Dir Lower
30-11--1 30-11--1 - 30-11--1 Line Deptt 21.941 0 12.668 12.668 12.668 5 5 9.273 58% 23%
May - 2021
06- Units 1. G/F Columns in progress 2. Site not avaible 3. G/F in progress 4. Roof in progress 5. Roofin g in progress 6. 75% Completed
No Image
1 02 Court rooms at Samarbagh
2 02 Court rooms at Chakdara
3 02 Court rooms at Timergara
4 Female Litigant Shed at Samarbagh
5 Chowkdar room at Samarbagh
6 Compound wall at Samarbagh
1170
(OG)
190342-Construction of Additional Court Rooms & Missing Facilities on need Basis in District & Tehsil Complexes.
Haripur
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
May - 2021
No Image
1170
(OG)
190342-Construction of Additional Court Rooms & Missing Facilities on need Basis in District & Tehsil Complexes.
Karak
30-11--1 30-11--1 - 30-11--1 Line Deptt 15.995 0 0 0 0 0 0 15.995 - -
May - 2021
Work order issued to contractor.
No Image
1. Court Room at Banda Duad Shah? Rs;
2. Allied Offices at Banda Daud Shah.?. Rs;
3. Litigant Shed at Banda Daud Shah.?. Rs;
4. Additional Court Room at Karak.?. Rs;
 
1170
(OG)
190342-Construction of Additional Court Rooms & Missing Facilities on need Basis in District & Tehsil Complexes.
Mansehra
30-11--1 30-11--1 - 30-11--1 Line Deptt 62.83 0 8.723 8.723 8.723 0 0 54.107 14% -
May - 2021
01-Unit Work order issued.
No Image
06 Nos Court Rooms at Manshera
 
Scope of work
  • Triple Story Building
  • 02 Nos Courts & Office each story
1170
(OG)
190342-Construction of Additional Court Rooms & Missing Facilities on need Basis in District & Tehsil Complexes.
Provincial
30-11--1 30-11--1 - 30-11--1 - 287.348 0 40 40 0 0 0 0 - -
May - 2021
No Image