Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : May - 2021,

Showing Page Number : 17 of 69

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
420
(OG)
170204-Reconstruction of 100 Middle Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 66 units).
Provincial
30-11--1 30-11--1 - 30-11--1 - 600.638 71.746 528.892 528.892 0 0 71.746 0 - -
May - 2021
No Image
420
(OG)
170204-Reconstruction of 100 Middle Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 66 units).
Shangla
30-11--1 30-11--1 - 30-11--1 - 16.247 0 11.5 11.5 11.5 4.759 4.759 4.747 71% 29%
May - 2021
F&P in progress
No Image
Reconstruction of GMS at Anar China Hangu
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Bannu
30-11--1 30-11--1 - 30-11--1 - 91.27 72.655 81.659 81.659 81.659 43.944 116.599 0 100% 100%
May - 2021
02- Units 1. Finishing stage 2. Main Building in progress. Middle section flouring in progress, B/wall completed 3 M/B long Column in progress
No Image
1) GHS Adnan Sardi Khel PK-72
2 GHS Ghazi Baka Khel
3 GHS Sarmast Mira Khel
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
D.I.Khan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
PC-I/DCE for Rs.46.85 m sumbitted to DEO M on 18/0
No Image
GHS Band Kurai (PK-65)
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 132.142 57.077 46.23 46.23 46.23 24.464 81.541 28.835 78% 62%
May - 2021
04- Units 1. Roof laid 2. G/F Roof laid 3. Plaster in progress 4. Lental Level Cannot be completed due to late site hand over.
No Image
1) GHS Paito Dara PK-94
2) GHS Makhai PK-95
3) GHS Kad
4. GHS Sia Warghar
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Hangu
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
DCE submitted DEO (M) Hangu.
No Image
Reconstruction of GHS Lodi Khel PK-83 Hangu
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Haripur
30-11--1 30-11--1 - 30-11--1 - 19 8.637 12.5 12.5 12.5 10.865 19.502 0 100% 100%
May - 2021
Roofing in progess.
No Image
GGHS No.2
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Kohistan
30-11--1 30-11--1 - 30-11--1 - 1600 0 0 0 0 0 0 1600 - -
May - 2021
PC-I/DCE submitted. Pre-PDWP held on 27/11/2017.
No Image
Kohistan (1 No HS)
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Lakki Marwat
30-11--1 30-11--1 - 30-11--1 - 59.708 26.869 32.838 32.838 32.838 13.008 39.877 0.001 100% 67%
May - 2021
03- Units 1. Completed & H/O 2. Shuttering in progress 3. DPC in progress
No Image
1-GHS Tap Takhti Khel PK-93  ? Rs; 33.218 M (TS 30.097)
2- GHS Jabu Khel ? Rs; 13.245 M
3. GHS Behram Khel ? Rs; 13.245 M
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Malakand
30-11--1 30-11--1 - 30-11--1 - 89.951 72.655 50 50 50 22.151 94.806 0 100% 100%
May - 2021
GF Roofing in progress
No Image
1) GCHMS Batkhela
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Mansehra
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
PC-I/DCE for Rs.40.047 m sumbitted to DEO
No Image
GGHS Shamdara
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Mardan
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
May - 2021
PC-I/DCE sumbitted.
