Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
475 (OG) |
191345-170104 - Construction/Regularization of exising Functional Community Schools in District Kurram. [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40 | 20 | 10 | 10 | 10 | 7.891 | 27.891 | 10 | 75% |
70% May - 2021 |
06- Units
1 Completed & H/O
2 Completed & H/O
3. Finishing in progress
4 Site disputed
5 site dispute
6 Roofing in progress, & CW is progress Flooring completed |
No Image |
1- Buland Khel .?. Rs: 6.491 M
2- M.S Alisherai Upper Kurram .?. Rs: 6.491 M
3- FCS Kotrai .?. Rs: 6.692 M
4- M.S Ghaghzai C.K .?. Rs: 6.692 M
5- M.S Warsta Mela C.K .?. Rs: 6.692 M
6 - GMPS Dogar CK .?. Rs: 6.692 M | |||||||||||||||||||
476 (OG) |
191308-170387 - Provision of Furnitures for Students in Existing Functional Schools in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 45 | 15 | 0 | 0 | 0 | 0 | 15 | 0 | - |
- May - 2021 |
No Image | |
477 (OG) |
191331-170130 - Upgradation of 04 Primary Schools to Middle Status and 02 No Middle Schools to High Status in District Orakzai. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 86.912 | 0.285 | 56.804 | 42.608 | 42.608 | 14.547 | 14.832 | 29.823 | 66% |
17% May - 2021 |
06- Nos Units alll in porgess
1. upto DPC Level
2. upto DPC Level
3. upto DPC Level
4. Not started
5. Dispute
6. Foundation in progress |
No Image |
1. GPS Mandra Khel .?. Rs:10.192 M
2. GPS Zawan Mishti .?. Rs: 10.663 M
3. GPS Sungrani Feroz Khel .?. Rs: 9.379 M
4. GGPS Tarrangi .?. Rs: 9.379 M
5. GMS Toor Kanri.?. Rs: 9.379 M
6. GGMS Kool (Ghiljo) .?. Rs: 25.586 M
| |||||||||||||||||||
478 (OG) |
191338-170132 - Establishment of Primary Schools in District Orakzai [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 40.881 | 40.881 | 40.881 | 23.248 | 23.248 | 0 | 100% |
77% May - 2021 |
06- Nos Units all in porgress
1) Layout given
2) Layout given
3) DPC in progress.
4) Upto DPC Level.
5) Upto DPC Level.
6) Foundation in progress. |
No Image |
1. GGPSS Pasaki Feroz Khel .?. Rs: 7.329 M
2. GGPS Balkot Bar Muhammad Khel .?. Rs: 7.329 M
3. GGPS Begnaik Ali Khel .?. Rs: 7.329 M
4. GGPS Landoka Mani Khel .?. Rs: 7.329 M
5. GGPS Khattakano Killi Biland Khel .?. Rs: 7.671 M
6. GGPS Chamna Jana .?. Rs: 7.329 M | |||||||||||||||||||
479 (OG) |
191264-160067 - Upgradation of Educational Institutions in Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 99.152 | 79.322 | 8.361 | 8.361 | 8.361 | 0.188 | 79.51 | 11.469 | 88% |
80% May - 2021 |
08- Units
1. Completed & H/O
2. Site issue
3. Completed & H/O
4. Completed & H/O
5. Completed & H/O
6. Site Dispute
7. Finishing in progress
8. Completed & H/O |
No Image |
1. GPS Lal Mat Kili Jamrud
2. GPS Tor Dara Jamrud
3. GGPS Hajaatmir Kili LKL
4. GGPS Raja Khan Killi Aka Khel Bara
5. GGPS Sher Haider
6. GGPS Gulab Kili Loe Shalman
7. GMS Mastak
8. GGPS Ajab Khan Shalobar Bara | |||||||||||||||||||
480 (OG) |
191265-170065 - Construction of 20 No Additional Class Rooms in Educational Institutions and 4 Nos Examination Hall in Khyber Agency. [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 60.025 | 47.007 | 6.945 | 6.945 | 6.945 | 6.945 | 53.952 | 6.073 | 90% |
90% May - 2021 |
19 - Units.
