Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1011 (OG) |
140807-F/S and Dev. of Police Infrastructure in Khyber Pakhtunkhwa (Police Station at Kabalgram, Chauga, Olandar, Dandai District Shangla,Swari at District Buner, Gawaleri and Gat-Poechar at District Swat, Kuz Paro at District Kohistan) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 345 | 197.43 | 55 | 55 | 0 | 0 | 197.43 | 0 | - |
- May - 2021 |
No Image | |
1012 (OG) |
160133-F/S and Strenthening of Police Infrastructure in Khyber Pakhtunkhwa |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 425.02 | 82.686 | 55 | 55 | 0 | 0 | 82.686 | 0 | - |
- May - 2021 |
PC-II for Rs.30 m approved in DDWP on 07/09/2016. |
No Image |
1013 (OG) |
160542-F/S and Construction of Model Police Station at each Tehsil & Town Headquarter of Khyber Pakhtunkhwa (13 No.) (Phase-I). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 607.405 | 198.933 | 127.35 | 127.35 | 0 | 0 | 198.933 | 0 | - |
- May - 2021 |
PC-II for Rs.50 m approved in DDWP on 07/09/2016. |
No Image |
1014 (OG) |
160544-F/S and Construction of Regional Headquarters for Counter Terrorism |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 660.594 | 216.31 | 65 | 65 | 0 | 0 | 216.31 | 0 | - |
- May - 2021 |
No Image | |
1015 (OG) |
190432-Refurbishment of existing Police Station and construction of new Police Stations |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 145.215 | 0 | 25 | 25 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
1016 (New) |
200162-Establishment of Police Post at Tehkal, Peshawar |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 25 | 0 | 5 | 5 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
1017 (New) |
190142-E-Enablement of Special Branch Phase-II |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 109.809 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
1018 (New) |
200123-F/S & Construction of Police Stations and Police Posts in Malakand Division |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 450 | 0 | 10 | 10 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
1019 (OG) |
150272-Feasibilty Study and Construction of Central Prison D.I.Khan on existing Site (Phase-II) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 812.996 | 0 | 100 | 50 | 50 | 28.537 | 0 | 0 |
May - 2021 |
Male section, female section, common building in progress.
Demanded Rs. 100 M for The tempo of the work |
No Image | |
DI.Khan | |||||||||||||||||||
1020 (OG) |
170041-Establishment of Planning and Monitoring Cell at Inspectorate General of Prisons, Khyber Pakhtunkhwa. |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 31.606 | 22 | 0 | 0 | 0 | 0 | 22 | 0 | - |
- May - 2021 |
No Image | |
1021 (OG) |
120189-Construction of District Jail Swabi. (Phase-II) |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1398 | 218 | 140 | 140 | 140 | 105 | 323 | 1040 | 26% |
23% May - 2021 |
Work in progress on all units.
Demand Rs: 100 M (LAIBLITY) |
No Image |
District Jail Swabi | |||||||||||||||||||
1022 (OG) |
140132-Re-Construction of District Jail Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 707 | 334.399 | 150 | 190 | 190 | 109.626 | 444.025 | 222.601 | 69% |
63% May - 2021 |
Adminstration Block - Completed
Hospital Block - Completed
Head Wardan Office - Completed
Juvenile prisoners Block - Completed
Female prionser Block - Completed
Presioner Cock House - Completed
Class-12 prsioners Barrack - Completed
Under trail prsioners Barrack - Completed
Convicted Prionsers Barrack - F/F slab laid
Condemned prisoners Barrack - G/F in progress
Staff residence apartment Block-I - plastering in progress
Staff residence apartment Block-II - F/F slab laid
Mosque Super Strcture in progress
Main Enterance/ Reception - 95% completed
Dev: work in progress |
No Image |
1. Civil Package-I
2. Civil Package-II
3. Consultancy
4. UET Peshawar
5. WAPDA | |||||||||||||||||||
1023 (OG) |
180036-Construction of Hostel for trainees at Central Prison Haripur (Balance Work). |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 71.913 | 30.272 | 36.913 | 36.913 | 18.457 | 18.467 | 48.739 | 4.728 | 93% |
68% May - 2021 |
Balance - work in progress. |
No Image |
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 62.376 | 16.281 | 16.281 | 16.281 | 16.281 | 78.657 | 0 | 100% |
100% May - 2021 |
01- Unit
Completed & H/O |
No Image |
Sub Jail Charsadda.