No Image
1. GHS Doka Baba
2. GHSS Shaftal Banda
3. GGHSS Par Hoti
4. GHS Rustam
5. GGHSS Gujrat
6. GGHS NO. 01 Bicket Gung Mardan Higher Portion
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Nowshera
30-11--1 30-11--1 - 30-11--1 - 26.851 18.761 2.133 2.133 2.133 1.884 20.645 5.957 78% 77%
May - 2021
01-Unit Completed & PC-IV Sub. TS Submitted
No Image
GHS Banda Sheikh Ismail PK-13
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Peshawar
BD-1
30-11--1 30-11--1 - 30-11--1 - 137.96 9.64 74.49 74.49 74.49 63.075 72.715 53.83 61% 53%
May - 2021
03- Units 1. Middle portion roof laid. F/F column completed & shutring in progress. Middle portin plaster in progress. 2. Finishing 3. High School Urmar Maina Foundation in Progress. Cannot be completed due to site issues
No Image
1) GGHS Malogo PK-68   .?. Rs: 89.582 M
2) GGHS Warsak Colony (PK-66) .?. Rs: 48.378  M
2) GHS Urmar Maina (Pk-70).?. Rs: 32.506  M
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Peshawar
BD-2
30-11--1 30-11--1 - 30-11--1 - 48.9 10.7 7.058 7.058 7.058 7.038 17.738 31.142 36% 36%
May - 2021
01- Unit B/Wall Completed Finishing in progress
No Image
GGHS Sheikh Abad PK-0
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Provincial
30-11--1 30-11--1 - 30-11--1 - 828.708 237.108 591.6 591.6 0 0 237.108 0 - -
May - 2021
No Image
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Swabi
30-11--1 30-11--1 - 30-11--1 - 67.41 6.686 11.248 11.248 11.248 8.916 15.602 49.476 27% 23%
May - 2021
02 - Units 1-Finishing in porgress 2- Work order issued demolishing not yet done by Edu: Deptt:
No Image
GHS C. Sher Killi Pk-47
GGHS Pehor Hemlet (Pk43)
421
(OG)
170206-Reconstruction of 100 High Schools (B&G) on need basis in Khyber Pakhtunkhwa (less 79 units).
Swat
30-11--1 30-11--1 - 30-11--1 - 75 48.165 34 34 34 15.68 63.845 0 100% 85%
May - 2021
M/B Finihsing in progress, B/Wall in progress
No Image
GGHS Matta PK-84/09 (CM Directives)
422
(OG)
170529-Schools Improvement Program in two districts of Khyber Pakhtunkhwa Phase-II (less 26 units)
Mardan
30-11--1 30-11--1 - 30-11--1 - 165.283 45.56 77.722 77.722 77.722 64.763 110.323 42.001 75% 67%
May - 2021
04- Packages 28 Units 01 Package 07 Units 06 AA awaited 01 Lab Porotion Laba at G/F is laid 02 Package 07 Units 01 AA. issued Roof Laid, Brick Work in progress 06 AA awaited 03 Package 1. Flooring in progress 2. Roof level 3. Exam: Hall Completed & H/O 4. Finishing in progres 04 Package 06 units 04 AA. awaited 1. G/F Roof level 2. Main Bldg: flooring in progress, Examn: Hall flooring in process
No Image
Package-I .?. Rs: 28.695 M
1) GGMS Kaudari Bala PK-27
2)  GHS Sokai
3. GGHS Gaddar
4. GHS Kotki
5. GGHS Par Hoti
6. GGHSS Labour Colony
7. GHS Sawal DHer
Package-II .?? Rs; 13.162 M
1. GGPS Mohabbat Abad
2. GGPS Shakar Mori Rs: 13.162 (TS 12.484)
3. GGPS Sikandari Koroona
4. GPS Daggar
5. GPS Jehan Abad
6. GGPS Sadat Baba
7. GGPS Aslam Khan Koorna
Package .?.. Rs: 42.064 M
1. GGHS Saro Shah S/T GGHS Dako Baba
2. GGHS Pirsadi