01-10 Completed & H/O
11. Work stopped
12-14 Completed & H/O
15. Work stopped
16-18 Completed & H/O
19 Finishing stage |
No Image |
1. GGPS Shah Muhammad Dargai
2. GPS Nazeer Loi Shalman
3. GGPS pero Khel Gulab
4. GPS Haleem Killi Jamrud
5. GPS Shah Noor Khel Jamrud
6. GPS Loi Shaiman No. 2
7. GGMS Ghariza Jamrud
8. GGMS Sur Kamar No.1 Jamrud
9. GPS Kam Shilman
10. GPS Karigar Garhi Bara
11. GPS Sultan Khel Bara
12. GPS Barami Alamsher Bara
13. GGPS Duran Gul Kohi Bara
14. GGMS Navy Kamar Bara
15. GPS Yr Zamad Killi
16. GGPS Amir Khan
17. GPS Spin Dhand
18. GPS Chirlanga Habib Gul Killi Bara
19. GPS Shin Drang | |||||||||||||||||||
481 (OG) |
191268-190280 - Reconstruction / Rehabilitation of fully damaged schools in Bara District Khyber under chines assistance Programme. |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 1628.988 | 86.629 | 46.073 | 138.443 | 138.443 | 138.441 | 225.07 | 1496.286 | 8% |
14% May - 2021 |
15- Pakages/ 50 Units
Layout given =36
Site issue communicated to DEO Khyber =13
Tender under process=2 |
No Image |
Pac: 1 .?. Rs: 102.865 M
Pac: 2 .?. Rs: 106.917 M
Pac: 3 .?. Rs: 112.993 M
Pac: 4 .?. Rs: 96.341 M
Pac: 5 .?. Rs: 104.558 M
Pac: 6 .?. Rs: 100.616 M
Pac: 7 .?. Rs: 112.818 M
Pac: 8 .?. Rs: 97.709 M
Pac: 9 .?. Rs: 98.474 M
Pac: 10 .?. Rs: 110.681 M
Pac: 11 .?. Rs: 110.315 M
Pac: 12 .?. Rs: 111.006 M
Pac: 13 .?. Rs: 100.580 M
Pac: 14 .?. Rs: 77.772 M
Pac: 15 .?. Rs: 101.866 M | |||||||||||||||||||
482 (OG) |
191262-170032 - Establishment of 7 Primary Schools in Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 29.265 | 23.544 | 12 | 9 | 9 | 0.482 | 24.026 | 0 | 100% |
82% May - 2021 |
07- Units
1. Completed
2. Roof level
3. Completed & H/O
4. Finishing
5. Completed
6. Work stopped on direction of Edu: Deptt:/ MNA
7. Completed |
No Image |
1. GPS at Sailogo Pindiali
2. GGPS at Jarobi Darra Baizai
3. GGPS at Mirza Khel Qandhari Safi
4. GPS at Dawezai
5. GPS at Shati Mena AMbabar
6. GPS at Sheikh Baba
7. GGPS Shora Ambar | |||||||||||||||||||
483 (OG) |
191263-170384 - Provision of Furnitures for Students in Existing Functional Schools in Mohmand Agency. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 20 | 0 | 0 | 0 | 0 | 20 | 0 | - |
- May - 2021 |
No Image | |
484 (OG) |
191390-110098 - Reopening of Functional Community Schools in Mohmand. [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 118.476 | 107 | 0 | 0 | 0 | 0 | 107 | 0 | - |
- May - 2021 |
No Image | |
485 (OG) |
191305-170383 - Provision of Furnitures for Students in Functional Schools, Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
No Image | |
486 (OG) |
191357-170001 - Up-gradation of Educational Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 223.8 | 78.094 | 106.108 | 39.904 | 39.904 | 39.904 | 117.998 | 39.598 | 82% |
53% May - 2021 |
06- Units
1. H/O
2. Flooring
3. H/O
4. H/O
5. Roofing in progress
6. Roofing in progress
Cannot be completed due to late work started i.e Dec 2020 |
No Image |
1 GHS Khar No.1 to Higher Status
2 50 studendt Hostel GHS Khar No.1
3 Bachelor Hostel in GHS Khar No.1
4 GHSS Khat to Higher Stats
5 GHS Barkhalozo Mamund to Higher Status
6 Const: of Academic Block GHS Barkholozo
7 Student Hostel in GHS Barkholozo
8 Teacher Hostel Developmenal work in GHS Barkholozo | |||||||||||||||||||
487 (OG) |
191358-170002 - Construction of Additional Class rooms in Educational Institutions (having high Enrollment in descending orders) in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 399.844 | 257.776 | 30 | 21.521 | 21.521 | 21.521 | 279.297 | 112.068 | 72% |
70% May - 2021 |
113 - Units.
