1147
(OG)
130581-Addition, Alteration, Strengthening and Balance Works in Judicial Complex, Bannu (Phase-III).
Bannu
30-11--1 30-11--1 - 30-11--1 - 258 233 25 25 25 25 258 0 100% 100%
May - 2021
PC-II: Rs. 10.M on dated: 18-02-13 01-Unit Finishing in progress.
No Image
Bannu
1148
(OG)
130445-Construction of Joint Judicial Complex at Karak and Takhte- Nasrati.
Kohat
30-11--1 30-11--1 - 30-11--1 - 583.853 272.368 40 40 40 39.999 312.367 271.485 54% 54%
May - 2021
B/Wall 40% Completed, M/Blud: Jionery in progress, Judicial Lockup Finihsing, R/Wall 80%, Public Facilitation building in progress
No Image
Karak
1149
(OG)
160445-Construction of Judicial Complex, Kohat at KDA Phase-I
Kohat
30-11--1 30-11--1 - 30-11--1 - 238.341 633.598 37.218 9.305 9.305 9.304 642.902 0 100% 100%
May - 2021
01-Unit MAK consultant for 1. BB Work S/S 85% Completed 2. Completed 3. Plastering & Pointing in Progress 4. Design on B/Wall in progress: TS under preparation
No Image
KDA, Kohat
Scope of work:
  1. Boundary wall 3067 Rft
  2. Tube well boring
  3. Over Head Water Tank 40000 Gallons
  4. Pumping Chamber
  5. Watch Tower
  6. Land Cost: 150 M
1150
(OG)
120419-F/S for Master Planning & Designing of Khyber Pakhtunkhwa Judicial Academy at Regi Model Town Peshawar
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 290 10.002 0.001 0 0 0 10.002 279.997 3% 3%
May - 2021
Procurement stopped till possession of site.
No Image
Peshawar
1151
(OG)
170192-Strengthening of P&D section in Peshawar High Court.
Peshawar
30-11--1 30-11--1 - 30-11--1 - 44.307 0 0 0 0 0 0 0 - -
May - 2021
No Image
1152
(OG)
160444-Reconstruction and Renovation of Judicial Complex Nowshera
Nowshera
30-11--1 30-11--1 - 30-11--1 - 228.661 115.522 63 93.567 93.567 85.483 201.005 50.139 78% 88%
May - 2021
01-Unit Renovation work of 9 court room and allied offices & W/Room completed. Masjid = Roof laid plastering in progress. Civil Judge Residences = Demolution in progess. Establishment Block - GF slab Casted. DFC in CFY
No Image
Judicial Complex Nowshera
1153
(OG)
140294- Construction of Judicial Complex, Mardan
Mardan
30-11--1 30-11--1 - 30-11--1 - 1100 91.751 50 60 60 38.739 130.49 958.249 13% 12%
May - 2021
FF florring in progress, B/wall in progress, Judges aprtments G/F plastering in progress F/F plastering in progress Plinth level Work in super strcture
No Image
Mardan
1154
(OG)
180609-Additional Funds for acquisition of land for the construction of judicial complexes at sub divisional Behrain,Khwazakhela and Matta District Swat
Swat
30-11--1 30-11--1 - 30-11--1 - 208.009 141.053 66.956 66.956 66.956 66.463 207.516 0 100% 100%
May - 2021
Behran land acquistion completed.
No Image
swat
1155
(OG)
120004-Construction of Judicial Complex, Chitral.
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 930.934 271.45 50 130 130 129.999 401.449 609.484 35% 43%
May - 2021
Package I 33 % Package II 40 % Package III 41 % Pacakge IV 08 %
No Image
Judicial Complex, Chitral.
 