3. GGHS Bala Garhi .?.. RS: 10.516 (TS 9.936)
4. GGHS Babeni  .?.. RS: 10.516 (TS 9.965)
5. GGHS Lundkhwar
6. GGHS Chamdheri
7. GHS Khan Pur
8. GHS Lundkhwar No. 2
9. GHS Konenaka
Package.?. IV.?.. Rs: 81.62 M
1. GGMS Kaudari Bala
2. GGMS Matha Jadeed
3. GGMS Khan Pur
4. GMS Hoti Par
5. GMS Mahal Zarin Abad
6. GGMS Cheena
422
(OG)
170529-Schools Improvement Program in two districts of Khyber Pakhtunkhwa Phase-II (less 26 units)
Nowshera
30-11--1 30-11--1 - 30-11--1 - 60.426 42.796 6.487 6.487 6.487 5.47 48.266 11.143 82% 80%
May - 2021
03- Units 1. Completed & H/O 2. Competed 3. Completed & H/O
No Image
1. GGPS Tangi Khattak Mohallah Pathan PK-13? Rs. 13.741 M
2. Upgrd of GGCMS Ghalla Dher to MS? Rs: 14.761 M
3. Upgrd of GMS Marhatti Banada to HSL? Rs: 31.924 M
422
(OG)
170529-Schools Improvement Program in two districts of Khyber Pakhtunkhwa Phase-II (less 26 units)
Provincial
30-11--1 30-11--1 - 30-11--1 - 1045 113 328.164 328.164 0 0 113 603.836 42% 11%
May - 2021
No Image
423
(OG)
180502-Capacitating Work Force and improving work environment in E&SE Department
Provincial
30-11--1 30-11--1 - 30-11--1 - 53.5 9.53 43.97 43.97 0 0 9.53 0 - -
May - 2021
No Image
424
(OG)
190113-Continuation of Ongoing ADP Schemes for Completion of Balance Work/Liabilities
Battagram
30-11--1 30-11--1 - 30-11--1 - 53.752 13.336 0 0 0 0 13.336 40.416 - 25%
May - 2021
04- Units 1 Work started 2 Finihsing 3 Roof level 4 Roof liad
No Image
1 GHS Battamori .?.. Rs: 38.475
2 GGMS Huthel .?.. Rs: 11.477 (TS 11.424)
3 GGHS Battagram .?.. Rs: 1.9
4 GHS Battagram No. 2 .?.. Rs: 1.9
424
(OG)
190113-Continuation of Ongoing ADP Schemes for Completion of Balance Work/Liabilities
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 97.36 13.336 47.465 0 0 0 13.336 36.559 62% 14%
May - 2021
Scheme dropped from ADP 2019-20
No Image
424
(OG)
190113-Continuation of Ongoing ADP Schemes for Completion of Balance Work/Liabilities
Kohistan
30-11--1 30-11--1 - 30-11--1 - 32.7 0 47.465 12.435 12.435 11.027 11.027 0 100% 34%
May - 2021
2- Units -Completed & H/O
No Image
1 GPS Yaqoobabad
2 GPS Zad Khar
424
(OG)
190113-Continuation of Ongoing ADP Schemes for Completion of Balance Work/Liabilities
Mansehra
30-11--1 30-11--1 - 30-11--1 - 51.727 0 47.465 1.439 1.439 0 0 4.262 92% -
May - 2021
07- Units 1. Roofing & Dev: Work in progress 2. Roofing & Dev: Work in progress 3. Finishing 4. Plastering 5. Roof Beam Laid 6. Roof Laid 7. S/S in progress
No Image
  1. GMS Nawasher PK 32
  2. GPS Shergarh PK 33
  3. GHS Gandain PK 34
  4. GGHS Bai Bohal PK 32
  5. GHSS Gundain PK 34
  6. GHS Chandor PK 32
  7. GGMS More Bafa
424
(OG)
190113-Continuation of Ongoing ADP Schemes for Completion of Balance Work/Liabilities
Provincial
30-11--1 30-11--1 - 30-11--1 - 97 0 47.465 47.465 0 0 0 0 - -
May - 2021
No Image
425
(OG)
190349-Reconstruction of dilapidated/dangerous Primary, Middle and Higher Schools on need bases in Khyber Pakhtunkhwa
Haripur
30-11--1 30-11--1 - 30-11--1 - 258.23 0 0 0 0 0 0 258.23 - -
May - 2021
Approved.
