Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
705 (OG) |
191439-180307 - Afforestation over waste community lands in Sub-Division Peshawar. [MA] |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 45 | 3.82 | 0 | 0 | 0 | 0 | 3.82 | 0 | - |
- May - 2021 |
No Image | |
706 (OG) |
191460-170205 - Plantation of Fruit and Forest Trees Species in FR Peshawar [MA] |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 27 | 13.313 | 0 | 0 | 0 | 0 | 13.313 | 0 | - |
- May - 2021 |
No Image | |
707 (OG) |
191486-190273 -Biodiversity Research Initiatives in Merged Areas of Khyber Pakhtunkhwa . [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 44 | 4 | 0 | 0 | 0 | 0 | 4 | 0 | - |
- May - 2021 |
No Image | |
708 (OG) |
191436-180277 - Livelihood Improvement through NTFP activities in District South Waziristan. [MA] |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.137 | 0 | 0 | 0 | 0 | 3.137 | 0 | - |
- May - 2021 |
No Image | |
709 (OG) |
191489-190343 - Promotion of NTFPs in Merged Areas (South). [MA] |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 62.645 | 2.5 | 0 | 0 | 0 | 0 | 2.5 | 0 | - |
- May - 2021 |
No Image | |
710 (OG) |
191487-180345 - Poverty Reduction Through NTFP Activities in District North Waziristan. [MA] |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 8 | 1.882 | 0 | 0 | 0 | 0 | 1.882 | 0 | - |
- May - 2021 |
No Image | |
711 (OG) |
191488-190270 - Promotion of NTFPs in Merged Areas (North). [MA] |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 63.606 | 2.5 | 0 | 0 | 0 | 0 | 2.5 | 0 | - |
- May - 2021 |
No Image | |
712 (OG) |
191421-180545 - Development of NTFP activities in District Kurram. [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 18 | 0.764 | 0 | 0 | 0 | 0 | 0.764 | 0 | - |
- May - 2021 |
No Image | |
713 (OG) |
191430-180053 - Development of NTFP in District Orakzai. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 1.882 | 0 | 0 | 0 | 0 | 1.882 | 0 | - |
- May - 2021 |
No Image | |
714 (OG) |
191437-180259 - Promotion of Community based Non Timber Forest Products (NTFP) in District Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.137 | 0 | 0 | 0 | 0 | 3.137 | 0 | - |
- May - 2021 |
No Image | |
715 (OG) |
191422-180493 - Strengthening of NTFP in TDs. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 1.273 | 0 | 0 | 0 | 0 | 1.273 | 0 | - |
- May - 2021 |
No Image | |
716 (OG) |
191449-120303 - Development of NTFP Activities in FATA. (Revised) [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 154.194 | 93.125 | 0 | 0 | 0 | 0 | 93.125 | 0 | - |
- May - 2021 |
No Image | |
717 (OG) |
191420-180578 - Development of NTFP activities in Sub-Division Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 20 | 3.088 | 0 | 0 | 0 | 0 | 3.088 | 0 | - |
- May - 2021 |
No Image | |
718 (New) |
195217-Merged Areas Integrated Development Forestry Sector Project. (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 3766 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
719 (OG) |
151060-Upgradation of BHU Aza Khel to RHC, District Peshawar. |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 33.5 | 30 | 10 | 10 | 7.566 | 41.066 | 36.5 | 64% |
41% May - 2021 |
01- Unit
Main building - GF - completed. Black-B - FF Floor roof laid.
T/W & B/W completed. S/S in progress.
Finishing in progress. |
No Image |
Scope of work
| |||||||||||||||||||
720 (OG) |
170653-Upgradation of BHU Hazar Khwani to RHC, Peshawar. |
Peshawar BD-2 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 101.938 | 21 | 50 | 30 | 30 | 15 | 36 | 30.938 | 70% |
35% May - 2021 |
01- Unit
BW Completed.
S/Strucutre in progress.