Scope of work:
  • Main Building
  • High Court Block Building
  • Judicial Lodge (03 Nos)
  • Staff Accommodation
  • Judicial Lock up building
  • Parking Basement
  • Lav: Block
  • Watch Tower 06 Nos
  • Guard Room
1156
(OG)
100425-Construction of Judicial Complex, Mansehra.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 972.98 434.001 5 0 0 0 434.001 533.979 45% 45%
May - 2021
Drawing / Desing prepared by Mindheart Consultant and District & Session Judge Mansehra asked for fixed the date for presentation by Mindheard Consultant. Land Payment made to DC / Land Acquisition Collector Mansehra. Revised DCE submitted to P&D.
No Image
Judicial Complex, Mansehra PK-31 (boundary wall/civil work/developmental work OHT/trial drilling/coversion into tube well)
1157
(OG)
140307-F/S & Master Planning and Detailed Designing of Judicial Complex, Abbottabad
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 773.785 72.746 45 110.44 110.44 74.823 147.569 656.039 15% 19%
May - 2021
01-Unit Record room completed. Foundation in progress.
No Image
Abbottabad
1158
(OG)
170190-Repair and extension of Judicial Lodge at Nathiagali
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 62.013 17.655 56.642 30.143 30.143 17.268 34.923 0 100% 56%
May - 2021
01-Unit Water tank completed Developmental work in progress. Scheme TF to Nest FY
No Image
Nathiagali, Abbottabad
1159
(OG)
110457-Construction of Judicial Complex and Construction of Lawyers shed in Judicial Complex, Haripur
Haripur
30-11--1 30-11--1 - 30-11--1 - 859 747.788 40 59.276 59.276 45.05 792.838 71.212 92% 92%
May - 2021
Main building, bar room, 90% completed. Balance work in progress.
No Image
Judicial Complex Haripur
1160
(OG)
130446-F/S for Assessment of Residential Requirements, Master Planning & Designing of Judicial Complexes in Selected Districts of Khyber Pakhtunkhwa
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 281.386 44.783 23.94 41.94 41.94 28.799 73.582 212.663 24% 26%
May - 2021
01- Unit 1st floor roof laid. S/structure in progress
No Image
Construction of Residences for Ditrict Judicairy Abbottabad.
 
Scope of work:
  • Appts (12 Nos) in 3 Block
  • OHT
  • Residence (08 Nos)
1160
(OG)
130446-F/S for Assessment of Residential Requirements, Master Planning & Designing of Judicial Complexes in Selected Districts of Khyber Pakhtunkhwa
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 103.282 20.925 26.95 26.95 26.95 6.117 27.042 55.407 46% 26%
May - 2021
01- Unit Bachelor hostel - completed. FF in progress.
No Image
Construction of residences for Judicial Officers
 
Scope of work:
  • M/B G/F 1st Floor Hostel
  • B/Wall
  • Dev: Work
  • Bangalow
1160
(OG)
130446-F/S for Assessment of Residential Requirements, Master Planning & Designing of Judicial Complexes in Selected Districts of Khyber Pakhtunkhwa
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 449.286 0 0 0 0 0 0 449.286 - -
May - 2021
Residences - complted lodges - Finsihing in progres. Type 4 quarter - Site not yet handed over
No Image
Construction of Tehsil Judicial Complex Parov
1160
(OG)
130446-F/S for Assessment of Residential Requirements, Master Planning & Designing of Judicial Complexes in Selected Districts of Khyber Pakhtunkhwa
Haripur
30-11--1 30-11--1 - 30-11--1 - 94.104 31.373 51.607 51.607 51.607 27.31 58.683 11.124 88% 62%
May - 2021
4- Units 2 - Finishing in progress. 2- work in progress.
No Image
Residences and allied facilities for Judicial Offi
1160
(OG)
130446-F/S for Assessment of Residential Requirements, Master Planning & Designing of Judicial Complexes in Selected Districts of Khyber Pakhtunkhwa
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 0 3.632 0 0 0 0 3.632 0 -
May - 2021
No Image
Residences and allied facilities for Judicial Offi
1160
(OG)
130446-F/S for Assessment of Residential Requirements, Master Planning & Designing of Judicial Complexes in Selected Districts of Khyber Pakhtunkhwa
Provincial
30-11--1 30-11--1 - 30-11--1 - 1469.574 101.032 35 35 0 0 101.032 1333.542 9% 7%
May - 2021
No Image
1160
(OG)
130446-F/S for Assessment of Residential Requirements, Master Planning & Designing of Judicial Complexes in Selected Districts of Khyber Pakhtunkhwa
Swat
30-11--1 30-11--1 - 30-11--1 - 342.221 0 6 6 6 6 6 336.221 2% 2%
May - 2021
Layout Given
No Image
Construction of Judicial Complex at Behrain Swat
1161
(OG)
130447-F/S for Assessment of Residential Requirements of Honorable Judges of PHC.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
No Image
Abbottabad
1161
(OG)
130447-F/S for Assessment of Residential Requirements of Honorable Judges of PHC.
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 173.389 39.866 18 28.445 28.445 28.445 68.311 115.523 33% 39%
May - 2021
03- Units 1 Finihsing 2 H/O 3 Site not identified
No Image
1 Construction of lodges(3 Nos)
2 A.R Reisence (1 No)
3 Type IV Qtrs (5 Nos)
1161
(OG)
130447-F/S for Assessment of Residential Requirements of Honorable Judges of PHC.
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 -
May - 2021
No Image
1161
(OG)
130447-F/S for Assessment of Residential Requirements of Honorable Judges of PHC.
Provincial
30-11--1 30-11--1 - 30-11--1 - 173.398 41.25 20 20 0 0 41.25 0 - -
May - 2021
No Image
1162
(OG)
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu)
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 146.949 61.465 42.233 42.233 42.233 30.5 91.965 43.251 71% 63%
May - 2021
01- Unit 1st floor roof laid. Finishing in progress Foundation in progress Completed
No Image
Havelian
 