No Image
425
(OG)
190349-Reconstruction of dilapidated/dangerous Primary, Middle and Higher Schools on need bases in Khyber Pakhtunkhwa
Mansehra
30-11--1 30-11--1 - 30-11--1 - 79.916 0 0 0 0 0 0 79.916 - -
May - 2021
05- Units Tender floated on 08-06-2021
No Image
  1. GHS Jaba
  2. GMS Nakot
  3. GMS Mulhar
  4. GMS Potha
  5. GHS New Darband
425
(OG)
190349-Reconstruction of dilapidated/dangerous Primary, Middle and Higher Schools on need bases in Khyber Pakhtunkhwa
Mardan
30-11--1 30-11--1 - 30-11--1 - 77 0 0 0 0 0 0 77 - -
May - 2021
02- Units Tener under process.
No Image
1) Reconstruction of GPS Mistri abad No.2 District Mardan Pk-52
2) GPS Bago Banda Pk-52 Mardan.
3. GPS Garo Shah
4. GPS Main SHah
425
(OG)
190349-Reconstruction of dilapidated/dangerous Primary, Middle and Higher Schools on need bases in Khyber Pakhtunkhwa
Swabi
30-11--1 30-11--1 - 30-11--1 - 50.744 0 0 0 0 0 0 50.744 - -
May - 2021
03- Units Tender called on 22-04-21 and Technical evaulation under process
No Image
  1. GHS Managai
  2. GHSManeri Bala
  3. GPS No. 2 Adina
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Bannu
30-11--1 30-11--1 - 30-11--1 - 439.953 140.34 0 0 0 0 140.34 299.613 - 32%
May - 2021
12- Units 1. M/Bld: completed, Rehab: work 90% completed 2. 2nd floor roof laid 3. G/F & 1st floor roof laid 4. 1st floor roof laid 5. Class room portion 2nd floor roof laid 6. High portion finsihing in progress 7. 1st floor roof laid 8. 1st floor roof laid 9. 1st floor roof laid 10. 1st floor roof laid 11. 1st floor roof laid 12. Science lab G/F roof laid
No Image
1 GHSS Koti Saddat
2 GGHSS Sikandar Khel Bala
3 GHSS Mamash Khel
4 GGHSS Bannu
5 GCHSS Bannu
6 GHSS Ghoriwala
7 GGHSS Kakki
8 GGHSS Shahbaz Azmat Khel
9 GHSS Amandi Umer Khan
10 GHSS Ismaial Khel  
11 GHSS Salma Sikandar Khel
12 Shamshi Khel
 
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Buner
30-11--1 30-11--1 - 30-11--1 Line Deptt 418.219 11.52 0 0 0 0 11.52 406.699 - 3%
May - 2021
17- Units 1. Completed & PC-IV Sub. 2. Completed & PC-IV Sub. 3. Completed & PC-IV Sub. 4. Completed & PC-IV Sub. 5. G/F Roof laid/ Plaster in progress 6. G/F roof laid, Joint I, III G/F Roof shattering in progress 7. G/F Roof level, F/F Shittering 8. Roofling in progress/ 2nd Floor in progress 9. Roof level/ 1st floor colmn in progress 10. G/F roof level/ 1st floor in progress 11. G/F roofing in progress 12. G/F roof laid & brick work completed 13. G/F roofing in progress 14. G/F roof laid & brick work completed 15. Plinth level 16. Roofing in progress 17. G/F roof laid & Brick work in progress
No Image
1. GGHSS Panjtar
2. GHSS Nagrai
3. GHSS Pacha Kalay
4. GGHSS Kalpani
5.  GPS Adma Dara
6. GHSS Gadezai
7. GGPS Bagra UC Daggar Tehsil PK-20
8. GGPS Malakpur
9. GGPS/GGMS Katkala
10. GGHS Anghapur
11. GGPS Elai
12. GGMS Rega
13. GGPS Swarai
14. GGPS Takht a Band
15. GPS Kot Kay Kulyari
16. GPS Khaista Baba
17. GPS Toti Band
 
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Charsadda
30-11--1 30-11--1 - 30-11--1 - 71.977 0 0 0 0 0 0 71.977 - -
May - 2021
Approved. Technical & Finanical bids in progress
No Image
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 757.397 0 0 0 0 0 0 757.397 - -