TS submitted to SE |
No Image |
721 (OG) |
170387-Up-gradation of BHU Sard Cheena, Swabi to RHC |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 176.662 | 5.21 | 1 | 0 | 0 | 0 | 5.21 | 170.452 | 4% |
3% May - 2021 |
01- Unit
Land payment made of Rs. 5.21 M but site not yet Handed Over by DHO. |
No Image |
BHU Sard China PK-33 Swabi
Scope of work:
| |||||||||||||||||||
722 (OG) |
180597-Re-construction of 02 BHUs at UCs Baghicha & Fatma. Mardan. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 79.975 | 19.725 | 10 | 50 | 50 | 20 | 39.725 | 50.25 | 37% |
50% May - 2021 |
02- Units
1. Demolishing in progress. Main Building - flooring in progess.
2. BW 90% completed.
Tubewell boring completed. |
No Image |
BHU Baghicha Pk-50.
BHU BHU Fathima Pk-50 | |||||||||||||||||||
723 (OG) |
180601-Establishment of 01 BHU in District Shangla. |
Shangla |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 53.425 | 0 | 50 | 20.462 | 20.462 | 13.251 | 0 | 0 |
May - 2021 |
MB Roof level, Hostel DPC level & Developmental work in progress.
Snow Bound Area |
No Image | |
Establsiment of BHU Bela walia UC pir Khan Pk 23
Scope of work:
| |||||||||||||||||||
724 (OG) |
151062-Upgradation of BHU Darmai to RHC in Tehsil Matta, District Swat. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 96.979 | 0 | 0 | 0 | 0 | 96.979 | 3.021 | - |
97% May - 2021 |
No Image | |
Darmai Swat | |||||||||||||||||||
724 (OG) |
151062-Upgradation of BHU Darmai to RHC in Tehsil Matta, District Swat. |
Shangla |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 99.999 | 0.001 | 0.001 | 0 | 0 | 99.999 | 0 | 100% |
100% May - 2021 |
Main building up to roof level. Paramedic HostelTop beam and Developmental work in progress. |
No Image |
Darmai Swat | |||||||||||||||||||
724 (OG) |
151062-Upgradation of BHU Darmai to RHC in Tehsil Matta, District Swat. |
Swat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 261.425 | 96.979 | 10 | 10 | 10 | 0 | 96.979 | 154.446 | 41% |
37% May - 2021 |
Main building completed & handed over category-III & IV finishing stage.
Revised Scope ( 02 Additional Units)
BHU Sakhara - Tender called
BHU Aghal - Tender called |
No Image |
1. Up-Grdation of Darmai to RHC in Tehsil Matta, District Swat.
2. Estab: of BHU Sakhara Fazal Baig Ghari District Swat
3. Estab: of BHU Aghal Bartana District Swat | |||||||||||||||||||
725 (OG) |
80643-Upgradation of 10 BHUs to RHCs in Khyber Pakhtunkhwa, on need basis. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 60.021 | 55.941 | 0 | 0 | 0 | 0 | 55.941 | 4.08 | - |
93% May - 2021 |
Completed & H/O (1 unit). |
No Image |
BHU Village Kangra PK-51 | |||||||||||||||||||
725 (OG) |
80643-Upgradation of 10 BHUs to RHCs in Khyber Pakhtunkhwa, on need basis. |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.122 | 60.134 | 2 | 2 | 2 | 0 | 60.134 | 13.988 | 82% |
79% May - 2021 |
01- Unit
Finishing in progress. |
No Image |
BHU Naran PK-30
Scope of work:
| |||||||||||||||||||
725 (OG) |
80643-Upgradation of 10 BHUs to RHCs in Khyber Pakhtunkhwa, on need basis. |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 395.078 | 269.038 | 17.071 | 17.071 | 17.071 | 7.071 | 276.109 | 108.969 | 72% |
70% May - 2021 |
04- Units
1. Finishing in progress
2. Finishing in progress
3. Finishing in progress
4. Finishing in progress |
No Image |
1) BHU Khazana Dheri PK-23
2) BHU Shiekh Yousaf S/T Gari Daulatzai Pk-51
3) BHU Sawal Dher Pk-49
4) BHU Bakhshali Gaddar Pk-50.
Scope of work:
| |||||||||||||||||||
725 (OG) |
80643-Upgradation of 10 BHUs to RHCs in Khyber Pakhtunkhwa, on need basis. |
Nowshera |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 55.561 | 46.097 | 5 | 5 | 5 | 2 | 48.097 | 4.464 | 92% |
87% May - 2021 |
Main building - GF/FF - completed. Residential portion 03Nos Banglow finishing in progress. Cat-IV&V Residence finishing in progress. Labour Block Flooring plastering in progress.