Scope of work:
  • Main Building 
  • Residence (01 No) 
  • Tube well
  • OHT
  • B/Wall 
1162
(OG)
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu)
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 332.616 262.667 86.595 86.595 86.595 82.138 344.805 0 100% 100%
May - 2021
02 units 1 Compelted & Occupied 2 Main building completed & occupied
No Image
1) Tehsil Daraban .?.. Rs: 144.035 (TS 131.816)
2) Tehsil Paharpur .?.. Rs: 188.581  (TS 188.581)
1162
(OG)
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu)
Hangu
30-11--1 30-11--1 - 30-11--1 - 236.698 55.83 29.771 29.771 29.771 14.75 70.58 151.097 36% 30%
May - 2021
01- Unit Main building - in progress. BW 90% completed. Demand Rs. 30 M
No Image
Judicial Complex at Hangu
 
Scope of work:
  • Tube well
  • B/Wall
  • Sec. Public Bldg
  • Public Toilet
  • Litigated 4F + F/F
  • Judge Residence Strcture
  • 08 Nos Courts rooms, record rooms and cafeteria
  • Total Area: 32 Kanal
1162
(OG)
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu)
Mansehra
30-11--1 30-11--1 - 30-11--1 - 112.251 22.561 21.375 21.375 21.375 3.873 26.434 68.315 39% 24%
May - 2021
01- Unit Main Building = G/Floor Super Structure in Progress. Developmental Work in Progress. Boundary Wall in Progress.
No Image
Tehsil Judicial Complex, Oghi Manshera
1162
(OG)
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu)
Provincial
30-11--1 30-11--1 - 30-11--1 - 914.988 413.492 55 55 0 0 413.492 0 - -
May - 2021
No Image
1163
(OG)
140300-F/S and Construction of Hostel with Allied Facilities in Khyber Pakhtunkhwa Judicial Academy
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 229.81 192.934 8.178 8.178 8.178 8.178 201.112 28.698 88% 88%
May - 2021
Complted PC-IV Sub:
No Image
1. Male Hostel
2. Female Hostel
3. Developmental Works
1163
(OG)
140300-F/S and Construction of Hostel with Allied Facilities in Khyber Pakhtunkhwa Judicial Academy
Provincial
30-11--1 30-11--1 - 30-11--1 - 229.81 217.31 5 5 0 0 217.31 0 - -
May - 2021
Presentation to CJ Peshawar HC on 22/05/2015.
No Image
1164
(OG)
140301-F/S & Master Planning for Construction of "Model Anti Terrorism Courts"
Mardan
30-11--1 30-11--1 - 30-11--1 - 250 96.851 52 52 52 42.395 139.246 101.149 60% 56%
May - 2021
01 Unit G/F Building flooring in progress F/F flooring in progress B/wall 80% completed
No Image
Mardan
1164
(OG)
140301-F/S & Master Planning for Construction of "Model Anti Terrorism Courts"
Peshawar
MPD-1
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
PC-II approved for Rs.10 m on 27/04/2015. Scope of
No Image
Peshawar
1164
(OG)
140301-F/S & Master Planning for Construction of "Model Anti Terrorism Courts"
Provincial
30-11--1 30-11--1 - 30-11--1 - 247 96.85201 50 50 0 0 96.85201 0 - -
May - 2021
No Image
1165
(OG)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand),Thall (Hangu),Shabqadar (Charsadda),Tank &Totalai (Buner).
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 149.171 0 21.999 21.999 21.999 21.999 21.999 127.172 15% 15%
May - 2021
01-Unit M/B DPC level B/Wall 25% Completed Dev: work 50% Completed Deamnd rs: 20 M
No Image
Totalai Buner
 