May - 2021
13- Units All Completed
No Image
i) GGHSS Bilot Sharif. .?.. Rs: 28.083 (TS 27.710)
ii) GGHSS Daraban Kalan .?.. Rs: 63.714 (TS 63.914)
iii) GHSS Kath Garh .?.. Rs: 71.157 (TS 74.891)
iv) GGHSS Mitha Pur  .?.. Rs: 27.247 (TS 24.972)
v) GGHSS No.2 Kirra Alizai. .?.. Rs: 62.271 (TS 64.337)
vi) GHSS Rehmani Khel. .?.. Rs: 60.244 (TS 58.347)
vii) GHSS Abdul Khel. .?.. Rs: 42.867 (TS 41.165)
viii) GHSS Chaudhwan. .?.. Rs: 61.584 (TS 61.784)
ix) GHSS Kot jai. .?.. Rs: 77.313 (TS 75.036)
x) GHS Kurai  .?.. Rs: 40.316 (TS 37.143)
xi) GHSS Lar  .?.. Rs: 40.591 (TS 40.089)
Xii) GHSS Mandhran Kalan. .?.. Rs: 61.921 (TS 61.170)
Xiii) GHS No. Islamia .?.. Rs: 83.509 (TS 91.790)
 
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 231.576 0 0 0 0 0 0 231.576 - -
May - 2021
06- Units 1. Finishing in progress 2. Finishing in progress 3. 1st floor S/Strcture as in progress 4. Roofing in progress 5. G/F roof laid 6. G/F roof laid
No Image
1. Resont: of GGPS Sado Dir Lower
2. Resont: of GGPS Masho Dir Lower
3. Resont: of GGPS Sar Chinaroona Dir Lower
4. Resont: of GGPS Quaray Dir Lower
5. Resont: of GCMHS Timergara Dir Lower
6. Resont: of GHS Dehrai Talash Dir Lower
 
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Haripur
30-11--1 30-11--1 - 30-11--1 - 48.675 0 0 0 0 0 0 48.675 - -
May - 2021
Approved.
No Image
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Karak
30-11--1 30-11--1 - 30-11--1 - 476.411 188.328 0 0 0 0 188.328 288.083 - 40%
May - 2021
9 units - Work in progress all units. 05 units completed & H.O 07 in progress
No Image
1) GHSS Jehangiri .?.. Rs; 27.268 M
2) GHSS Bogara .?.. Rs; 52.224 M
3) GHSS Warana .?.. Rs; 39.357 M
4) GGHSS Teri .?.. Rs; 30.308 M
5) GHSS Shah Salim .?.. Rs; 73.567 M
6) GHSS Chanda Khuram .?.. Rs; 64.963 M
7) GHSS Nari Panoos .?.. Rs; 81.833 M
8) GHSS Jandari .?.. Rs; 72.567 M
9) GHSS Karak City .?.. Rs; 8.337 M
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Kohat
30-11--1 30-11--1 - 30-11--1 Line Deptt 60.432 0 55.869 55.869 55.869 55.869 55.869 4.563 92% 92%
May - 2021
2- Units 1. Finishing in progress 2. Finishing in progress
No Image
1. Re-Const: of GGPS Mohallah Mian Badshah? Rs. 22.070 M, TS. 24.053 M
2. Re-Const: of GGCMHS Kohat PK-82 ? Rs. 38.362 M, TS. 41.591 M
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Lakki Marwat
30-11--1 30-11--1 - 30-11--1 Line Deptt 219.756 83.393 0 0 0 0 83.393 136.363 - 38%
May - 2021
04- Units - 1. A/Block, Ist floor compled, b/block completed 2. G/F plaster completed, 3. G/F plaster completed, 4. G/F plaster completed, Admin block completed
No Image
1. GHSS Dara Pezu .?. Rs: 56.137 M
2. GGHSS Titter Khel .?. Rs: 56.137 M
3. GHSS Abdul Khel
4. GHSS Landiwah
 
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Mardan
30-11--1 30-11--1 - 30-11--1 - 99.88 0 0 0 0 0 0 99.88 - -
May - 2021
Tender under process
No Image
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Peshawar
BD-1
30-11--1 30-11--1 - 30-11--1 Line Deptt 95.209 0 0 0 0 0 0 95.209 - -
May - 2021
DFID funded scheme, foundation raft concrete completed for main building Plinth beasm steel placing in progress.