| |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 3.193 | 0 | 0 | 0 | 0 | 3.193 | 0 | - |
100% May - 2021 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% May - 2021 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% May - 2021 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 28.6 | 0 | 0 | 0 | 0 | 28.6 | 0.002 | - |
100% May - 2021 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak
Scope of work:
| |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 105.337 | 75.307 | 29.734 | 29.734 | 29.734 | 25.456 | 100.763 | 0.296 | 100% |
96% May - 2021 |
08 Units
1. Finishing
2. Finishing
3. Work not started
4. Finishing
5. Foundation in progress
6. 05 Nos Barracks for security staff completed
7. Work not started
8. Finishing
TS for Rs. 105.337 M submitted to SE |
No Image |
District Jail Kohat (5 Nos Barracks 95 x 20)
| |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 26.734 | 1.99 | 10 | 10 | 10 | 2.846 | 4.836 | 14.744 | 45% |
18% May - 2021 |
01- Unit
Tube well bore & Overhead tank completed.
Pumping Chamber & Bath room Completed
Kitchen in progress |
No Image |
Improvement of District Jail Lakki Marwat PK-91
Scope of work:
| |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Malakand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 9.999 | 9.35 | 0 | 0 | 0 | 0 | 9.35 | 0.649 | - |
94% May - 2021 |
Completed & Handed over |
No Image |
Sub Jail Malakand | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 26.123 | 24.485 | 1.25 | 1.25 | 1.25 | 1.25 | 25.735 | 0.388 | 99% |
99% May - 2021 |
01- Unit
1- Original Scope of work Completed.
2- Additional Work in Progress. (i) Intersection wall Completed. (ii) External Water Supply Completed. (iii) Inter Sector B/Wall Completed.
(iv) Sewerage Line Completed. |
No Image |
District Jail Manshra PK-31 (barracks)
Scope of work:
Orginal Scope
Add: work
| |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 410.019 | 309.875 | 100.144 | 100.144 | 0 | 0 | 309.875 | 0 | - |
- May - 2021 |
No Image | |
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.295 | 5.294 | 0 | 0 | 0 | 0 | 5.294 | 0.001 | - |
100% May - 2021 |
01- Unit
Completed & H/O. |
No Image |
District Jail Swabi PK-44 | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Tank |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.878 | 5.878 | 0 | 0 | 0 | 0 | 5.878 | 0 | - |
100% May - 2021 |
Completed & H/O. |
No Image |
Judicial Lockup Tank | |||||||||||||||||||
1025 (OG) |
140205-F/S & Construction of Admin Blocks and Barracks for Watch & Ward staff in central Jails of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 152.549 | 47.798 | 58.553 | 58.553 | 58.553 | 32.01 | 79.808 | 46.198 | 70% |
52% May - 2021 |
01-Unit
GF - Slab in progress.