TS Submitted |
No Image |
Upgrd of Khai BHU in Nowshera
Scope of work:
| |||||||||||||||||||
725 (OG) |
80643-Upgradation of 10 BHUs to RHCs in Khyber Pakhtunkhwa, on need basis. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 980.409 | 643.068 | 10 | 10 | 0 | 0 | 643.068 | 0 | - |
- May - 2021 |
No Image | |
726 (OG) |
90350-Strengthening of Planning Cell of Health Department. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 98.953 | 84.107 | 0 | 0 | 0 | 0 | 84.107 | 0 | - |
- May - 2021 |
No Image | |
727 (OG) |
110614-Social Health Protection Initiative for Khyber Pakhtunkhwa(KFW assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 165.9 | 107.872 | 0 | 0 | 0 | 0 | 107.872 | 0 | - |
- May - 2021 |
No Image | |
728 (OG) |
140773-Health Sector Reforms Unit in Health Department. (Phase-III) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 51.061 | 40.944 | 0 | 0 | 0 | 0 | 40.944 | 0 | - |
- May - 2021 |
No Image | |
729 (OG) |
140775-Establishment of Independent Monitoring Unit in Health Department. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 687.039 | 294.949 | 0 | 0 | 0 | 0 | 294.949 | 0 | - |
- May - 2021 |
No Image | |
730 (OG) |
140811-Strengthening of the Rehabilitation Services for Physically Disabled at Health Department Khyber Pakhtunkhwa. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 149.992 | 135.119 | 0 | 0 | 0 | 0 | 135.119 | 0 | - |
- May - 2021 |
No Image | |
731 (OG) |
151066-Estab. of BHU at Koz Shammal UC Battera District Buner and at Shahidan Banda Tehsil Takht Nasrati & BHU at Mandawa UC Latamber, Karak and Kifayat kot Gohar Ka Nar Dillasah Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 69.337 | 28.75 | 8 | 8 | 8 | 3.441 | 32.191 | 32.587 | 53% |
46% May - 2021 |
01- Unit
M/Bld: roof completed, B/wall 80% Completed, Structure in progress. Tube well compelted |
No Image |
BHU Kifayat Kot Goraka Nar Dilasa Shah PK-71,
Scope of work:
| |||||||||||||||||||
731 (OG) |
151066-Estab. of BHU at Koz Shammal UC Battera District Buner and at Shahidan Banda Tehsil Takht Nasrati & BHU at Mandawa UC Latamber, Karak and Kifayat kot Gohar Ka Nar Dillasah Bannu. |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 58.834 | 5.655 | 14 | 14 | 14 | 13.48 | 19.135 | 39.179 | 33% |
33% May - 2021 |
01-Unit
M/B roof in progress
Type III foundation in progress
Dev: work 65%
Demand Rs: 20 M (Liability) |
No Image |
BHU Koz Shamal Battera PK-78
Scope of work:
| |||||||||||||||||||
731 (OG) |
151066-Estab. of BHU at Koz Shammal UC Battera District Buner and at Shahidan Banda Tehsil Takht Nasrati & BHU at Mandawa UC Latamber, Karak and Kifayat kot Gohar Ka Nar Dillasah Bannu. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 117.317 | 50.45 | 22 | 22 | 22 | 11.069 | 61.519 | 44.867 | 62% |
52% May - 2021 |
2 units -
BHU Shahidan - MB Flooring in progress.
BW 80% completed.
G/Room 90% completed.
T/Well Bore completed.
Type-III&IV Flats roof level. BHU Mandawa
MB - Flooring in progress.
B/W & G/Room completed. |
No Image |
1) BHU Shahidan Banda Tehsil Takhti Nasratti? Rs; 60.115 M
2) BHU Mandawa U/C Latamber.?. Rs; 57.202 M
Scope of work:
| |||||||||||||||||||
731 (OG) |
151066-Estab. of BHU at Koz Shammal UC Battera District Buner and at Shahidan Banda Tehsil Takht Nasrati & BHU at Mandawa UC Latamber, Karak and Kifayat kot Gohar Ka Nar Dillasah Bannu. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 248.4 | 84.855 | 16 | 16 | 0 | 0 | 84.855 | 0 | - |
- May - 2021 |
PC-I/DCE for Rs.51.478 m re-submitted. DDWP held o |
No Image |
732 (OG) |
160232-Strengthening Health Management Information System/District Health Information System in Khyber Pakhtunkhwa (Phase-II) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 49.654 | 40.508 | 0 | 0 | 0 | 0 | 40.508 | 9.146 | - |
82% May - 2021 |
1- BW- 90%Completed.