No Image
GGMHSS Chamkani Peshawar.
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Peshawar
BD-2
30-11--1 30-11--1 - 30-11--1 Line Deptt 6.74 0 0 0 0 0 0 6.74 - -
May - 2021
02- Units 1- Completed 2- Completed
No Image
1. GHHSS Begum Shahab-Ud-Din Peshawar.?. Rs: 6.74 M (TS 4.922)
2. GHSS at Hayatabad.?. Rs: 20.24 M (TS 15.052)
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Provincial
30-11--1 30-11--1 - 30-11--1 - 0.001 0 0 0 0 0 0 0 - -
May - 2021
Phase-II: 62 Units Cost: 3090.80m (Capital) AA a
No Image
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Swabi
30-11--1 30-11--1 - 30-11--1 Line Deptt 263.113 0.77 0 0 0 0 0.77 262.343 - 0%
May - 2021
07- Units 1 Completed and PC-IV submitted 2 Completed. PC-IV submitted, 3 Completed & handed over. 4 Completed &PC-IV Submitted H/O to school Principal 5 Finishing in progress. 6 (2+2) Rooms Finishing in progress old block finishing in progress . 7 Completed PC-IV submitted.
No Image
1. GGHSS Lahor Swabi (Pk-45).
2. GHSS Bamkhel
3. GHSS Maneri Payan
4. GHSS Saleem Khan
5. GGHSS Baja Swabi
6. GGHSS Kalu Khan
7. GGHSS Kotha
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Swat
30-11--1 30-11--1 - 30-11--1 - 527.38 0 0 0 0 0 0 527.38 - -
May - 2021
34 Units 30 units - work in progress 03 units - work order issued 01 unit Land not availble 01 unit - Auction awatied 1. Work order issued 2. Foundation Completed, Retaining wall in progress 3. G/F Slab in progress 4. Prepartion for lean in progress 5. G/F Column 6. Approch road issue 7. Super structure 8. Lean Concert 9. DPC level 10. Land not finialized 11. DPC Level 12. Land not finailzied 13. Rock cutting 14. G/F slab 15. Excavation for foundation completed, R/Wall in progress 16. Layout given 17. Dismantling completed 18. Auction awaited 19. No land availble 20. G/F columns 21. Excavation for foundation 22. Dismantling awaited 23. Layout given 24. Layout given 25. Foundation concrete 26. Steel fixing in columns 27. G/F columns in porgress 28. Steel fixing in progress 29. Foundation concrete completed 30. Steel fixing in founcdation 31. Layout given 32. G/F slab 33. work order issued 34. work order issued
No Image
1 Up gradation of GPS Said Abad to Middle level .?. Rs: 12.718 M
2 Up gradation of GPS Awisha to Middle level .?. Rs: 12.718 M
3 Up gradation of GPS Madyat to M/L .?. Rs: 12.718 M
4 Up gradation of GPS Ragistun to M/L .?. Rs: 12.718 M
5 Up gradation of GPS Nawkhara .?. Rs: 12.718 M
6 Up gradation of GPS Gazal Baig .?. Rs: 12.718 M
7 Up gradation of GPS Doghagay .?. Rs: 12.718 M
8 Up gradation of GPS Lai Banda .?. Rs: 12.718 M
9 Up gradation of GPS Koza Gharrai .?. Rs: 12.718 M