Barrack GF Shitring in progress Admin block not yet started |
No Image |
Scope of work:
| |||||||||||||||||||
1025 (OG) |
140205-F/S & Construction of Admin Blocks and Barracks for Watch & Ward staff in central Jails of Khyber Pakhtunkhwa. |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 152.728 | 105.5 | 35.454 | 35.454 | 35.454 | 31.41 | 136.91 | 11.774 | 92% |
90% May - 2021 |
01- Unit
Finishing in progress. |
No Image |
Scope of work:
| |||||||||||||||||||
1025 (OG) |
140205-F/S & Construction of Admin Blocks and Barracks for Watch & Ward staff in central Jails of Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 123.961 | 99.522 | 15 | 15 | 15 | 8.631 | 108.153 | 9.439 | 92% |
87% May - 2021 |
Barrak, Admin block - Plaster in progress. |
No Image |
Central Prison Haripur | |||||||||||||||||||
1025 (OG) |
140205-F/S & Construction of Admin Blocks and Barracks for Watch & Ward staff in central Jails of Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 450.7 | 224.819 | 129.817 | 129.817 | 0 | 0 | 224.819 | 96.064 | 79% |
50% May - 2021 |
No Image | |
1026 (OG) |
160129-Re-construction of the damaged Prisons due to 26 th October 2015 earthquake in Khyber Paktunkhwa. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 6.548 | 4.834 | 0 | 0 | 0 | 0 | 4.834 | 1.714 | - |
74% May - 2021 |
01-Unit
Completed & PC-IV Sub: |
No Image |
District Jail Buner
Scope of work:
B/Wall
Repair of Jail Barracks | |||||||||||||||||||
1026 (OG) |
160129-Re-construction of the damaged Prisons due to 26 th October 2015 earthquake in Khyber Paktunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.509 | 19.215 | 0 | 0 | 0 | 0 | 19.215 | 2.294 | - |
89% May - 2021 |
Completed & Pc-IV submitted to supdt: Jail. |
No Image |
District Jail Timergara | |||||||||||||||||||
1026 (OG) |
160129-Re-construction of the damaged Prisons due to 26 th October 2015 earthquake in Khyber Paktunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 5.335 | 5.335 | 0 | 0 | 0 | 0 | 5.335 | 0 | - |
100% May - 2021 |
Completed. |
No Image |
Central Prison Haripur | |||||||||||||||||||
1026 (OG) |
160129-Re-construction of the damaged Prisons due to 26 th October 2015 earthquake in Khyber Paktunkhwa. |
Kohistan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1.396 | 1.145 | 0.103 | 0.103 | 0.103 | 0 | 1.145 | 0.148 | 89% |
82% May - 2021 |
Repair nature - work in progress. |
No Image |
Sub Jail Dassu Kohistan | |||||||||||||||||||
1026 (OG) |
160129-Re-construction of the damaged Prisons due to 26 th October 2015 earthquake in Khyber Paktunkhwa. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 122.233 | 98.61 | 13.516 | 13.516 | 13.516 | 10.576 | 109.186 | 10.107 | 92% |
89% May - 2021 |
01- Unit
A (03 Nos Barrack)
Roof Laid Finishing in Progress. B (03 Nos. Barracks)
Roof Laid. |
No Image |
District Jail, Mansehra
Scope of work:
| |||||||||||||||||||
1026 (OG) |
160129-Re-construction of the damaged Prisons due to 26 th October 2015 earthquake in Khyber Paktunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.114 | 140.861 | 14.238 | 14.238 | 0 | 0 | 140.861 | 0 | 100% |
100% May - 2021 |
No Image | |
1027 (New) |
170039-Feasibility Study, Planning, Designing and Construction of Central Prison Peshawar (Phase-II).(PC-II approved on 24-08-2017) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0.001 | 0 | 0 | 0 | 0 | 0 |
- May - 2021 |
PC-II for Rs.50 M approved on 12/09/2017 . Revised PC-I/DCE on MRS-2020 sent to IG Prison KP on 19/08/20.
A.A awaited |
No Image | |
Peshawar | |||||||||||||||||||
1028 (New) |
200032-Security Enhancement of Central prison, Mardan |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 68.813 | 0 | 0.001 | 5 | 5 | 0 | 0 | 68.812 | 0% |
- May - 2021 |
Tendering in progress. |
No Image |
1029 (New) |
150278-Feasibility Study & Construction of central prison Malakand.(PC-II approved on 18-04-2018) |
Malakand |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 25 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
PC-II approved for Rs: 25.00 M
PC-I/DCE submitted to I.G Prisons KP. Pre PDWP held observation cleared on dated: 06-10-20 |
No Image |
District Jail Malakand | |||||||||||||||||||
1030 (New) |
180090-Feasibility Study for Prison Industries and Skill Development of Prisoners.(Rule of Law Road map) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 50 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
1031 (OG) |
191154-180126 - Construction of Levy Check Post in District Khyber . [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.5 | 11.981 | 7.519 | 7.519 | 7.519 | 4.035 | 16.016 | 0 | 100% |
82% May - 2021 |
3- Units
1- Finishing in progress.
2- Upto lintel level.
3- Work stopped due to local dispute. |
No Image |
1- Lala Kandaw Jamrud.