Scope of work:
  • Court rooms
  • Residence
  • Lawyers Shed
  • Offices & Lockups
  • Public Facilitation Centre/Guest Room
  • Dev: work
1165
(OG)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand),Thall (Hangu),Shabqadar (Charsadda),Tank &Totalai (Buner).
Charsadda
30-11--1 30-11--1 - 30-11--1 Line Deptt 129.798 12 19 19 19 18.999 30.999 98.798 24% 24%
May - 2021
01- Unit Foundation in progress M/B in progress
No Image
Judical Complex Tangi Charsadda
1165
(OG)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand),Thall (Hangu),Shabqadar (Charsadda),Tank &Totalai (Buner).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 0 0 0 0 0 0 0 0 - -
May - 2021
PC-I under preparation (XEN Charssada focal person
No Image
DI.Khan
1165
(OG)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand),Thall (Hangu),Shabqadar (Charsadda),Tank &Totalai (Buner).
Hangu
30-11--1 30-11--1 - 30-11--1 Line Deptt 97.632 16.339 22.125 22.125 22.125 17.124 33.463 59.168 39% 34%
May - 2021
01- Unit B/W 510 Rft 90% completed. Markaz /Lawyer shed upto lintel level. Litigation Foundation excavation completed. Court Room Excavation completed. Demand Rs: 30 M
No Image
Judicial Complex at Thall Hangu
 
Scope of work:
  • Court Room
  • Offices & Lock up
  • Judges Bunglow
  • B/Wall
  • Markaz & Lawyer Shed
 
1165
(OG)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand),Thall (Hangu),Shabqadar (Charsadda),Tank &Totalai (Buner).
Malakand
30-11--1 30-11--1 - 30-11--1 Line Deptt 154.371 0 10.8 10.8 10.8 10.8 10.8 143.571 7% 7%
May - 2021
B/Wall Completed upto DPC level Funds amounting to Rs: 25.00 M required
No Image
Judicail Complex at Dargai Malakand
1165
(OG)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand),Thall (Hangu),Shabqadar (Charsadda),Tank &Totalai (Buner).
Provincial
30-11--1 30-11--1 - 30-11--1 - 613.908 19.18 45 45 0 0 19.18 0 - -
May - 2021
No Image
1165
(OG)
160182-F/S for Establishment of Judicial Complex at Dargai (Malakand),Thall (Hangu),Shabqadar (Charsadda),Tank &Totalai (Buner).
Tank
30-11--1 30-11--1 - 30-11--1 Line Deptt 82.936 0 0 0 0 0 0 82.936 - -
May - 2021
B/Wall Completed
No Image
Tank
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Battagram
30-11--1 30-11--1 - 30-11--1 - 66.824 0 0 0 0 0 0 66.824 - -
May - 2021
Approved.
No Image
Acquisition of land for Tehsil Judicial Complex at
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Buner
30-11--1 30-11--1 - 30-11--1 - 27.331 0 0 0 0 0 0 27.331 - -
May - 2021
Approved.
No Image
1) Acquisition of land for Tehsil Judicial Complex
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Charsadda
30-11--1 30-11--1 - 30-11--1 - 45.073 0 0 0 0 0 0 45.073 - -
May - 2021
Approved.
No Image
Acquisition of additional land for Tehsil Judicial
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 39.292 43.088 0 0 0 0 43.088 0 - 100%
May - 2021
Land payment made to DC. Completed.
No Image
Acquisition of additional land for District Judici
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
Land Payment made to DC
No Image
Acquisition of land for Tehsil Judicial Complex at
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 3.3 0 0 0 0 0 0 3.3 - -
May - 2021
Approved.
No Image
Acquisition of land for Tehsil Judicial Complex Wa
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Kohistan
30-11--1 30-11--1 - 30-11--1 - 11.6 0 0 0 0 0 0 11.6 - -
May - 2021
Approved.
No Image
Extension of Judicial Complex Kohistan at Dassu
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Mansehra
30-11--1 30-11--1 - 30-11--1 - 72.515 71.895 0.237 0.237 0.237 0 71.895 0.383 99% 99%
May - 2021
02- Units Land payment made.
No Image
1. Acquisition of land for construction of Tehsil Judicial Complex at Balakot
2. Acquisition of land for construction of Tehsil Judicial Complex at Oghi (Balance work)
1166
(OG)
160537-Acquisition of land for construction of Judicial Complexes on need basis
Provincial
30-11--1 30-11--1 - 30-11--1 - 45.073 244.165 0 0 0 0 244.165 0 - 100%
May - 2021
Approved.
No Image
Acquisition of additional land for Tehsil Judicial
Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69