34 Units- H/O
53 Units - Completed
17 Units - Finishag stage
31 Unit in pogress
03 Units - Dispute
P-II Demand Rs. 182 M |
No Image |
| |||||||||||||||||||
488 (OG) |
191359-170003 - Provision of Missing / Basic Facilities and Solarization in Existing Educational Institutions in Bajaur Agency. [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 199.823 | 138.901 | 25.202 | 18.559 | 18.559 | 18.559 | 157.46 | 35.72 | 82% |
79% May - 2021 |
86- Units
52 Units - Completed
10 Units Finihisng
15 Units In progress
07 Units Disptue
Demand Rs: 60 M |
No Image |
87 Units | |||||||||||||||||||
489 (OG) |
191272-170428 - Removal of Staff Defficiencies in Newly Opened Areas in Edcation, Tribal Districts. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 444.919 | 153.9 | 0 | 0 | 0 | 0 | 153.9 | 0 | - |
- May - 2021 |
No Image | |
490 (OG) |
191303-150083 - Provision of Support to High Performing Schools in FATA. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.52 | 0 | 0 | 0 | 0 | 0 | 0 | 65.52 | - |
- May - 2021 |
No Image | |
490 (OG) |
191303-150083 - Provision of Support to High Performing Schools in FATA. [MA] |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.52 | 46.97 | 0 | 0 | 0 | 0 | 46.97 | 0 | - |
- May - 2021 |
No Image | |
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.72 | 15.633 | 0.683 | 0.683 | 0.683 | 0.683 | 16.316 | 0 | 100% |
100% May - 2021 |
10- Units
Completed & H/O =10
Demanded Rs. 1.660 M |
No Image |
1 GGPS Sadiq Abad
2 GGPS Zagari
3 GGPS Mamenzo
4 GGPS Tawheed Abad Arang
5 GGPS Mena 2
6 GGPS Dag Qalla Alijan
7 GGPS Bala Chingai
8 GGPS Tangai CHamang
9 GGPS Bandagai
10 GGPS Sweai | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7 | 7 | 2.342 | 2.342 | 2.342 | 0.74 | 7.74 | 0 | 100% |
100% May - 2021 |
F. R Bannu
05 Units Completed & H/O |
No Image |
F.R Bannu
1. GGPS Umar Jan Waligai .?. Rs: 1.4 M (TS 1.358)
2. GGPS Sarwar Jan Shoi Khel .?. Rs: 1.4 M (TS 1.358)
3. GGPS Amir Muhammad .?. Rs: 1.4 M (TS 1.358)
4. GGPS Sher Zada .?. Rs: 1.4 M
5. GGPS Mir Taj Ali Khan .?. Rs: 1.4 M (TS 1.358)
| |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 7.345 | 4.745 | 1.232 | 1.232 | 1.232 | 1.232 | 5.977 | 1.368 | 81% |