2- Office Block=Finishing
3- Staff Room =Finishing
4-3-Nos Resorts=Finishing
5- OHT 400Gln completed.
6- S/Tank Completed.
7- Distributin = Completed
Remaining Dev: Work in progress. |
No Image |
732 (OG) |
160232-Strengthening Health Management Information System/District Health Information System in Khyber Pakhtunkhwa (Phase-II) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 294.24 | 187.612 | 0 | 0 | 0 | 0 | 187.612 | 0 | - |
- May - 2021 |
No Image | |
733 (OG) |
160608-Upgradation of 5 BHUs to RHCs on need basis |
Mardan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 122.408 | 67.561 | 9 | 9 | 9 | 9 | 76.561 | 45.847 | 63% |
63% May - 2021 |
01- Unit
Main building - roof in progress.
GF/FF Flooring in progress.
BW in progress. |
No Image |
BHU Garyala PK-30
Scope of work:
| |||||||||||||||||||
733 (OG) |
160608-Upgradation of 5 BHUs to RHCs on need basis |
Peshawar BD-1 |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 374.009 | 0.536 | 14.75 | 14.75 | 14.75 | 1.43 | 1.966 | 358.723 | 4% |
1% May - 2021 |
02- Units
01-work started, Design recived form Consultants, B/Wall in progress
02 -Work will be start stay order vacated. |
No Image |
1. BHU Mera Surizai ? Rs: 185.967 M
2. BHU Kafoor Dheri ? Rs: 188.042 M
Scope of work
BHU Mera Surizai and BHU Kafoor Dheri
| |||||||||||||||||||
733 (OG) |
160608-Upgradation of 5 BHUs to RHCs on need basis |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 809.889 | 293.151 | 10 | 10 | 0 | 0 | 293.151 | 0 | - |
- May - 2021 |
No Image | |
733 (OG) |
160608-Upgradation of 5 BHUs to RHCs on need basis |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 266.796 | 229.955 | 5.25 | 5.25 | 5.25 | 4.5 | 234.455 | 31.591 | 88% |
88% May - 2021 |
02- Units
1. M/Buld: Plastering in progress & Cat: III/IV Flats S/Str. in progress
2. Finishing in progress |
No Image |
1) BHU Zaroobi PK-35.?.?. RS: 133.398 (TS 119.0977)
2) BHU Dagai PK-47.?.?. RS: 133.398
Scope of work:
| |||||||||||||||||||
734 (New) |
200209-F/S for Functionalization/Up-gradation of BHU Zaida to RHC level. |
Swabi |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
PC-II Rs. 10.00 M submitted to DHO Swabi for approval.
Pre- PDWP held on 19-01-2020. Deffered |
No Image |
/Up-gradation of BHU Zaida to RHC level. | |||||||||||||||||||
735 (New) |
200210-F/S for Upgradation of BHU Olandar to RHC level Shangla. |
Shangla |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
PC II approved DCSC meeting held on 4/5/2021. |
No Image |
BHU Olandar to RHC level Shangla. | |||||||||||||||||||
736 (New) |
200040-Rehabilitation of all RHCs across KP & conversion of 50 RHCs into 24/7 facilities. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1000 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
737 (New) |
200042-Outsourcing of supply chain of medicines and supplies. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 200 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
738 (New) |
200045-Strengthening of all BHUs across KP & conversion of 200 BHUs into 24/7 SBA facilities. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 1500 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
739 (New) |
200048-Institutional Strengthening of Health Department. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 100 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
740 (New) |
200159-Khyber Pakhtunkhwa Human Capital Investment Project. (IDA Credit of US$ 49.6 million and IDA grant US$ 35.4 million). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.003 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
741 (New) |
200293-Strengthening of Medico-Legal Trainings. |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 |