2- Landi Kotal Bypass road.
3- Kala Khel Bara.
| |||||||||||||||||||
1032 (OG) |
191586-180582 - De-Radicalization/Rehabilitation Center in Tribal Districts. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 776.984 | 350.32 | 0 | 0 | 0 | 0 | 350.32 | 0 | - |
- May - 2021 |
No Image | |
1033 (OG) |
191588-030435-Creation of Crisis Management Cell in FATA Secretariat. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 135.435 | 115.435 | 0 | 0 | 0 | 0 | 115.435 | 0 | - |
- May - 2021 |
No Image | |
1039 (OG) |
191134-140384-Reconstruction of 24 Nos. Levy Picquets from Khajori to Miranshah in NWA. (Revised) [MA] |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 159.12 | 120.132 | 25.637 | 20.197 | 20.197 | 11.553 | 131.685 | 13.351 | 92% |
83% May - 2021 |
35- Units
completed =18
Remaining in progress.
Cannot be completed due to dispute on 04 units./ |
No Image |
1 Gora Qabristan Miran Shah
2 Chashma Bridge Miran Shah
3 M. Alam Jan Shaheeh Cheshma
4 Chashma II Miran Shah
5 Qutab Khel I
6 Qutab Khel II (On top of Hill)
7 Isha I
8 Isha II
9 Tapi Pir Kala
10 Aman Ullah Shaheed
11 Nowrak I
12 Nawab
13 Sarwargai
14 Aslam Picqut
15 Eidak Bridge
16 Khadi BY Pass
17 Mirashom
18 Karam Kot
19 Machi Khel Bye Pass
20 Essory
21 Jamal Azmat
22 EEPI Mirali
23 Kajori Bridge
24 Levy Picquet GHK 1
25 Levy Picquet GHK 2
26 Levy Picquet GHK 3
27 Levy Picquet GHK 4
28 Levy Picquet Eidgah
29 Levy Picquet Danday Darpa Khel
30 01 No Boye Bridge
31 01 No Thall
32 Levy Picquet 1 (Spinwam upto Bobali)
33 Levy Picquet 2 (Spinwam upo Bobali)
34 Levy Picquet Kam Sarobi
35 Levy Picquet Sara Obbo Dangin | |||||||||||||||||||
1040 (OG) |
191136-180340 - Construction of Levies piquets in District North Waziristan. [MA] |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 45.021 | 16.021 | 34 | 25.99 | 25.99 | 7.723 | 23.744 | 0 | 100% |
53% May - 2021 |
07- Units
03 units disputed.
04- Units in progress.
Cannot be completed due to dispute on 03 units./ |
No Image |
1 Levy Picquet Shan Khura
2 Levy Picquet Babari Adda
3 Levy Picquet Ahmad Khel
4 01 No Levy Picquet at Ghulam Khan
5 Hassan Khel Titi Maddda
6 Hassan Khel Patti Khel
7 Hassan Khel Dir Noomi | |||||||||||||||||||
1041 (OG) |
191138-180458 - Improvement & Rehab of Existing Levies Picquets in District Kurram. [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.384 | 51.524 | 46.6 | 29.712 | 29.712 | 25.741 | 77.265 | 0 | 100% |
100% May - 2021 |
08- Units
1. Finishing in progress
2. Finishing in progress
3. Finishing in progress
4. Finishing in progress
5. Finishing in progress
6. Finishing in progress
7. Completed
8. H/O |
No Image |
1 Badama Kirman
2 Sheen Khwar
3 Dago Levey Picket
4 Pasta Shaga
5 Gavi Picket
6 Gido UK
7 Kahari Picket
8 Balaishkel
| |||||||||||||||||||
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 9.335 | 9.335 | 0 | 53.31 | 0 | 100% |
82% May - 2021 |
13 Units
1 work in porgress
2 Super structure
3 Finishing
4 Finishing
5 Finishing
6 Finishing
7 Finishing
8 Finishing
9 Finishing
10 Finishing
11 Finishing
12 Finishing
13 Finishing |
No Image |
Upper orakzai
1) Neerak A Khel ? Rs: 5.00 M
2) Bridge Ghozogda ? Rs: 5.00 M
3) Banda Mamozai Khyber Border ? Rs: 5.00 M
4) Tango Ali Zherzai Kurram Agency ? Rs: 5.00 M
5) Owl Kurram Agency Border ? Rs: 5.00 M
LOWER ORAKZAI
1) Oblan ? Rs: 5.00 M
2) Chapri Feroz Khel ? Rs: 5.00 M
3) Dbo Ghakhi ? Rs: 5.00 M
4) Sra Khawara Spoya ? Rs: 5.00 M
5) Mandara Khel ? Rs: 5.00 M
6) KandiMishti Sampog area. ? Rs: 5.00 M
7) Wam Pange near GMS ? Rs: 5.00 M
8) Ghuzdara Stori Khel ? Rs: 5.00 M | |||||||||||||||||||
1043 (OG) |
191122-170374-M&R / Rehabilitation / Reconstruction and Construction of Levis/Khassadars Picquets in Mohmand Agency. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 92.173 | 28.023 | 62.276 | 45.946 | 45.946 | 4.509 | 32.532 | 1.874 | 98% |
35% May - 2021 |
07- Packages
51- Units
work in progress.