81% May - 2021 |
05- Units - all in finishing stage |
No Image |
1 GGPS Sheikh Mela
2 GGPS Darazinda
3 GGPS Landi Astandar
4 GGPS Tore Baz Kor
5 GGPS Cheena Aslam Khan | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 13.096 | 5.622 | 0.146 | 0.146 | 0.146 | 0.146 | 5.768 | 7.328 | 44% |
44% May - 2021 |
05- Units
1. Completed
2. Completed
3. Completed
4. Completed
5. Completed |
No Image |
1. GGPS Taralizarif Khan .?.. RS: 1.370 M
2. GGPS Sateen .?.. RS: 1.284 M
3. GGPS Bagan .?.. RS: 1.284 M
4. GGPS Jawdara .?.. RS: 1.284 M
5. GGPS Jalandar .?.. RS: 1.284 M
6. GGPS Luqman khel .?.. RS: 1.284 M
7. GGPS Ghozgari .?.. RS: 1.284 M
8. GGPS Bushehra .?.. RS: 1.284 M
9. GGPS Gosar .?.. RS: 1.284 M
10. GGPS Kochi .?.. RS: 1.284 M
| |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14 | 4.658 | 2.342 | 2.342 | 2.342 | 0.74 | 5.398 | 7 | 50% |
39% May - 2021 |
05- Units
1. Finsihing Stage
2. Finsihing Stage
3. Finsihing Stage
4. Finsihing Stage
5. Finsihing Stage |
No Image |
F.R Lakki
1. GGPS Gul Muhammad .?. Rs: 1.4 M (TS 1.358)
2. GGPS Zahir Shah .?. Rs: 1.4 M (TS 1.358)
3. GGPS Muhammad Nawaz .?. Rs: 1.4 M (TS 1.358)
4. GGPS Warey Gul .?. Rs: 1.4 M (TS 1.358)
5. GGPS Sattar Behtani Guli Kaskai .?. Rs: 1.4 M (TS 1.358) | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.76 | 0 | 14.92 | 14.92 | 14.92 | 4.729 | 4.729 | 0 | 100% |
32% May - 2021 |
10 - Units
Work recently started.
Layout given of 5 units.
Cannot be completed due to Late site handing |
No Image |
1 GGPS Mashair Kot
2 GGPS Samandar Kott
3 GGPS Ajab Khan
4 GGPS Wakeel KHan
5 GGPS Nek Zali Khan
6 GGPS Kajeer Kot
7 GGPS Sher
8 GGPS Qadireen Kot Tappi
9 Bakhtawar Kot Asad Khel
10 GGPS . Tahir | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 198.5 | 2.873 | 4.309 | 4.309 | 4.309 | 3.715 | 6.588 | 191.318 | 4% |
3% May - 2021 |
10- Units
02 units - Completed & H/O
08 units - in progress
1) Completed & H/O
2) Finishing in progress.
3) Upto roof level.
4) Upto roof level.
5) Foundation in progress.
6) Finishing in progress.
7) Land is not available.
8) Upto roof level.
9) Upto roof level.