10 Up gradation of GPS Landai Shah  .?. Rs: 12.718 M
11 Up gradation of GPS Peochar to Higher Level .?. Rs: 29.665 M
12 Up gradation of GGCMS Khariral Cham Matta to M/L .?. Rs: 12.718 M
13 Up gradation of GGPS Dandani No. 2 .?. Rs: 12.718 M
14 Up gradation of GGPS Rahatpur to M/L .?. Rs: 12.718 M
15 Up gradation of GGPS Ditpanai to M/L .?. Rs: 12.718 M
16 Up gradation of GGPS Darmai to M/L .?. Rs: 12.718 M
17 Up gradation of GGPS Ragaston  to M/L .?. Rs: 12.718 M
18 Up gradation of GGPS Awesha  to M/L .?. Rs: 12.718 M
19 Up gradation of GGPS Mangra (Sakhra) to M/L .?. Rs: 12.718 M
20 Rconstruction of GGPS Matta .?. Rs: 19.728 M
21 Rconstruction of GGPS Kot Darmai .?. Rs: 19.728 M
22 Rconstruction of GGPS Gall Shah .?. Rs: 19.728 M
23 Rconstruction of GGPS Koza Durash Khela  to M/L .?. Rs: 19.728 M
24 Rconstruction of GGPS Sinpora to M/L .?. Rs: 19.728 M
25 Rconstruction of GGPS Said Abd (Bodigram)  to M/L .?. Rs: 19.728 M
26 Rconstruction of GGPS Sijbanr  to M/L .?. Rs: 19.728 M
27 Rconstruction of GGPS Naranj Pura  to M/L .?. Rs: 19.728 M
28 Rconstruction of GGPS MATTA .?. Rs: 19.728 M
29 Rconstruction of GGPS Bala Baidara .?. Rs: 19.728 M
30 Rconstruction of GGPS Bagh Dheria .?. Rs: 19.728 M
31 Rconstructionof GGPS Oghaz Kass lalkoo .?. Rs: 19.728 M
32 Rconstruction of GGPS Charrai Lalko .?. Rs: 19.728 M
33 Standarization of GGCMHSS Saidu Sharif No.1 .?. Rs: 95.260 M
34 Up gradation of GPS Gadi to Middle level .?. Rs: 12.718 M
 
426
(OG)
190407-Standardization of Higher Secondary Schools in Khyber Pakhtunkhwa (DFID Assisted)
Tank
30-11--1 30-11--1 - 30-11--1 Line Deptt 90.968 0 0 0 0 0 0 90.968 - -
May - 2021
i) MB upto lintel level. Ii) Office lintel level. iii) P/Office Lintel level. Iv) T/Well completed.
No Image
GHSS Tank (Standarizaiton of GHSS Gul Imam)
427
(OG)
200024-Main Streaming of Proscribed Organization in KP
Provincial
30-11--1 30-11--1 - 30-11--1 - 265.645 0 0 0 0 0 0 0 - -
May - 2021
No Image
428
(New)
170647-Feasibility study & establishment of Cadet College at Bannu.(PC-II Approved)
Bannu
30-11--1 30-11--1 - 30-11--1 Line Deptt 3000 0 100 100 0 0 0 0 - -
May - 2021
PC-II approved. LOA issued. DCE for 2910 M submitted to E&SE
No Image
Cadet College at Bannu
428
(New)
170647-Feasibility study & establishment of Cadet College at Bannu.(PC-II Approved)
D.I.Khan
30-11--1 30-11--1 - 30-11--1 Line Deptt 3000 0 100 100 0 0 0 0 - -
May - 2021
PC-I submitted to Educaiton Department by Building Division Bannu. The record is not yet taken over by this office yet.
No Image
Cadet College at Bannu
Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69