02/07 Packages cannot be started due no body participated in tender
Revised esitamate submitted under process |
No Image |
Package I (17 units)
Package II (18 Units)
Package III (07 Units)
Package IV (09 Units)
Package V (07 Units)
Package VI (06 Units)
Package VII (03 Units)
Scope of work:
| |||||||||||||||||||
1044 (OG) |
191132-150050-Construction of Picquets and Additional Rooms in Existing Security Picquets/Check Posts in Different Areas of Mohmand Agency. (Revised) [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 120.346 | 98.541 | 21.805 | 18.462 | 18.462 | 0 | 98.541 | 0 | 100% |
82% May - 2021 |
all components completed
03 units under dispute all the released amount has been surrendered |
No Image |
1 Tehsil Halimzai
2 Tehsil Safi
3 Tehsil Khwezai
4 Tehsil Bazai
5 Lower Sub Division Tehsil Ekka Ghund
6 Tehsil Prang Ghar
7 Tehsil Pindiali
Scope of work:
| |||||||||||||||||||
1045 (OG) |
191141-180251 - Construction of Levy Picquets in District Mohmand . [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.021 | 8 | 13.021 | 11.039 | 11.039 | 0 | 8 | 0 | 100% |
38% May - 2021 |
04- Units
1. Roof level
2. Flooring
3. Layout Given
4. Layout given |
No Image |
1 Picquet at Ambar Aras
2 Picquet at Kamali Hamlizai
3 Picquet at Baizai Area
4 Picquet at Spinki Tangi at Bazar | |||||||||||||||||||
1046 (OG) |
191131-170016-Construction / Maintenance & Rehabilitation of Levis / Khassadar Picquets in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.655 | 42.655 | 41 | 30.312 | 30.312 | 8.371 | 51.026 | 5 | 94% |
58% May - 2021 |
16- Units
1. FInishing
2. H/O
3. Roofing
4. Land not avaible
5. Land not avaible
6. Roof laid
7. Land not avaible
8. Land not avaible
9. S/Str in progress
10. H/O
11. H/O
12. H/O
13. H/O
14. H/O
15. H/O
16. H/O |
No Image |
1 Khasadar Picquet at Skindaro Hayati
2 Khasadar Picquet at Batwar Salarzai
3 Khasadar Picquet at Khar Bazar
4 Khasadar Picquet at Hayati GO Kandow
5 Khasadar Picquet at Khan Dheri
6Khasadar Picquet at Ghakhi Nakhtar
7 Khasadar Picquet at Mukha Khawar Mamud
8 Khasadar Picquet at Loe Kharki
9 Khasadar Picquet at Hilal Khel
10 Khasadar Picquet at Jangazai Mamund
11 Khasadar Picquet at Raghagan Bazar
12 Khasadar Picquet at Mir Khan ARang
13 Khasadar Picquet Tawheed Abad
14 Khasadar Picquet Seri Sar Sharbati
15 Khasadar Picquet Pashat Salarzai
16 Khasadar Picquet Tarkho Mamund | |||||||||||||||||||