10) Completed & H/O |
No Image |
1. GPS Sangra Mishhti .?.. Rs: 1.4 M (TS 1.359)
2. GGPS Star Sam .?.. Rs: 1.4 M
3. GGPS Syed Khalil Baba .?.. Rs: 1.4 M
4. GGPS Goeen .?.. Rs: 1.4 M
5. GGPS Shangiri .?.. Rs: 1.4 M
6. GGPS Khari Ali Kili .?.. Rs: 1.4 M
7. GGPS Kata Pana .?.. Rs: 1.4 M
8. GGPS Karhi Tall .?.. Rs: 1.4 M
9. GGPS Leary .?.. Rs: 1.4 M
10. GGPS Zawan Mishti .?.. Rs: 1.4 M (TS 1.368) | |||||||||||||||||||
493 (OG) |
191315-170322 - Provision of Facilities in Existing Primary Schools for Early Child Education (10 per Agency & 5 per FRs) [MA] |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.76 | 4.263 | 10.541 | 10.541 | 10.541 | 4.04 | 8.303 | 0 | 100% |
56% May - 2021 |
10- Units
All Work recently started. |
No Image |
1 GGPS M. Noor Mohammad
2 GG{S Wana Camp
3 GGPS Chaghmalai
4 GGPS Kari Kot
5GGPS Ihsan Ullah
6 GGPS Gul Munir
7 GGPS Mumtaz Kot
8 GGPS PA Colony Tank
9 GGPS Ibri Kalai
10GGPS Maulah Khan | |||||||||||||||||||
497 (OG) |
191376-140218 - Conversion of existing GHSs to Governor Model Schools in FATA. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 195.42 | 56 | 34.395 | 34.395 | 34.395 | 0 | 56 | 105.025 | 46% |
29% May - 2021 |
Main building F/F Celling in porgress, C/Wall 90%, Type-III Resideince roofing in progress, Type IV Quarter Foundation in progress |
No Image |
At Mishti Mela | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.544 | 10.007 | 18.179 | 18.179 | 18.179 | 10.646 | 20.653 | 10.358 | 73% |
54% May - 2021 |
1 unit- Finihsing stage
P-II Demand 8.311 M to completed the schmee |
No Image |
GHSS Gardai | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
FR Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 89.39 | 0 | 25 | 25 | 25 | 5.427 | 5.427 | 64.39 | 28% |
6% May - 2021 |
New building Exavation work in progress.
Existing building repair work in progress. |
No Image |
GHS Nader Bodin Khel FR Bannu | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 200.23 | 37.177 | 27.78 | 27.78 | 27.78 | 27.78 | 64.957 | 135.273 | 32% |
32% May - 2021 |
05- Nos Units
1. G/F roof laid
2. Civil work in progress
3. Repiar works in progress
4. G/F Plaster work in progress
5. Finishing stage |
No Image |
1. GHSS Spin Dhand
2. GHSS Jamrud
3. GGHSS Kalanga Bara
4. GGHS Landi Kotal
5. GHSS Paindi Lalma
| |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 141.5 | 50.268 | 16.106 | 16.106 | 16.106 | 16.106 | 66.374 | 75.126 | 47% |
47% May - 2021 |
02- Units
1. GF Mansory, Paint of old building, library foundation in progress upto roof level.
2. Completed |
No Image |
1. GGHSS Luqman Khel UK .?. Rs: 56.00 M
2. GSNHHSS Shalozan UK .?. Rs: 12.00 M | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.143 | 5.721 | 23 | 23 | 23 | 14.354 | 20.075 | 49.422 | 37% |
26% May - 2021 |
03- Units
1. Flooring in progress, B/Wall 30% Completed
2. B/W & Main Building in progress.
3. Room upto intieal level, Hall layout given, Tube well completed |
No Image |
1. GHS Ghallani ? Rs: 29.374 M
2. GGHS Ghallani ? Rs: 16.729 M
3. GHS Prang Ghar ? Rs: 21.270 M | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.981 | 14 | 26.981 | 26.981 | 26.981 | 17.065 | 31.065 | 0 | 100% |
76% May - 2021 |
1- No Unit Work in progress. |
No Image |
GHSS Eidak | |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 69.872 | 0 | 22.731 | 22.731 | 22.731 | 13.61 | 13.61 | 47.141 | 33% |
19% May - 2021 |
03 Units
1. Land not available
2. S/Structure in progress
3. S/Structure in progress |
No Image |
1. GHS Und Khel
2. GHS Kalaya Khel
3. GHS Sarobi Garhi
| |||||||||||||||||||
498 (OG) |
191383-160435 - Standardization of exiting 21 HSS under QIP in Tribal Districts of Merged Areas [MA] |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 40.981 | 14 | 9.883 | 9.883 | 9.883 | 6.883 | 20.883 | 17.098 | 58% |
51% May - 2021 |
2- Units
1. Finishing
2. Roof level |
No Image |
1- GHSS Shahoor.
2 GHSS Ashkar Kot | |||||||||||||||||||
499 (OG) |
191292-180435 - Provision of Missing / Basic Facilities, Rehabilitation / Construction of Additional Class Rooms and Solarization in Existing Educational Institutions in Sub-Division Tank [MA] |
FR Tank |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 49.556 | 0 | 20 | 15.497 | 15.497 | 15.455 | 15.455 | 29.556 | 40% |
31% May - 2021 |
56- Units
10 units - Completed
43 units - in progress
03 Units - not yet started
Demand Rs: 25 M |
No Image |
| |||||||||||||||||||
500 (OG) |
191293-180436 - Raising of Boundary wall, Fixing of barbed Wire & other security measures in Sub-Division Tank [MA] |
FR Tank |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.8 | 19.8 | 3.01 | 3.01 | 3.01 | 0.264 | 20.064 | 0 | 100% |
100% May - 2021 |
11 units - Completed & H/O |
No Image |
| |||||||||||||||||||
501 (OG) |
191314-110241 - Re-opening of Functional Community Schools in FR Tank.2018-19 [MA] |
FR Tank |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 127.907 | 99.9 | 0 | 0 | 0 | 0 | 99.9 | 0 | - |
- May - 2021 |
No Image | |
502 (OG) |
191328-170241 - Upgradation of Existing Educational Institutions in Sub-Division Tank. [MA] |
FR Tank |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 95.728 | 6.068 | 71.457 | 51.614 | 51.614 | 39.383 | 45.451 | 18.203 | 81% |
47% May - 2021 |
11- components
01 Unit - Completed
09 unit - Work in progress.
01 Unit - Site issue (Jadeed Abad to High School) |
No Image |
| |||||||||||||||||||
503 (OG) |
191294-180438 - Provision of Missing/Basic Facilities, Rehabilitation / Construction of Additional Class Rooms and Solarization in Existing Educational Institutions in Sub-Division DI Khan [MA] |
FR DI Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 56.993 | 2.177 | 8.305 | 7.127 | 7.127 | 6.951 | 9.128 | 46.511 | 18% |
16% May - 2021 |
31- components
work in progress on all components. |
No Image |
1 GPS Danee
2 GGPS Khoie Pewar
3 GGPS Akhtar Khan
4 GPS Landi Kuter Zai
5 GPS Jatta Agha Bazha
6 GPS Khan Badin
7 GPS Upper Darzinda
8 GPS Bakhtiar Shah
9 GMS Zore Shahar
10GGPS Irfanullah Kor
11 GGPS Fareed Khan
12 GPS Tooray Baz
13 GGPS Mughal Kot
14 GGPS Yaseen Kor
15 GPS Khoie Pewar
16 GPS Dabbar Skhar Kona
17 GPS Sardar Mir Ajab Khan
18 GPS Cheena
19 GGPS Umaid Koroona
20GPS Raghasar
21 GPS Anwar Khan
22 GGPS Kaliki
23 GGMS Spalmaiwam
24 GPS sargai
25 GPS shiekh Mela
26 GPS Multani Ghafar Shah Koroona
27 GPS Ilyas Khazai
28 GPS Landi No.1
29 GHS Morga
30 GPS Ajab Khan
31 GPS Ghundai Kalan | |||||||||||||||||||
504 (OG) |
191324-170259 - Improvement, Rehabilitation, Provision of Missing Facilities and Solarization in Educational Institutions in FR Lakki. [MA] |
Lakki Marwat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 19.975 | 17.163 | 2.812 | 2.812 | 2.812 | 0.842 | 18.005 | 0 | 100% |
90% May - 2021 |
39- Units
All Completed & H/O |
No Image |
| |||||||||||||||||||
505 (OG) |
191336-170193 - Upgradation of Educational Institutions in Sub-Division Peshawar. [MA] |
FR Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 30 | 0 | 27.799 | 23.162 | 23.162 | 1.903 | 1.903 | 2.201 | 93% |
6% May - 2021 |
02 Units work in progress
1 DPC level
2 Lintel Level
Cannot be completed due to late site identificaiton |
No Image |
1 GMS to GHS Mohd. Shah Killi
2 GGPS to GGMS Lal zamir Afridi | |||||||||||||||||||
506 (OG) |
191337-170194 - Construction of Additional Class Room / Missing Facilities in FR Peshawar. [MA] |
FR Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25 | 16.099 | 13.071 | 11.07 | 11.07 | 5.165 | 21.264 | 0 | 100% |
85% May - 2021 |
08- Packages
20 Units work in progress on all compoents. |
No Image |
Package 1
1 GPS Aziz Ur Rehaman
2 GGPS Baz Gul Killi
3 GGPS Hassan Khan
Package 2
1 GPS Zarin Khel
2 GGPS M. Younas
3 GGPS Sawar Khan
Package 3
1 GPS Awal SHer
2 GPS Mohd. Gul
Package 4
1 GGPS Qarar Khan
2 GHSS Sama Badaber
3 GGMS Mir Haider
Package 5
1 GGMS Sadi Khan
2 GGHS War Khan
3 GGPS Hakeem Khan
Package 6
1 GHS Faridi
2 GPS Faridi No.3
3 GGPS Juma khan
Package 7
1 GGPS Abdur Rasheed
2 GHS Said Azam
Package 8
1 GHS Kandow | |||||||||||||||||||
507 (OG) |
191377-110251 - Re-Opening of Functional Community Schools in FR Peshawar. [MA] |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 54.83 | 45.8 | 0 | 0 | 0 | 0 | 45.8 | 0 | - |
- May - 2021 |
No Image | |
514 (New) |
191321- Establishment of Primary Schools (Boys & Girls) in District South Waziristan (AIP) |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 125 | 0 | 25 | 25 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
DCE Submitted for Rs. 272.878 M |
No Image |
515 (New) |
191363-Upgradation of 09 Primary Schools to Middle Status and 03 Middle schools to High Status in Mehsud Closed Area, District South Waziristan. (Umbrella) (AIP) |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 140 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
DCE submitted to Distt Edu officer.25/08/2020 for Rs, 172.185 |
No Image |
516 (New) |
191364-Regularization of 16 Nos of GCS Schools in Mehsud Area, District South Waziristan. (Umbrella) (AIP) |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 191.394 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
Site identification is awaited. |
No Image |
517 (New) |
191370-Up-gradation of 9 P.S to Middle Status & Up-gradation of 3 Schools from Middle to High Status in District South Waziristan. (Umbrella) (AIP) |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 113.705 | 0 | 25 | 25 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
Site identification is awaited. |
No Image |
518 (New) |
191374-Upgradation of 06 Primary Level Facilities to Middle Status, 01 Middle Level Facilitiy to High Status & Rehabilitation of 01 Existing Education Facilitiy in Ladha Sub Division (Closed Area), District South Waziristan.(AIP) |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 92 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
DCE submitted to Distt Edu officer.25/08/2020 for Rs. 89.642 |
No Image |
519 (New) |
191375- Upgradation of 03 Primary Level Facilities to Middle Status, 01 Middle School to High Status in Sarwakai Sub Division (Closed Area), District South Waziristan (AIP) |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 42.554 | 0 | 20 | 20 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
DCE submitted to Distt Edu officer.25/08/2020 for Rs. 52.600 |
No Image |
520 (New) |
191378- Construction of Buildings for 9 Community Schools, Up-gradation of 3 P.S to M.S (2 Girls & 1 Boys) & Upgradation of 9 P.S to M.S in District South Waziristan. (Umbrella) (AIP) |
South Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 180 | 0 | 30.347 | 30.347 | 0 | 0 | 0 | 0 | - |
- May - 2021 |
DCE is under preparation process. |
No Image |